Classification: GENERAL
FINANCIAL SUPERVISION SECTOR I OFFICE OF THE DEPUTY GOVERNOR
MEMORANDUM NO. M-2026-___
To : ALL RURAL BANKS AND COOPERATIVE BANKS
Subject : Live Implementation of the Enhanced Comprehensive Credit and
Equity Exposures Report of 2023 (COCREE 2.0)
The following shall be observed for the live implementation of the Enhanced
Comprehensive Credit and Equity Exposures Report of 2023, referred to as COCREE 2.0,
as prescribed under Circular No. 1184 dated 15 December 20231
:
- All Rural Banks and Cooperative Banks (RCBs) shall be eligible to a grace period from
penalties for reporting violations covering the live maiden reporting period
30 September 2025 of COCREE 2.0.
- RCBs that have complied early with the live submission of the maiden reporting
period 30 September 2025 within certain prescribed dates are eligible to the
following additional grace period:
Date of Compliance for live maiden
reporting of COCREE 2.0
Additional Grace Period
Compliant on or before
28 November 20252
Reporting periods 31 December 2025,
31 March 2026, and 30 June 2026
Compliant after 28 November 2025
but on or before 30 January 20263 Reporting period 31 December 2025
- The grace period covered in item nos. 1 and 2 shall however only apply to RCBs that
remain actively engaged in submitting the COCREE 2.0 through the BSP
Relationship Management System (BRMS) – Live Module.
- The updated schedule of the live implementation of COCREE 2.0 for the succeeding
reporting periods of RCBs is prescribed in the table below:
Quarterly Reporting Period Due Date
31 December 2025 26 May 2026
31 March 2026 30 June 2026
30 June 2026 and onwards 25 business days after reference period
Queries and/or clarifications about COCREE 2.0 can be referred to the CRSU at (632)
5306-2561, (632) 5306-3128, (632) 5306-3165, (632) 5306-3166, or cocree@bsp.gov.ph.
For compliance and proper guidance.
LYN I. JAVIER
Deputy Governor
___ May 2026
1 Other related regulatory issuances are BSP Memorandum Nos. M-2023-038 dated 18 December 2023,
M-2024-027 dated 20 September 2024, M-2024-043 dated 19 December 2024, and M-2025-035 dated
25 October 2025.
2 Previous due date of the live maiden reporting period 30 September 2025 prescribed in BSP Memorandum
No. M-2025-035
3 End date of pilot testing in the BRMS – COCREE 2.0 Sandbox prescribed in BSP Memorandum No.
M-2025-035
14