Bank Indonesia issued Circular No. 17/30/DPSP to establish implementing regulations for the operation of real-time fund settlement via the Sistem BI-RTGS infrastructure. The document defines key operational terms, outlines the Operator's duties regarding system reliability and participant monitoring, and specifies eligibility criteria and application procedures for banks and other institutions seeking participation. It further details the administrative requirements for becoming a participant, including fit and proper tests, security audits, and the authorization of proxy officials for system access.
Unofficial Translation No. 17/30/DPSP Jakarta, 13 November 2015 CIRCULAR LETTER Subject : Operation of Real Time Fund Settlement through Sistem Bank Indonesia-Real Time Gross Settlement In connection with the enactment of Bank Indonesia Regulation Number 17/18/PBI/2015 concerning Bank Indonesia Operated Systems for Management of Transactions, Administrations of Securities, and Real-Time Fund Settlement (State Gazette of the Republic of Indonesia of 2015 Number 273, Supplement to State Gazette of the Republic of Indonesia Number 5762), it is necessary to establish the implementing regulation on real time Fund Settlement through Bank Indonesia-Real Time Gross Settlement in Bank Indonesia Circular Letter as follows: I. GENERAL PROVISIONS In this Circular Letter:
Unofficial Translation to receiving Participant which name is mentioned in the Fund Transfer instruction until the fund is received by the beneficiary. 3. Bank Indonesia-Scripless Securities Settlement System, hereinafter referred to as BI-SSSS, means an infrastructure used as means of Transaction Administration and Administration of Securities conducted electronically. 4. Sistem BI-RTGS Operator, hereinafter referred to as the Operator, means Bank Indonesia which operates a system in real time Fund Settlement through Sistem BI-RTGS. 5. Sistem BI-RTGS Participant, hereinafter referred to as Participant, means any party who has fulfilled the requirements and obtained the approval of the Operatoras participant in Sistem BI-RTGS operation. 6. Fund Settlement Account, means Sistem BI-RTGS Participant’s account denominated in Rupiah and/or any foreign currencies administered in Bank Indonesia for Fund Settlement operation. 7. Current Account means the current account as determined in Bank Indonesia Regulation on current accounts in Bank Indonesia. 8. Representative Official means an official authorized to represent Current Account owner to withdraw fund, sign letters, and/or conduct activities related to Current Account in Bank Indonesia and Sistem BI-RTGS participation consisting of Management and/or Proxy Officials. 9. Management…
Unofficial Translation 9. Management means any director or official authorized to represent in Sistem BI-RTGS participation and Current Account relations under the applicable regulations for every Current Account owner as determined in Bank Indonesia regulation on current account in Bank Indonesia. 10. Proxy Official means Proxy Official without Substitution Right and/or Proxy Official with Substitution Right. 11. Proxy Official without Substitution Right means an official granted with special power without substitution right from Management or Proxy Official with Substitution Right to withdraw fund, sign letters, and/or conduct activities related to Current Account relations with Bank Indonesia and Sistem BI-RTGS participation. 12. Proxy Official With Substitution Right means an official granted with special power with 1 (one) substitution right from the Management to withdraw fund, sign letters, and/or conduct activities related to Current Account relations with Bank Indonesia and Sistem BI-RTGS participation. 13. Fund Settlement means the final settlement process of financial transaction by debiting and crediting Fund Settlement Account. 14. RTGS Central Node, hereinafter referred to as RCN, means Sistem BI-RTGS in the Operator side providing administration function for Fund Settlement Account, Fund Settlement, and other functions in Sistem BI-RTGS operation. 15. RTGS Participant Platform, hereinafter referred to as RPP, means Sistem BI-RTGS in the Participant side connected to RCN and used…
Unofficial Translation used by the Participant to conduct Fund Settlement instruction, access information, and/or manage the Participant’s data. 16. Bank means Commercial Bank as specified in the Law on banks, including branch offices of banks overseas and Sharia Banks including Sharia Business Units as specified in the Law on sharia banks. 17. Sharia Business Unit, hereinafter referred to as UUS, means Sharia Business Units as specified in the Law on sharia banks. 18. Connected User means any user administered and provided by the Operator to the Participant in order to access RCN through RPP and have Digital Certificate for security mechanism for Fund Settlement instruction delivery from RPP to RCN as well as receipt and delivery of administrative messages from and to RCN. 19. Unconnected User means any user registered by the Participant with RPP, which functions to construct instruction and conduct local activities, but unable to send instruction to RCN. 20. Digital Certificate means certificate in the form of protected file containing certificate owner identity, encryption key to verify the owner’s digital signature, and certificate validity period generated by Bank Indonesia Public Key Infrastructure. 21. Digital Certificate Hard Token means Digital Certificate stored in the eToken USB medium. 22. Digital Certificate Soft Token means Digital Certificate stored in the read-only optical medium which will be installed in RPP server. 23. United…
Unofficial Translation 23. United States Dollar Clearing House Automated Transfer System, hereinafter referred to as USD CHATS, means real time gross settlement system of Fund Transfer in United States Dollar in Hong Kong. 24. Payment-versus-Payment United States Dollar/Indonesian Rupiah mechanism, hereinafter referred to as USD/IDR PvP, means the mechanism to settle inter-Participant trading transactions of United States Dollar against rupiah, where the simultaneous settlement is conducted for both currency in RCN (for rupiah) and computer system of the operator of USD CHATS in Hong Kong (for United States Dollar). 25. Payment-versus-Payment, hereinafter referred to as PvP, means Fund Settlement mechanism in Rupiah in Sistem BI-RTGS for inter-Participant trading transactions in United States Dollar against Rupiah. 26. Queueing System means a mechanism regulating the order of Fund Settlement for unsettled transaction in Sistem BI-RTGS. 27. Guest Bank Facility means facility provided by the Operator for Participant as a back-up in the event of Unforeseeable Conditions and/or Emergency Condition which make the Participant unable to use Sistem BI-RTGS in the Participant’s location. 28. Unforeseeable Condition means the situation or condition occurring due to any failure of or damage to hardware, software, communication network, application, and supporting facilities of Sistem BI-RTGS affecting smooth operation of Sistem BI-RTGS. 29. Emergency…
Unofficial Translation 29. Emergency Condition means any condition occurring beyond the control of the Operator and/or Participant resulting in nonoperation of Sistem BI-RTGS due to, but not limited to, fire, riots, sabotage, and natural disasters, such as earthquakes and floods, declared by the authority or competent local official, including Bank Indonesia. II. OPERATOR A. Operator Organization
Unofficial Translation Payment System Management Department Compliance of Participant, Bank Indonesia’s Operated Payment System, and Internal Management Division Building D 3rd Floor Jalan M.H. Thamrin No. 2 Jakarta 10350 3. The Operator provides help desk to handle Sistem BI-RTGS operational issues faced by Participant at the following numbers: Phone : 021 2981 8888 Facsimile: 021 231 0485 4. In the event the addresses mentioned in number 2 and/or the phone and/or facsimile number mentioned in number 3 changes, the Operator will notify such change by sending a letter and/or other means. B. Duties and Authorities of the Operator For Sistem BI-RTGS operation, the Operator conducts the following:
Unofficial Translation c. RPP application and its enhancement, as well as Sistem BI-RTGS Operation Guidebook delivered by the Operator by letter and/or other means; d. Guest Bank facility; and e. other supporting facilities and infrastructures, including for operation of Fund Settlement mechanism in USD/IDR PvP in Sistem BI-RTGS. 3. Conduct Sistem BI-RTGS operational activities according to the specified time, among others are: a. conduct real time Fund Settlement activities for Fund Transfers; and b. provide data/information on the result of real time Fund Settlement for Fund Transfers. 4. Make efforts to guarantee the reliability, availability, and security of Sistem BI-RTGS operation, among others are: a. manage and operate RCN; b. provide help desk to handle operational issues in Sistem BI-RTGS operation and/or JKD; c. provide services related to participation in Sistem BIRTGS; d. determine the operational time of Sistem BI-RTGS operation; e. have minimum service standards for Sistem BI-RTGS operation, among others are time service standard for participation…
Unofficial Translation participation and service standard in Sistem BI-RTGS operation; f. determine and establish provisions and procedures for Unforeseeable Conditions and/or Emergency Condition; g. provide training to Participant candidate and periodic training to Participant; and/or h. determine the participation status of Participant. 5. Monitor Participant compliance with the provisions and procedures determined by the Operator. 6. Establish and impose administrative sanctions. 7. Determine the limit of transaction nominal value allowed in Sistem BI-RTGS, if necessary. 8. Determine types and cost of Sistem BI-RTGS operation, including the maximum cost limit imposed by a Participant on a customer. III. PARTICIPATION A. General Principles
Unofficial Translation 2. Other institutions approved as Participants by the Operator as specified in point 1.d are those supporting: a. safer and more efficient settlement of payment transactions, securities transactions, and financial market transactions; and/or b. effective monetary policy operation by Bank Indonesia. 3. If the Participant set forth in point 1.b. is a Bank carrying on conventional business activities simultaneously with business activities under sharia principles in the form of UUS, their participation in Sistem BI-RTGS operation for conventional business activities shall be separated from that in business activities under sharia principles. B. Requirements as Participants
Unofficial Translation e. have an audit result report of their internal system security in the last 1 (one) year if their internal system will be connected with Sistem BI-RTGS; f. clearing and/or settlement operators and other institutions which is Indonesian Legal Entity shall fulfill the following additional requirements:
Unofficial Translation b. have a cooperation agreement on the usage of infrastructure with another party managing the Sistem BI-RTGS infrastructure, which shall at least contain the following:
Unofficial Translation 7) statement that the agreement is not in contravention of Bank Indonesia provisions. 4. In the event the Participant candidate is an UUS and uses the infrastructure of its parent Bank, which becomes Participant, the arrangement clause set forth in point 3.b shall be specified in a written Bank internal policy and procedure. C. Procedure for Becoming a Participant The procedure for becoming a Participant in Sistem BI-RTGS operation is specified as follows:
Unofficial Translation 4. The application set forth in number 1 shall be completed with the following documents: a. copy of a valid business license from the competent institution, the license of which has been certified by the competent official or authenticated by the relevant Management; b. statement from a Participant candidate’s Management, declaring that the Participant candidate is not in any liquidation process or bankruptcy by using the format in example II.2 in Appendix II; c. statement from a Participant candidate’s Management, declaring RPP infrastructure readiness by using the format in example II.3 in Appendix II; d. in the event the Participant candidate uses another party’s infrastructure, the application set forth in number 1 shall be completed with the following additional documents:
Unofficial Translation using the format set forth in example II.5 in Appendix II; e. copy of fit and proper test decision of the Participant candidate’s Management issued by the relevant supervisory institution or Management composition according to the latest condition approved by the relevant supervisory institution; f. in the event the Participant candidate is a clearing and/or settlement operator and the other institution which is Indonesian Legal Entity, submit the following additional documents:
Unofficial Translation g. application from the Management to obtain administrator user, Connected User, and Digital Certificate by using the format set forth in example II.6 in Appendix II; h. participation data by using the format set forth in Appendix III; and i. report on the result of security audit on the Participant candidate’s internal system conducted by an internal auditor or independent auditor if such internal system will be connected with Sistem BI-RTGS. If the security audit is conducted by an internal auditor, completed with written statement from the Management declaring that the security audit is conducted independently. 5. The application set forth in number 1 is signed by a Participant candidate’s Management and submitted to the Operator at the address mentioned in point II.A.2.a. 6. For Participant candidate headquartered in the operational area of KPwDN, the application is submitted to the Operator and the copy is delivered to the relevant KPwDN. 7. If necessary, the Participant candidate shall provide the original documents required under the regulation on current account in Bank Indonesia set forth in number 2 and the document requirements set forth in point 4.a, 4.e, and 4.f.1) to the Operator. 8. Based…
Unofficial Translation 8. Based on the application set forth in point 1, the Operator may check to the Participant candidate’s location to ensure among others that information on the submitted documents matches Sistem BI-RTGS infrastructure readiness. 9. The Operator grants a principle approval for or rejection of a Participant candidate’s application set forth in number 1 no later than 25 (twenty five) business days as from the application and documents set forth in number 4 are received completely by the Operator under the following provisions: a. in the event the Participant candidate’s application is not approved, the Operator will submit a notice of such rejection and the reasons therefor. b. in the event the Participant candidate’s application is approved, the Operator will submit a principle approval containing among others:
Unofficial Translation b) sign an agreement on Sistem BI-RTGS usage by using the agreement format set forth in Appendix IV; and c) fulfill other requirements specified by the Operator. c. Participant candidate obtaining the principle approval shall fulfill:
Unofficial Translation
Unofficial Translation documents related to physical money withdrawal; (2) delivery and/or claim of administrative user, Connected User, Digital Certificate Hard Token, and/or Digital Certificate Soft Taken; (3) delivery and/or claim of BI Cheque and BGBI book; (4) delivery and/or claim of letters, reports, and other documents, both written and electronic, related to Current Accounts, participation, and the operation of Sistem BI-RTGS . The format of power of attorney from the Management to the Proxy Official as set forth in example II.10 in Appendix II. <PER 20160418> 4) The Management or Proxy Official With Substitution Right may confer power without substitution right on officer in the headquarter or branch office of the Participant candidate only for the following: a) to conduct physical money withdrawal as set forth in point 3).d).(1) by using the format as set forth in example II.11 in Appendix II; and b) to take and deliver the documents set forth in point 3).d).(3) and 3).d).(4) according to the Participant…
Unofficial Translation Participant candidate’s requirement and may be specified in one or more power of attorney in the format as set forth in example II.12 in Appendix II. 5) The number of Proxy Official or proxy officer is governed under the following provisions: a) The number of Proxy Official set forth in point
Unofficial Translation The number of officer for physical money withdrawal, including a third party officer appointed to make physical money withdrawal. c) The number of proxy officer set forth in point 4)b) to deliver and take the documents set forth in point 3)d)(3) and 3)d)(4) is 10 (ten) at the maximum for each Bank Indonesia office. 6) The power of attorney set forth in point 3).d) may be made in 1 (one) or more power of attorney according to a Participant candidate’s requirement. 7) The power of attorney set forth in point c.1) and c.4) is accompanied by a copy of valid identity as follows: a) Resident’s Identity Card (KTP), Driving License (SIM) or passport for Indonesian Citizen (WNI); or b) Passport, Temporary Residence Permit (KITAS), and work permit from the relevant institution for Foreign Citizens (WNA). d. Request letter from Representative Official to make a signature specimen for:
Unofficial Translation withdrawal set forth in point c.3).d).(1), primarily for Participant candidates in the KPwDN area. The request letter from Representative Official to make signature specimen by using the format set forth in example II.13 in Appendix II. 11. Primarily for proxy officer from the Management or Proxy Official With Substitution Right to conduct the actions set forth in point 10.c.3).d).(3) until 10.c.3).d).(4), signature specimen is not necessary. 12. Participant candidate submits the documents set forth in number 10 to the Operator to the address set forth in point II.A.2.a. 13. If there is any administrative document lacking for conducting Sistem BI-RTGS operational activities, the Operator will inform to the Participant candidate by mail, phone, or other means. 14. Based on the administrative documents submitted by the Participant candidate as set forth in number 10, the Operator will submit a letter informing matters related to the signing of Sistem BI-RTGS usage agreement, preparation of signature specimen of the Management and proxy official or officer of the Management, taking of administrator user and Digital Certificate, training time for Sistem BI-RTGS usage, and JKD installation time. 15. Based…
Unofficial Translation 15. Based on the letter set forth in number 14, Participant candidate will conduct the following: a. sign Sistem BI-RTGS usage agreement; b. take documents of administrator user, Connected User, Digital Certificate Hard Token, and/or Digital Certificate Soft Token by a Representative Official and has signature specimen in Bank Indonesia; c. involve an officer to handle RPP technical operation of Participant candidate in a technical training and operational usage of Sistem BI-RTGS; and d. conduct connection test of Participant candidate’s Sistem BI-RTGS with the Operator’s Sistem BI-RTGS by using the installed RPP. 16. Participant candidate must complete the documents set forth in number 10 and perform the provisions set forth in number 15 within 60 (sixty) business days at the maximum as from the principle approval of the Operator set forth in point 9.b. 17. In the event the Participant candidate fails to meet the requirements within the time limit as set forth in number 16: a. the principle approval as Participant issued by the Operator will not be valid; and b. the Participant candidate shall return the RPP application, Sistem BI-RTGS Operation Guideline Book, administrator user, Connected User, and Digital Certificate to the Operator to the address set forth in point…
Unofficial Translation point II.A.2.a within 7 (seven) business days at the maximum as from the approval invalidity. 18. The Operator will notify in writing of the participation operational approval as Participant and the operational effective date as the Participant to: a. such Participant candidate by mail; and b. all Participants through administrative message or other means, within 14 (fourteen) business days at the maximum after the Participant candidate perform the provisions set forth in number 16. D. Procedures and Requirements for Becoming USD/IDR PvP User The provisions and procedures of USD/IDR PvP use as follows:
Unofficial Translation b. for non-Bank institutions, obtain approval of the Participant’s activity supervisory institution to use USD/IDR PvP Mechanism. c. the Participant is an USD CHATS participant, either as a Direct Participant (DP) or Indirect CHATS User (ICU) set forth in the provision governing USD CHATS. 3. The procedures to become Participant using USD/IDR PvP are governed as follows: a. Participant lodges an application letter to the Operator to become an USD/IDR PvP user participant by submitting the following required documents:
Unofficial Translation supporting documents evidencing that the Participant is an USD CHATS participant; 4) submit information on: a) Society for Worldwide Interbank Financial Telecommunication (SWIFT) Bank Identifier Code (BIC) of a Participant; b) SWIFT BIC of: (1) settlement institution, for a DP; or (2) correspondent bank, for an ICU. b. The application letter set forth in letter a is signed by the Representative Official with a signature specimen in Bank Indonesia. The said letter submitted to the Operator under the following provisions:
Unofficial Translation 2) If the application set forth in letter a is approved, the Operator will submit to the Participant an approval letter to use USD/IDR PvP together with a notice of the Participant’s effective date as an USD/IDR PvP user. d. The written notice set forth in point c.2). is also submitted by the Operator to all Participants through administrative messages or other means determined by the Operator. E. Participation Status and Its Change
Unofficial Translation 3) may send or receive Fund Settlement instructions however thefund settlement process of the said instruction is deferred according to the limit set forth in number 2) and will be re-processed by Sistem BI-RTGS according to the procedure after the Participant status is active. c. Freeze Participants with freeze participation status:
Unofficial Translation d) suspended into freeze; or e) freeze into closed. 2) The participation status change set forth in number
Unofficial Translation competent authority, resignation as a Participant or any other reasons under the applicable laws and regulations and has been approved by the Operator or the relevant supervisory institution. 3) The participation status change at the Participant’s request set forth in point 2).c) is possible only from active into closed. 4) Requirements for participation status change into closed must comply with the following provisions: a) Participant shall settle all transaction conducted through BI-ETP System, BI-SSSS, Sistem BI-RTGS, and Bank Indonesia National Clearing System (SKNBI), which Fund Settlement is conducted through Sistem BIRTGS; b) Participant shall settle all obligations to Bank Indonesia, among others are Sistem BI-RTGS usage cost, Intraday Liquidity Facility (ILF) use cost, and other costs; and c) Participant shall transfer any balance in their Current Account to the account designated by the Participant to make the balance zero. 5) Particularly for participation status change into closed due to merger, consolidation, or spin off, fulfillment…
Unofficial Translation fulfillment of rights and obligations set forth in point 4).a) and 4).b) is assigned to the Participant resulting from the merger, consolidation, or spin off based on a statement letter of taking over of rights and obligations of the Participant resulting from the merger, consolidation, or spin off. 6) The Operator may transfer any balance in a Current Account in the name of Participant to an account designated by the Operator if the Participant does not make the balance transfer set forth in point 4).c). b. The procedures for participation status change are governed as follows:
Unofficial Translation (1) on Sistem BI-RTGS operational hours and notified on the same date as the status change; or (2) based on the effective date of status change determined by the Operator and notified at least 1 (one) business day in prior. d) The Operator will inform the status change to: (1) the relevant Participant by letter, which may be preceded with facsimile transmission; (2) all Participants through an administrative message or other means determined by the Operator; and/or (3) the competent institution in making supervision of the Participant’s activities by letter, which may be preceded with facsimile transmission. 2) Participation status change at the written request of the party competent in supervision of Participant’s activities a) The party competent in supervision of Participant’s activities may submit a written request to change participation status in Sistem BI-RTGS to Bank Indonesia Governor, the…
Unofficial Translation the copy of which is delivered to the Operator to the address set forth in point II.A.2.a. b) The request set forth in letter a) contains, among others, the following: (1) Participant’s name and the requested participation status change; (2) reasons for participation status change; and (3) effective date of participation status change. c) If the requested participation status change is into suspended status, the application set forth in letter a) will also contain suspension limits, including suspension of the entire or partial functions in conducting transaction activities through Sistem BI-RTGS. d) The application set forth in letter a) is accompanied with supporting documents as the basis for determining Participation status change. e) If the request set forth in letter a) is approved, the Operator will notify participation status change to: (1) the competent party requesting for the participation status change in Sistem BIRTGS…
Unofficial Translation RTGS by letter, which may be preceded with facsimile transmission; (2) the relevant Participant by letter, which may be preceded with facsimile transmission; and (3) all Participants through administrative message or other means. 3) Participation status change at the request of Participant due to self-liquidation, resignation as a participant or any other reason a) Participant lodges an application for participation status change from active into closed and Current Account closure to the Operator completed with the following supporting documents as the basis for the participation status change: (1) copy of business license revocation decision in the event the Participant enters into a self-liquidation; or (2) any other relevant document for participation status change due to resignation or for any other reason approved by the Operator or the party supervising the Participant’s activities. b) The…
Unofficial Translation b) The application set forth in letter a) is signed by a Management with a signature specimen in Bank Indonesia and submitted to the Operator under the following provisions: (1) the letter is submitted to the Operator to the address set forth in point II.A.2.a; and (2) for Participant domiciled within the operational area of KPwDN, the request letter is submitted to the Operator and the copy thereof is delivered to the relevant KPwDN. c) Participant shall fulfill the provisions to settle their obligation and make their account balance zero as set forth in point a.4). d) Based on the request set forth in letter a) which has been approved by the Operator, the Operator will notify the status change participation closure in Sistem BI-RTGS to: (1) such Participant by letter, which may be preceded by facsimile transmission on the participation status change and other matters conducted pertaining to the participation status change and account closing; (2) all…
Unofficial Translation (2) all Participants through administrative message or other means determined by the Operator; and (3) the party competent in supervision of Participant’s activities by letter, which may be preceded by facsimile transmission. e) Participant must return the Digital Certificate Hard Token to the Operator after their participation is closed. 4) Participation Status Change at the Participant’s Request Due to Merger, Consolidation, or Spin Off a) Participation Status Change Due to Merger The procedures for participation status change due to merger are as follows: (1) Merging Participant will apply an application letter of participation closure and Current Account closing, which must at least contain the following: (a) merger approval from the competent institution; (b) operational merger implementation time in Sistem BI-RTGS; (c) Current Account balance overbooking implementation time of the merging Participant at least 1 (one) business day…
Unofficial Translation day prior to the operational merger implementation in Sistem BI-RTGS; (d) request for closing of Sistem BI-RTGS participation and Current Account; (e) transfer of rights and obligations related to participation in Sistem BIRTGS of the merging Participant to the Participant receiving such merger, as from the legal merger date; and (f) revocation of signature specimen of the Representative Official of the merging Participant, as from the legal merger date. Example format of request letter for participation and Current Account closing to the Operator is as set forth in example II.14 in Appendix II. (2) The letter set forth in point (1) is accompanied with the following document requirements: (a) copy of decision letter from the competent institution approving the merger; and (b) copy…
Unofficial Translation (b) copy of the latest Articles of Association of the merging Participant, which have been legalized by the competent official or authenticated by the Management. (3) Participant receiving the merger will submit a merger request letter, which must at least contain the following: (a) merger approval of the competent institution; (b) information on Participant receiving the merger and the merging Participant; (c) implementation time: i. operational transition in the implementation of Sistem BIRTGS of the merging Participant to the Participant receiving the merger; ii. Current Account balance overbooking of the merging Participant to the Current Account of the Participant receiving the merger; iii. Current…
Unofficial Translation iii. Current Account closing of the merging Participant; and iv. cessation of participation in Sistem BI-RTGS from the merging Participant; (d) takeover of the rights and obligations of the merging Participant by the Participant receiving the merger as from the legal merger date; and (e) information on merger announcement on national newspaper, by using the format set forth in example II.15 in Appendix II. (4) The notice letter set forth in number (3) is accompanied by the following documents: (a) statement which at least contains the following: i. takeover of the rights and obligations of the merging Participant as from the legal merger date; ii. enforcement of signature specimen for the Participant receiving the merger and confirmation of the signature specimen…
Unofficial Translation specimen of the merging Participant; and iii. takeover of operational authority and responsibilities of the merging Participant as from the legal merger date until the operational merger date, by using the format set forth in example II.16 in Appendix II. (b) copy of the following documents legalized by the competent official or authenticated by the Management: i. deed of merger; ii. deed of amendment to Articles of Association of the Participant receiving the merger; iii. merger permit from the institution competent granting merger approval; and iv. approval for amendment to Articles of Association from the Ministry of Law and Human Rights or registration of Deed of Merger and Deed Amendment to Articles…
Unofficial Translation Articles of Association in the List of Companies. (5) The letter set forth in number (1), (3), and (4).(a) is signed by the Management having signature specimen in Bank Indonesia and submitted to the Operator under the following conditions: (a) the letter is submitted to the Operator to the address set forth in point II.A.2.a; and (b) for Participant domiciled within the operational area of KPwDN, the application letter set forth in number (1) and (3) is submitted and the copy thereof is delivered to the relevant KPwDN. (6) The Operator will notify to the Participant receiving the merger by letter on the approved operational merger time in Sistem BI-RTGS and matters, which must be conducted by the relevant Participant upon complete receipt of the documents set forth in number (1), (2), (3), and (4). (7) The Operator will notify to all Participants by administrative message or other means on…
Unofficial Translation on the approved operational merger implementation in Sistem BI-RTGS and closing of participation in Sistem BI-RTGS of the merging Participant. (8) Merging Participant will overbook its Current Account balance through their RPP to the Current Account of the Participant receiving the merger according to the operational merger implementation in Sistem BI-RTGS approved by the Operator. (9) The status of Sistem BI-RTGS participation of merging Participant will effectively change into closed on the operational merger implementation date of Sistem BI-RTGS after the Participant’s Current Account balance becomes zero. (10) Merging Participant shall return the Digital Certificate Hard Token to the Operator after the Participant’s participation is closed. (11) The Operator will inform the closing of Sistem BI-RTGS participation of a merging Participant to all Participants by administrative message or other means. b) Participation…
Unofficial Translation b) Participation Status Change due to Consolidation The procedures for participation status change due to consolidation are as follows: (1) Consolidated Participant candidate shall lodge the following request: (a) Current Account opening by following Bank Indonesia regulation on current account in Bank Indonesia; and (b) become a Sistem BI-RTGS Participant by following the participation general principles set forth in letter A, requirements for becoming participant set forth in letter B, and procedures for becoming participant set forth in letter C. (2) Consolidated Participant candidate will submit a consolidation notice, which at least contains the following: (a) consolidation approval of the competent institution; (b) information on new consolidated Participant and consolidating Participants; (c) implementation time: i. operational…
Unofficial Translation i. operational transition in Sistem BI-RTGS implementation of consolidating Participants to newconsolidated Participant; ii. Current Account balance overbooking of consolidating Participants at least 1 (one) business day prior to the operational consolidation implementation in Sistem BIRTGS; iii. Current Account closing of consolidating Participants; and iv. cessation of participation in Sistem BI-RTGS of consolidating Participants; (d) takeover of the rights and obligations of consolidating Participants by consolidated Participant as from the legal consolidation date; and (e) information on consolidation announcement on a national newspaper, by using the format set forth in example II.15 in Appendix II. (3) The…
Unofficial Translation (3) The notice set forth in number (2) is completed with the following required documents: (a) a statement containing at least the following: i. takeover of the rights and obligations of consolidating Participants as from the legal consolidation date; ii. enforcement of signature specimen of new consolidated Participant and confirmation of the signature specimen status of consolidating Participants; and iii. takeover of operational authority and responsibilities of consolidating Participants as from the legal consolidation date until the operational consolidation implementation date, by using the format set forth in example II.16 in Appendix II. (b) copy…
Unofficial Translation (b) copy of the following documents certified by the competent official or authenticated by the Management: i. deed of consolidation; ii. deed of Articles of Association of new consolidated Participant; iii. consolidation permit from the institution competent in granting consolidation approvals; and iv. company legal approval of the Ministry of Law and Human Rights for the deed of establishment of new consolidated Participant. (4) Consolidating Participants must lodge a request letter for closing of participation and Current Account, which at least contains the following: (a) consolidation approval of the competent institution; (b) operational consolidation implementation time in Sistem BIRTGS; (c) implementation time of the Current Account balance overbooking of consolidating…
Unofficial Translation consolidating Participant 1 (one) business day prior to operational consolidation implementation time in Sistem BI-RTGS; (d) request for closing of Sistem BI-RTGS participation and Current Account; (e) assignment and delegation of Sistem BI-RTGS participation of consolidating Participants to new consolidated Participant as from the legal consolidated date; and (f) revocation of signature specimen of a Representative Official of consolidating Participants as from the legal consolidation date. Example format of the request letter for closing of participation and Current Account to the Operator is as set forth in example II.14 in Appendix II. (5) The letter set forth in number (4) is completed with the following required documents: (a) copy of decision of the institution competent in consolidation approval; and (b) copy…
Unofficial Translation (b) copy of the latest Articles of Association of consolidating Participants, which have been certified by the competent official or authenticated by the Management. (6) The letter set forth in number (2), (3).(a), and (4) is signed by the Management and submitted to the Operator under the following conditions: (a) the letter is submitted to the Operator to the address set forth in point II.A.2.a; and (b) for Participant domiciled within the operational area of KPwDN, the request letter set forth in number (2) and (4) is submitted and the copy thereof is delivered to the relevant KPwDN. (7) The Operator will notify to consolidating Participants by letter on the approved operational consolidation implementation time in Sistem BI-RTGS and matters to be conducted by the relevant Participants, after…
Unofficial Translation after complete receipt of the documents set forth in number (3), (4), and (5). (8) The Operator will notify to all Participants by administrative message or other means on the approved operational consolidation implementation of Sistem BI-RTGS and participation closing of Sistem BI-RTGS of consolidating Participants. (9) Consolidating Participants will overbook their Current Account balance through their RPP to the Current Account of new consolidated Participant at least 1 (one) business day prior to the operational consolidation implementation of Sistem BI-RTGS approved by the Operator. (10) The status of Sistem BI-RTGS participation of consolidating Participants will effectively change into closed on the operational consolidation implementation date of Sistem BI-RTGS after the Participants’ Current Account balance becomes zero. (11) Consolidating Participants shall return the Digital Certificate Hard Token to the Operator…
Unofficial Translation Operator after the Participants’ participation are closed. (12) The Operator will inform the closing of Sistem BI-RTGS participation of consolidating Participants to all Participants by administrative message or other means. c) Participation Status Change due to Spin Off The procedures for participation change due to spin off are as follows: (1) Participation change due to spin off is made if any UUS Participant executes spin off from Participant which is a conventional bank as its parent by establishing a new Sharia Commercial Bank (BUS) or assigning and delegating the rights and obligations of the UUS to an existing BUS. (2) The procedures for participation change due to spin off by establishing a new BUS follows the participation status change procedure due to merger set forth in letter b). (3) The procedures for participation change due to spin off by assigning and delegating the…
Unofficial Translation the rights and obligations of UUS to an existing BUS by the merger procedures set forth in letter a). F. Participation Data Change Scope of participation data change includes:
Unofficial Translation c) in the event the Participant uses infrastructure managed by another party, then in addition to attaching documents set forth in letter a) and b), Participant shall also complete documents set forth in point C.4.d. 2) The application letter set forth in number 1) is signed by the Representative Official with signature specimen at the Operator and submitted to the Operator under the following provisions: a) the letter is submitted to the address set forth in point II.A.2.a; and b) for Participant domiciled within the operational area of KPwDN, the application is submitted and the copy is delivered to the relevant KPwDN. 3) The Operator may check the location of infrastructure used by the Participant. 4) The Operator submits a written response by letter, which may be preceded by facsimile transmission to the relevant Participant on: a) rejection of Participant’s change in infrastructure usage and the rejection reasons; or b) approval…
Unofficial Translation b) approval for Participant’s change in infrastructure usage and the effective date of Participant’s change in infrastructure usage. 2. Participant Code Change Participant code change may occur because, among others, Participant who is not a SWIFT member changes into a SWIFT member or because of Participant’s BIC SWIFT change. The procedures for participant code change are as follows: a. Participant lodges a request letter to the Operator for participant code change by attaching the following documents:
Unofficial Translation Participant, no later than 14 (fourteen) business days as from received by the Operator of the request letter set forth in letter a containing:
Unofficial Translation f. The Operator gives a new Connected User and Digital Certificate to the Participant by letter or other means specified by the Operator. g. The Operator informs the effective date of participant code change to:
Unofficial Translation a) deed of amendment to Articles of Association for Indonesian Legal Entity; b) approval letter of amendment to Articles of Association from the competent institution; and c) decision letter of the competent institution on the name change if the Participant is a Bank. Primarily, Banks headquartered overseas may submit only the decision set forth in letter c). b. The notice letter set forth in letter a is signed by the Representative Official with a signature specimen at the Operator and submitted to the Operator under the following provisions:
Unofficial Translation d. The Operator will inform the participation data change related to Participant’s name change to all Participants through administrative message or other means. 4. Participant Data Change Due to Business Activity Change Participation data change related to Participant’s business activity change from a conventional commercial bank into sharia commercial bank may result in Participant’s data change; among others are Participant’s name, business activity, account number, and/or participant code. The procedures for Participant’s data change due to their business activity change are as follows: a. Participant submits a notice letter in the format set forth in example II.17 in Appendix II. b. The notice set forth in letter a is completed with copy of the following documents legalized by the competent official or authenticated by the Management with a signature specimen at the Operator:
Unofficial Translation c. The notice letter set forth in letter a is signed by the Representative Official with a signature specimen at the Operator and submitted to the Operator under the following provisions:
Unofficial Translation b. In the event of such change set forth in letter a, the Operator will inform the Current Account number change and effective date of such Current Account number change to:
Unofficial Translation
Unofficial Translation
Unofficial Translation
Unofficial Translation sworn translator, for Bank’s branch office which headquarter is located overseas; and d) copy of latest organization structure for bank’s branch office which headquarter is located overseas; and 4) if Management authority and/or position changes, a notice letter is accompanied by a statement letter of prevailing Management signature specimen in the format set forth in example II.19 in Appendix II. c. The notice letter set forth in letter a is signed by the Representative Official with signature specimen in Bank Indonesia and submitted to the Operator under the following provisions:
Unofficial Translation e. The signature specimen set forth in letter d will be valid as from the notice letter from the Operator on the effective date of signature specimen or 5 (five) business days at the maximum as from the signature specimen preparation. f. The signature specimen of Management whose authority has been revoked related to the participation in Sistem BI-RTGS is declared invalid as from the date of notice letter of Management authority change completely received by the Operator. g. in the event the Participant fails to notify the Management data change to the Operator , the data administered with the Operator will be deemed to remain valid and all legal actions taken by the Management will become the full responsibility of the Participant. 9. Porwer Change Power change is made for addition, replacement, and/or revocation of power from the Representative Official and/or officer. Provisions and procedures for power change are as follows: a. In the event of addition to and/or replacement of power of the Representative Official and/or officer, Participant will take the following measures:
Unofficial Translation Official and/or officer and signature specimen preparation request in the format set forth in example II.20 in Appendix II; 2) provisions, requirements, and procedures for power granting refer to point III.C.10.b, III.C.10.c, and III.C.10.d; and 3) the power addition will be valid within 5 (five) business days at the maximum as from the documents set forth in number 1) and signature specimen are completely received by Bank Indonesia . b. Revocation of Entire or Partial Power to Proxy Official and/or Proxy Officer Provisions and procedures for revocation of entire or partial power to Proxy Official and/or proxy officer are as follows:
Unofficial Translation Provisions and procedures for change of authority in a power of attorney granted to Proxy Official and/or officer are as follows:
Unofficial Translation Indonesia, Participant must submit a signature difference statement letter set forth in example II.22 in Appendix II. G. User Management
Unofficial Translation 4) determination of role and limit for Unconnected User; and 5) database management and parameter configuration. b. Connected User management among others include:
Unofficial Translation H. Use of Connected User and Digital Certificate Provisions and procedures for use of Connected User and Digital Certificate by Participants in Sistem BI-RTGS operation are as follows:
Unofficial Translation lost/broken or may not be used for any reasons whatsoever. g. Addition of Connected User completed with password and Digital Certificate Hard Token set forth in letter e and/or replacement of Digital Certificate Hard Token, which is lost/broken for any reasons whatsoever as set forth in letter f will be charged. 2. Procedures for Addition of Connected User Completed with Password and Digital Certificate and Replacement and/or Extension of Digital Certificate Active Period. Procedures for addition of Connected User completed with password and Digital Certificate as well as replacement and/or extension of Digital Certificate active period are as follows: a. Participant submits request letter to the Operator for addition of Connected User completed with password and Digital Certificate as well as replacement and/or extension of Digital Certificate active period, which at least contains the following information:
Unofficial Translation c) reasons for requesting the addition of Connected User if the request exceeds the number set forth in point 1.e. 2) for replacement of Digital Certificate Hard Token: a) Participant’s name and code; b) name of Connected User whose Digital Certificate Hard Token will be replaced; c) serial number of Digital Certificate Hard Token; and d) reasons for requesting the replacement of Digital Certificate Hard Token. 3) for extension of Digital Certificate Hard Token active period: a) Participant’s name and code; b) name of Connected User whose Digital Certificate Hard Token active period will be extended; and c) serial number of Digital Certificate Hard Token. 4) for extension of Digital Certificate Soft Token active period: a) Participant’s name and code; b) name of Connected User of Server whose Digital Certificate Soft Token active period will be extended. Request…
Unofficial Translation Request letter for addition of Connected User completed with password and Digital Certificate, replacement and/or extension of Digital Certificate active period uses the format set forth in example II.23 in Appendix II. b. The request letter set forth in letter a is signed by a Representative Official and submitted to the Operator under the following provisions:
Unofficial Translation 2) Digital Certificate Hard Token in the event the Participant lodges to extend the active period of or replace Digital Certificate Hard Token; and/or 3) Digital Certificate Hard Token loss report from the police in the event the Participant lodges to replace the lost Digital Certificate Hard Token. d. The Operator will notify the Participant by administrative message or other means for certificate signing no later than 14 (fourteen) business days as from the documents set forth in point a.4) are completely received by the Operator. e. Participant will take the Connected User, password, and/or Digital Certificate under the following mechanism:
Unofficial Translation Official, who has signature specimen in Bank Indonesia. f. In the event of extension of Digital Certificate Soft Token active period, Participant must notify to the Operator the effective date of new Digital Certificate Soft Token use by administrative message or letter, which may be preceded by facsimile transmission. If the Participant fails to notify the effective date, any and all risks arising therefrom will become the full responsibility of such Participant. g. in the event the Participant lodges a request for addition of Connected User completed with password and Digital Certificate Hard Token exceeding the number set forth in point 5.a, approval for or rejection of the request will be submitted in writing by the Operator to the Participant no later than 14 (fourteen) business days as from the request letter is completely received by the Operator. h. The Operator charges the cost to Participant’s Current Account denominated in Rupiah administered in Bank Indonesia for addition of Connected User completed with password and Digital Certificate Hard Token exceeding the number set forth in point 5.a. and/or Digital Certificate Hard Token replacement. 3. Deletion of RPG and/or RSTPG Connected User a. Deletion…
Unofficial Translation a. Deletion of RPG and/or RSTPG Connected User may be made on the Operator’s initiative or at the Participant’s request. b. Deletion of RPG and/or RSTPG Connected User by the Operator is made, among others, if the participation of Participant in Sistem BI-RTGS is ceased. c. Procedures for deletion of RPG and/or RSTPG Connected User at the Participant’s request set forth in letter a are as follows:
Unofficial Translation Participant may lodge a request for resetting Connected User password for RPG, unlocking Connected User for RPG, and/or resetting Digital Certificate Hard Token password under the following procedures: a. Request for Resetting Connected User Password for RPG
Unofficial Translation 5) The letter set forth in number 4) is taken by a Representative Official, who has a signature specimen in Bank Indonesia. b. Request for Unlocking Connected User for RPG
Unofficial Translation c. Request for Resetting Digital Certificate Hard Token Password
Unofficial Translation the stage of resolution process as determined by the Operator. I. Participant’s Obligation For operation of Fund Settlement through Sistem BI-RTGS, Participant must:
Unofficial Translation those determined by a payment system association on Sistem BI-RTGS operation. 4) KPT must contain at least the following materials: a) introduction; b) BI-RTGS operational organization; c) provisions and operational procedures for Sistem BI-RTGS; d) operational supervision of Sistem BI-RTGS; e) management of Unforeseeable Conditions and/or Emergency Condition; and f) customer protection. Minimum scope details of KPT materials are specified in “Guideline for Preparation of Written Policy and Procedure” as set forth in Appendix V. 5) In the event of material changes set forth in point 4).b) until 4).e). and/or changes in provisions issued by the Operator and/or payment system association, affecting KPT materials, Participants must update the KPT. 6) The KPT update set forth in number 5) must be conducted within 6 (six) months at the maximum as from the material and provision changes. b. Make internal inspection to guarantee the security of Sistem BI-RTGS operation. Provisions…
Unofficial Translation Provisions for internal inspection to guarantee the security of Sistem BI-RTGS operation are as follows:
Unofficial Translation 4) Security audit includes at least the scope set forth in Appendix VI. d. Prepare information technology policy on Sistem BIRTGS, which is regularly reviewed and updated. e. Have guideline for Disaster Recovery Plan (DRP) and Business Continuity Plan (BCP) under the following provisions:
Unofficial Translation 3) The BCP guideline set forth in number 1) must at least contain the following: a) working unit as the unit in charge; b) coordination mechanism if there are several units in charge; c) business measures taken to guarantee Sistem BI-RTGS operational activities; d) BCP procedure test mechanism; e) reporting and monitoring mechanism; and f) operational officer (including phone number data easy to reach at any time). f. Use RPP application according to Sistem BI-RTGS Operation Guideline Book. g. Do data maintenance under the following provisions:
Unofficial Translation 4) ensure the data set forth in number 1) and the back-up set forth in number 3) is not broken among others by conducting regular maintenance or checking; and 5) store all data set forth in number 1) and the backup set forth in number 3), according to the internally applicable filing provisions for the Participant and retention period under the laws and regulations on corporate documents. h. Guarantee main RPP and back-up RPP properly function to conduct various Sistem BI-RTGS activities during Sistem BI-RTGS operational hours. To guarantee proper function of main RPP and back-up RPP, the following provisions apply:
Unofficial Translation b) transactions are hierarchically made according to officer authority level; c) management of substitute officers for users according to their respective roles; d) determine and administer users holding Digital Certificate Hard Token and Digital Certificate Soft Token, including the token serial number; e) ensure the security of Digital Certificate Hard Token used by users determined by the Participant; and f) store security documents related to administrator user, Connected User, Digital Certificate Hard Token, and Digital Certificate Soft Token. 3) Provide and manage back-up system for Participant’s Sistem BI-RTGS of under the following arrangement: a) Participant must provide back-up server and JKD of their back-up site to Bank Indonesia according to the standard determined by the Operator. b) The cost of infrastructure provision and use set forth in letter a) will be borne by Participants. c) Selection…
Unofficial Translation c) Selection of RPP type and location and back-up JKD set forth in letter a) is made by Participant by considering among others: (1) Participant’s transaction volume and Sistem BI-RTGS urgency level for Participant; and (2) internal control to mitigate operational risks of Participant. 4) Guarantee proper function of back-up system among others by: a) Participant must participate in Sistem BI-RTGS trial conducted by the Operator by using their back-up system at least annually. b) Conduct periodic connection trial of back-up system under the following provisions: (1) Back-up system connection trial includes trial of back-up RPP, back-up JKD, and/or data. (2) The back-up system connection trial set forth in number (1) may be conducted by using: (a) environment testing of the Operator during Sistem BI-RTGS operational hours; or (b) production…
Unofficial Translation (b) production environment of the Operator by following the Operator’s schedule, namely on Fridays on the first and third weeks after the end of day process of the Operator’s Sistem BI-RTGS ends and the operation is within 1 (one) hour at the maximum. (3) Back-up system connection trial is conducted by the following mechanism: (a) Participant lodges RPP connection trial request by administrative message to the Operator at least 1 (one) business day prior to the operation of back-up system connection trial. (b) The Operator will notify back-up system connection trial approval to Participants by administrative message. (c) Participant submit the report of backup system connection trial result to the Operator at least 1 (one) business day after the trial completes by administrative message, facsimile, or other…
Unofficial Translation other means determined by the Operator. c) Operate back-up system for operational activities in normal condition under the following provisions: (1) Operational activities in normal condition are conducted periodically, at least annually. (2) Back-up system operation for operational activities in normal condition may include operation of back-up RPP and/or back-up JKD. (3) Back-up system use procedures for operational activities in normal condition are as follows: (a) Participant lodges a request by administrative message to the Operator at least 1 (one) business day before using back-up system for operational activities in normal condition; (b) The Operator will notify the Participant of approval for back-up RPP and/or back-up JKD use by administrative message. 5) Guarantee…
Unofficial Translation 5) Guarantee security and reliability of JKD used to connect the main RPP and/or back-up RPP with: a) Participant’s computer used for Sistem BIRTGS operation; and b) Participant’s internal computerization system, if the Participant connects the main RPP and/or back-up RPP with Participant’s internal computerization system, therefore, it will be free from all possible Sistem BIRTGS damaging sources, including but not limited to possible fraud, hacking, and system damage by flooding the system with payment data and messages. 6) Report internal application development related to Sistem BI-RTGS to the Operator. 7) Take necessary preventive measures to allow proper function of hardware and software used in Sistem BI-RTGS and/or its relation to Sistem BI-RTGS free from any kinds of virus. 8) Guarantee the integrity of Sistem BI-RTGS database in the main RPP and back-up RPP, including backup data stored on CD, tape, cartridge, flash disk, and any other media. 9) Conduct installation anytime changes are made to the application of the main RPP and/or back-up RPP…
Unofficial Translation RPP according to Sistem BI-RTGS Operation Guideline Book. 10) Appropriately store RPP application, including any changes in the RPP application provided by the Operator, in a place safe and free from any sources potentially damaging RPP application. 11) Extend the active period of Digital Certificate according to the time determined by the Operator. 2. Responsible for the correctness of Fund Settlement instruction and all information sent by Participant to the Operator through Sistem BI-RTGS. To ensure the correctness of Fund Settlement instruction and all information sent by Participant to the Operator, Participant must take the following steps: a. make Fund Settlement instruction according to Sistem BI-RTGS Operation Guideline Book and message completion standardization for Fund Transfers through Sistem BI-RTGS as set forth in Appendix VII; b. send Fund Settlement instruction according to the schedule determined by the Operator; and c. use transaction codes as determined by the Operator. 3. Comply with all provisions determined by the Operator, provisions of payment system association, and other provisions for operation of real-time Fund Settlement through Sistem BI-RTGS. To…
Unofficial Translation To comply with the provisions determined by the Operator, the provisions of payment system association and other provisions related to the operation of real-time Fund Settlement through Sistem BI-RTGS, the Management and/or officials competent in conducting operational tasks and monitoring compliance with Participant’s provisions and procedures must take necessary measures to ensure their compliance with Bank Indonesia regulations on operation of Fund Settlement through Sistem BI-RTGS, ILF, and Fund Transfers through Sistem BI-RTGS to protect participant’s customers. 4. Perform Sistem BI-RTGS usage agreement between the Operator and Participant. 5. Inform Fund Transfer fees and customer service hours for Fund Transfers through BI-RTGS in a transparent manner. For transparency of transaction fees through Sistem BI-RTGS to customers, Participants will announce in writing the transaction fees through Sistem BI-RTGS in places easily accessible by customers. 6. Give data and information on Sistem BI-RTGS operation to Bank Indonesia. To give data and information on Sistem BI-RTGS operation to Bank Indonesia, Participant will give data and information requested by the Operator, including but not limited to, original…
Unofficial Translation original and/or copies of documents in the form of notes, and/or electronic data related to Fund Transfer operation. IV. OPERATIONAL TIME OF FUND SETTLEMENT IMPLEMENTATION A. General Principles
Unofficial Translation 7. In certain conditions, Unforeseeable Conditions, and/or Emergency Condition, any Participant may opt not to participate in Sistem BI-RTGS operational activities on the operational days set forth in number 2 with the approval of the Operator. B. Determination of Fund Settlement Operational Time
Unofficial Translation d. Bank Indonesia’s interest to maintain smooth payment system; and/or e. request for time period extension from Participant. 2. Primarily for cash withdrawals, tax delegation, and PvP transaction, in the event of operational hour extension, the change of time period of the three transaction types may be excluded.. 3. In the event of Fund Settlement operational time change as set forth in number 1, the Operator will notify such change to all Participants by administrative message and/or other means. 4. In the event of operational time change in the current year, for any transaction sent by Participant to the Operator on the previous business day by using the exchange date on operational day determined as holiday, the following provisions will apply: a. All transactions sent by using the exchange date determined as Sistem BI-RTGS operational holiday will be void. b. in the event the Participant will complete the transaction set forth in letter a through Sistem BI-RTGS on the following business day, the Participant must send new Fund Settlement instruction. 5. Time Period Change at the Participant’s Request a. Any…
Unofficial Translation a. Any Participant may lodge a request for time period extension if they experience Unforeseeable Conditions and/or Emergency Condition resulting in the necessity for extension of Fund Settlement time for transactions conducted through Sistem BI-RTGS. b. The request for time period extension set forth in letter a is submitted by the Participant to the Operator under the following provisions:
Unofficial Translation
Unofficial Translation 7) Time period extension at Participant’s request will be charged at amount as set forth in Appendix X. 6. The procedures for Participant’s request not to conduct Fund Settlement for Fund Transfers conducted through Sistem BIRTGS in certain conditions set forth in point A.4 are as follows: a. The Participant lodges a request letter to the Operator not to conduct Fund Settlement operational activities, which may be preceded with facsimile, administrative message, and/or other means. b. The letter set forth in letter a is signed by a Representative Official, who has signature specimen in Bank Indonesia, and then delivered to the address set forth in point II.A.2.a. c. The request set forth in letter a is made among others for the following reasons:
Unofficial Translation e. If the request is approved, the Operator will be announced to all Participants by administrative message regarding the Participant which is not conducting operational activities of Sistem BI-RTGS set forth in letter a. f. Any Participant not conducting operational activities oblige to settle the Fund Settlement result for the customer’s interest by referring to the provisions on customer protection in fund transfer through Sistem BIRTGS. V. FUND TRANSFER THROUGH SISTEM BI-RTGS A. Fund Transfer Service
Unofficial Translation forwarded to accounts of customers within 1 (one) receiving Participant. c. Single Debit Fund Transfer made by Bank Indonesia consisting of 1 (one) Fund Settlement instruction to debit Participant’s Fund Settlement Account, either for the interest of Bank Indonesia or for the interest of the fund beneficiary as specified in the Fund Settlement instruction. 2. Any Participant other than Bank Indonesia may only use fund transfer services in the form of single credit set forth in point 1.a and multiple credit set forth in point 1.b. 3. The Fund Transfers set forth in number 1 consist of: a. Fund Transfer from one Participant to another (transaction between Participants) including:
Unofficial Translation
Unofficial Translation 3) interbank transactions for securities sales/purchase which Settlement are made by Delivery versus Payment (DvP) mechanism through BI-SSSS; 4) settlement transactions ofmultilateral net positions as result of the calculation in SKNBI; and 5) transactions with Bank Indonesia for cash activities, among others are cash withdrawals of Current Accounts, cash deposits of Current Accounts, and other cash related transactions. b. Fund Transfer from Participant to another Participant (inter-Participants transaction) for the interest of the Participant’s customer in the nominal amount above the fund transfer nominal limit through SKNBI. 5. Types of Fund Transfers, which may be made by the Participant other than Bank Indonesia, are specified under an agreement between the Operator and Participant. 6. Nominal limit of Fund Transfers, which may be conducted through Sistem BI-RTGS, is specified in Bank Indonesia regulations on fund transfer nominal limit inter-Banks for the interest of customers through Sistem BI-RTGS. 7. Cash withdrawals, transactions for TSA operation, multicurrency transactions, and PvP transactions through Sistem BI-RTGS are specified as follows: a. Cash withdrawal transaction
Unofficial Translation
Unofficial Translation Official or officer authorized to make such physical money withdrawals under the following provisions: a) KPBI (1) The Representative Official and officer must have a power of attorney to make physical money withdrawals at KPBI under the provision specified in point III.C.10.c; (2) the officer set forth in number 1) has been registered with KPBI administration; and (3) the procedure for physical money withdrawals by the officer set forth in number (2) must be performed under the provisions of cash service system operation . b) KPwDN Physical money withdrawals are made by a Representative Official or officer with a power of attorney at KPwDN under the provisions of cash service system operation. 7) Physical money withdrawals made by submitting an appointment letter for physical money withdrawals signed by a Representative Official, who has signature specimen in Bank Indonesia, namely at KPBI or working unit responsible for customer service…
Unofficial Translation service at KPwDN. The format of such appointment letter is specified in example II.25 in Appendix II. 8) In particular conditions, cash withdrawal transaction set forth in number 1) may be made after the payment cash transaction time limit with the approval of Bank Indonesia by considering public interest. 9) The cash withdrawals set forth in number 8) are made under the following procedures: a) Participant lodges a cash withdrawal request with the reasons. b) The request set forth in letter a) is signed by a Representative Official, who has signature specimen in Bank Indonesia and submitted to Bank Indonesia c.q. DPU or KPwDN according to their respective operational area. c) Instrument to conduct withdrawals is BI Cheque, which filling and usage procedures are specified in regulations on current account in Bank Indonesia, and stamped Contingency Plan on BI Cheque sheets. d) Cash withdrawals may be made after Participants meet the provisions set forth in letter a) to letter c) and have obtained the approval of Bank Indonesia:
Unofficial Translation (1) DPU for Participants for cash withdrawals at KPBI; or (2) KPwDN for Participants for cash withdrawals at KPwDN according to their respective operational areas. b. Transactions for TSA Implementation
Unofficial Translation customers for TSA set forth in point 1.c in Appendix X. 5) Any Participant, who send Fund Settlement instruction for TSA operation by using transaction codes other than as set forth in Appendix IX, will be charged with single credit transaction cost set forth in point 1.a in Appendix X. 6) If any Participant sending Fund Settlement instruction for TSA transaction fails to meet the provisions set forth in number 2) and 3), the Participant will be charged with inter-Participant single credit transaction cost for customers set forth in point 1.a in Appendix X and administrative sanction in the form of payment obligation for misusing transaction code. 7) The time limit of Fund Settlement for transaction set forth in number 2).a) refers to the activity time period set forth in Appendix IX. 8) If the Participant conducts an error in filling fund amount and/or duplicating transaction in sending Fund Settlement instruction to the government institution’s account in Bank Indonesia related to other TSA transactions, such transaction will be settled in a bilateral manner between the sending Participant and owner of Sub-RKUN KPPN account or…
Unofficial Translation or owner of another government institution account as fund beneficiary. c. Multicurrency transaction
Unofficial Translation (2) Inter-Participant SBN transaction in Secondary Market in United States Dollar through BI-SSSS. b) Transaction in other foreign currency determined by the Operator. d. PvP Transaction
Unofficial Translation 6) For Fund Settlement operation, the following will be made: a) Sistem BI-RTGS and USD CHATS conduct matching process between Fund Settlement instruction set forth in number 4 and fund settlement instruction set forth in number 5. b) If Fund Settlement instruction in Sistem BIRTGS matching to the fund settlement e in USD CHATS: (1) Balance in Fund Settlement account of any buying Participant will be held in the amount of PvP transaction nominal; and (2) Fund Settlement will be conducted for PvP transaction in the event the holding fund for United States Dollar in USD CHATS is successful; or (3) PvP transaction will be put in Queueing System in the event the Fund Settlement Account balance is insufficient. c) If the same data between Fund Settlement instruction in Sistem BI-RTGS and fund settlement instruction in USD CHATS is not found, PvP transaction status becomes pending. B. Preparation…
Unofficial Translation B. Preparation and Delivery of Fund Settlement Instruction Delivery of Fund Settlement instruction through Sistem BI-RTGS is specified as follows:
Unofficial Translation c. Fund Settlement for Fund Settlement instruction sets forth in letter b is conducted on Fund Settlement value date according to the Fund Settlement transaction time period for future date transaction. C. Fund Settlement
Unofficial Translation b. Fund Settlement is made by considering the following factors:
Unofficial Translation subaccount for PvP transaction is Rp 20,000.00. The written total balance is Rp 100,000.00, but the effective balance which may be used for transactions is Rp 80,000.00. 2) Subaccount balance is used to conduct Fund Settlement for transactions set forth in point 1.c by using the fund reserved by Participant in the subaccount. 3. Fund Settlement Mechanism a. Fund Settlement for Fund Transfers through Sistem BIRTGS is made on transaction-by-transaction basis in real-time. b. Fund Settlement set forth in letter a is conducted under the following mechanism:
Unofficial Translation a) there are counterparty (opposing) Fund Transfers in queue; and b) simulation of the offsetting results in the simulated balance able to cover Fund Settlement of Fund Transfers in queue. 4. Transaction Priority, Queueing System, and Queue Management a. Transaction Priority The Operator determines priority groups including priority numbers in each group consisting of:
Unofficial Translation b) Priority group consists of priority numbers from 11 to 50 with the standard (default) number of 30. 3) Normal Group a) Transactions included in normal group among others are transactions of customer inter-bank and inter-Participant. b) Normal group consists of figures from 51 to 98 with the standard (default) number of 70. 4) Settle or Reject Group a) Transactions of priority group with only option of settle-or-reject will be immediately rejected by RCN without put in queue if fund on debited Participant’s Fund Settlement Account is insufficient. b) Settle or reject group uses priority number of 99. b. Queueing System
Unofficial Translation b) Value of Fund Transfer exceeds fund reserved in the subaccount of fund reserved as set forth in point 1.c. 2) Settlement of Fund Transfers in queue is specified as follows: a) Settlement of Fund Transfers in queue of high priority and priority group is conducted by First In First Out (FIFO) principle. b) Settlement of Fund Transfers in queue of normal group is conducted by First Available First Out (FAFO) principle. c) Fund Transfers in queue of normal group shall not be conducted if transactions in queue of high priority or priority group is still in the Queue System. d) A Fund Transfer in the Queue System will be automatically canceled by RCN based on the cut off time of transaction type code for such Fund Transfer in queue and/or in the beginning of cut-off warning of Sistem BIRTGS. c. Management of Transactions in Queue Participant may manage Fund Transfers in the Queue System by applying the following procedures:
Unofficial Translation a) Reordering for a Fund Transfer in queue is conducted by changing the priority number of the Fund Transfer with the number in the same priority group. b) Participant may only conduct reordering of queued Fund Transfers in priority or normal group. 2) Reprioritization a) Reprioritization of a Fund Transfer in queue is conducted by changing the priority group of the queued Fund Transfer to a priority number of higher or lower priority groups. b) Participant may only conduct reprioritization from priority group to normal group or vice versa. 3) Cancellation a) Cancellation of a Fund Transfer in queue is conducted by canceling such queued Fund Transfer. b) Participant may conduct cancellation of queued Fund Transfer in high priority group, priority group, and normal group. 5. Risk Management To mitigate liquidity and credit risks, Sistem BI-RTGS is equipped with the following facilities: a. FLI…
Unofficial Translation a. FLI
Unofficial Translation c) 40% (forty percent) of the total outgoing payments nominal is settled from 14.00 to 18.00 WIB. 2) Participant may use the throughput guideline set forth in number 1) as a reference for Fund Settlement through Sistem BI-RTGS. c. Liquidity Management Facility
Unofficial Translation Participant other than Participant which bilateral limit has been determined by such Participant. (3) Transaction types which their Fund Settlement may be limited by Counterparty Limit is only transaction types in normal group. (4) Counterparty Limit does not apply to Bank Indonesia. b) Account Limit Account limit is used to reserve some liquidity by Sistem BI-RTGS Participating Bank for Fund Settlement of USD/IDR PvP transaction. c) Execution Time for Fund Settlement (1) Execution time for Fund Settlement is used in the event Participant will determine the execution time of Fund Settlement of its Fund Transfer. (2) Execution time for Fund Settlement consists of: (a) Earliest Time, used in the event Participant is going to determine the time indicator from a certain time when Fund Settlement of its Fund Transfer will be processed in RCN. (b) Latest…
Unofficial Translation (b) Latest Time, used in the event Participant is going to determine the time indicator of up to a certain time limit of Fund Settlement of its Fund Transfer. If its Fund Transfer cannot be settled up to the defined time, it will stay in the queue, and Sistem BIRTGS will issue notification to such Participant several minutes before the defined time. (c) Reject Time, used in the event the Participant is going to determine the time limit of its Fund Transfer to be cancelled by Sistem BI-RTGS if its Fund Transfer is in queue. (3) Participant may use execution time of Fund Settlement consistent with the time period of each transaction type code as determined by the Operator. (4) Participant may use execution time of Fund Settlement for every Fund Transfer sent, and Participant may change the execution time provided that the Fund Settlement of the Fund Transfer in queue within the defined times has not been taken…
Unofficial Translation taken place successfully or the defined times are not yet elapsed. d. Liquidity Saving Facility
Unofficial Translation those in high priority group, priority group, and normal group.. (3) Queued Fund Transfers being multilaterally offset may not be reprioritized, reordered, and cancelled by Participant. e. Gridlock Resolution
Unofficial Translation 6. Fund Settlement Evidence and Report a. Fund Settlement evidence which shall be administered by Participant consists of:
Unofficial Translation Sending Participant obliged to conduct Fund Transfer instruction at the request of sending customer and receiving Participant obliged to forward the fund of Fund Settlement result to receiving customer as specified in a Bank Indonesia regulation on customer protection in fund transfer operation through Sistem BI-RTGS. 8. Fund Return Mechanism a. Fund return for inter-Participant transaction for customer’s interest which Fund Settlement has been conducted in Sistem BI-RTGS may be conducted based on receiving Participant initiative or at the request of sending Participant. b. Fund return set forth in letter a is specified as follows:
Unofficial Translation b) Fund return set forth in letter a) is conducted by sending Fund Settlement instruction by applying the following procedure:
Unofficial Translation a) Fund return at the request of sending Participant is made if sending Participant conduct errors among others are errors in specifying fund amount, fund receiver, and/or duplication in Fund Transfer instruction delivery. b) Sending Participant may request fund return for transaction which Fund Settlement has been conducted in the following procedure: (1) Participant sends fund return request instruction by Request for Payment Return (MTn95/RTRN) message to receiving Participant through RPG or RSTPG application. (2) Sending Participant sends an administrative message on indemnity to receiving Participant. Such indemnity must at least contain: (a) indemnity for receiving Participant, including all of their employees and other parties related to the conduct of fund return for inter-Participant transaction for the customer’s interest which Fund Settlement has been conducted through Sistem BIRTGS…
Unofficial Translation RTGS against any potential claims, actions, obligations, costs and fees, including legal settlement costs and other fees, claims or losses incurred from the fund return conducted the receiving Participant, either at the request of the sending Participant or because the receiving Participant must perform obligations according to the statement contained in the indemnity; and (b) willingness of the sending Participant to assume all costs and fees related to any claims, actions, demands, and other obligations, including legal settlement costs and other fees, as well as any losses suffered by the receiving Participant resulting from fund withdrawal from an ineligible receiving customer. c) Provisions and mechanism for fund return at the request of sending Participant refer to Bank Indonesia regulation on customer protection in fund transfer operation through Sistem BIRTGS. d) in…
Unofficial Translation d) in the eventthe sending Participant makes errors in specifying fund amount, fund receiver, and/or transaction duplication in the Fund Settlement instruction delivery to the government’s account in Bank Indonesia in relation to the State’s revenue transfer transactions or other TSA transactions, then the transaction will be settled in a bilateral manner between the sending Participant and owner of Sub-RKUN KPPN account or owner of any government’s institution account. 9. Transaction Correction Mechanism Sending Participant may lodge correction of transaction to Participant’s customer whose Fund Settlement has been made in Sistem BI-RTGS under the following provisions: a. Correctible transaction data is limited only to the data of fund receiver customer identity, including name, address, and/or transaction information. b. Sending Participant requests corrections with the indemnity set forth in point 8.b.2)b)(2) through administrative message. c. Receiving Participant who receive the transaction correction request shall immediately respond by giving approval or rejection through administrative message. VI. FEE…
Unofficial Translation VI. FEE OF FUND SETTLEMENT OPERATION THROUGH SISTEM BI-RTGS The Operator determines the payable fee by Participants in Fund Settlement operation through Sistem BI-RTGS under the following provisions: A. General Principle
Unofficial Translation 3) Activity time period extension fee at Participant’s request which amount is determined by the Operator based on time extension duration of every 30 (thirty) minutes. 4) Fund Settlement instruction by using BI Cheque and/or BGBI fee which amount is determined by the Operator based on each Fund Settlement instruction. 5) Guest Bank Facility usage fee is under the following provisions: a) the amount of fee is determined by the Operator based on the usage time duration of every 1 (one) hour; and b) the amount of fee set forth in letter a) is calculated based on the attendance list signed by the Operator and Participant. Example of Guest Bank Facility usage cost calculation is set forth in Appendix X. 6) Replacement cost of lost, broken, or new Digital Certificate Hard Token exceeding the maximum limit is determined by the Operator based on each 1 (one) replaced or added Digital Certificate Hard Token. b. The…
Unofficial Translation b. The amount of fee/cost in Fund Settlement operation through Sistem BI-RTGS is determined in the fee/cost breakdown as set forth in Appendix X. c. The amount of fee/cost set forth in letter b is excluding Value Added Tax (VAT). d. The Operator may exempt certain fee/cost in Sistem BIRTGS operation in the event of Unforseeable Condition and/or Emergency Condition. e. Certain fee/cost exemption set forth in letter d is excluding VAT exemption. 2. Fee or Cost Calculation and Charge Fee or cost calculation and charge in Sistem BI-RTGS operation are conducted by the Operator under the following provisions: a. Fee of Fund Settlement instruction for single credit transaction set forth in point 1.a.1)a) and VAT are calculated based on Fund Settlement instruction delivery and fee of administrative message set forth in point 1.a.2) and VAT are calculated based on administrative message delivery for each Participant at the end of the same day on the delivery date of Fund Settlement instruction and/or administrative message. b. Fee of Fund Settlement instruction for multiple credit transaction set forth in point 1.a.1)b) and VAT are calculated at the end of a month for each Participant. c. Fee…
Unofficial Translation c. Fee of Fund Settlement and VAT for transaction using TSA transaction code which do not match that specified by the Operator are calculated monthly based on Fund Settlement instruction delivery. d. Fee of of Fund Settlement activity time extension set forth in point 1.a.3) and VAT are calculated based on activity period time extension duration proposed by Participant. e. Fee of BI Cheque and/or BGBI usage set forth in point 1.a.4) and VAT are calculated based on Fund Settlement instruction using BI Cheque and/or BGBI. f. Fee of Guest Bank Facility usage set forth in point 1.a.5) and VAT are calculated based on the duration of Guest Bank Facility usage. g. Cost of Digital Certificate Hard Token usage set forth in point 1.a.6) and VAT are calculated based on Digital Certificate Hard Token which is replaced or added. h. Fee or cost is charged by the Operator by debiting Participant’s Current Account denominated in Rupiah under the following provisions:
Unofficial Translation 3) the fee or cost set forth in letter d, letter e, letter f, and letter g are charged at the latest 1 following business day after the date of Fund Settlement activity time extension, Fund Settlement operation using BI Cheque and/or BGBI, Guest Bank Facility usage, and/or delivery of replacement and/or addition of Digital Certificate Hard Token to Participants. i. Primarily for calculation and charge of fee of Fund Settlement instruction failing to pass system validation are conducted cumulatively in the following month. C. Fund Transfer Fee Through Sistem BI-RTGS Charged by Participant to Participant’s Customer
Unofficial Translation VII. HANDLING OF UNFORESEEABLE CONDITION AND/OR EMERGENCY CONDITION Provisions and procedures for maintaining sustainable Fund Settlement operation through Sistem BI-RTGS in the event of Unforeseeable Condition and/or Emergency Condition are specified as follows: A. Unforeseeable Condition and/or Emergency Condition at the Operator
Unofficial Translation 2) If Sistem BI-RTGS come into operation, Participant conduct take the following steps: a) reconnect to Sistem BI-RTGS; b) reconciliate transaction data in Participant’s system with Sistem BI-RTGS transaction data at the Operator and check Current Account balance position through RPP; and c) inform to Sistem BI-RTGS help desk if based on the reconciliation result set forth in letter b), there is a difference of Fund Settlement transaction data and/or Current Account balance. c. The activities set forth in number 2 are conducted by Participant based on a notice from Operator by administrative message, BI-SSSS, Sistem BI-RTGS help desk, and/or other means. d. In the event of an Unforeseeable Condition resulting in Sistem BI-RTGS unable to operate until the time limit determined by Operator accordingly Operator determine the policy and procedure for handling Unforeseeable Condition and notify them to Participants. e. in the event of Unforeseeable Condition occurs in Sistem BI-RTGS, resulting in USD/IDR PvP Fund Settlement unable to be conducted, Operator will inform Participant by…
Unofficial Translation by administrative message to settle PvP transactions using system other than that provided by Operator. 2. Emergency Condition at Operator In the event of Emergency Condition occurs at the Operator’s location which affects the smoothness of Sistem BI-RTGS operation or resulting in Sistem BI-RTGS unable to operate until the determined time limit, Operator determine the policy and procedure for handling Emergency Condition and notify all Participants of such Emergency and necessary steps to be conducted by Participant in Sistem BI-RTGS operation. B. Unforeseeable Condition and/or Emergency Condition at Participant
Unofficial Translation Unforeseeable Condition and/or Emergency Condition and their causes; and/or 2) Operator by letter preceded by facsimile in the event the Participant needs a follow up to Fund Settlement activity time extension for required transaction code in accordance with the procedure set forth in point IV.C.5. 2. In the event of Unforeseeable Conditions and/or Emergency Condition at the Participant resulting such Participant unable to conduct Sistem BI-RTGS operational activities, the following procedures apply: a. in the event the Participant unable to use Main RPP, Participant may use Back-up RPP. b. in the event the Participant unable to use Back-up RPP or Participant unable to send Fund Settlement instruction from its office location, Participant may use:
Unofficial Translation notify Operator by letter which may be preceded by facsimile or other means determined by the Operator. 3. In the event of Unforeseeable Conditions and/or Emergency Condition occurs at the Participant, the Operator may determine the policy, procedure, and others necessary steps for transaction settlement by Participants through Sistem BIRTGS. C. Guest Bank Facility Usage
Unofficial Translation b. The request letter set forth in letter shallat least contains:
Unofficial Translation h. If the number of Participants lodging the request exceeds the provided Guest Bank Facility capacity, Operator may determine the order of Guest Bank Facility usage based on Participant arrival order. D. Usage of Bank Indonesia Check and/or Bank Indonesia Bilyet Giro in Unforeseeable Condition and/or Emergency Condition
Unofficial Translation transaction by BI Cheque and/or fund transfer by BGBI, which at least contain the following:
Unofficial Translation 2) For operation in KPwDN, BI Cheque and/or BGBI are/is submitted to KPwDN which in the area of Participant’s office. 3) BI Cheque and/or BGBI set forth in number 1) and number 2) are/is filled in and signed in accordance with the provisions on current account in Bank Indonesia and affixed with Contingency Plan stamp on each sheet of BI Cheque and/or BGBI as set forth in Appendix XIII. 4) BI Cheque and/or BGBI are/is submitted no later than the Fund Settlement instruction delivery time period based on the expiration of the relevant transaction code. f. Bank Indonesia conducts Fund Settlement instruction delivery process if the submitted BI Cheque and/or BGBI fulfilled the requirements specified by Bank Indonesia. g. Fund Settlement evidence of Fund Settlement instruction delivery by using BI Cheque and/or BGBI will be delivered to Participant’s RPP if the Participant’s Sistem BI-RTGS resume normal operation. VIII. EXCLUSION OF THE OPERATOR’S LIABILITY Operator will be held harmless from all claims of any losses suffered by any Participant or third parties arising and/or potentially arising from:
Unofficial Translation
Unofficial Translation a. Off-site monitoring to the Participant is conducted through research, analysis, and evaluation of:
Unofficial Translation If the date above is on Saturday, Sunday, or holiday, the submission time limit will be on the following business day. d) In the event the Participant delays in submitting periodic report, the Participant remain obliged to submit the periodic report no later than 30 (thirty) business days as from the periodic report time limit determined by the Operator. e) Participant will be declared fails to submit its periodic report if the Participant does not submit its periodic report until the time limit set forth in letter d). 2) Incidental Report Incidental reports consist of: a) report submitted by the Participant to the Operator at the Operator’s request; and/or b) report submitted to the Operator on the Participant’s initiative, for example disruption report of Participant’s Sistem BI-RTGS. 3) Reports set forth in number 1) and number 2) are submitted to the Operator at the address set forth in point II.A.2.b. c. Based on the off-site monitoring set forth in letter a, and letter b, the Operator may ask for clarification and/or confirmation to the Participant of any information, data, and/or document. d. In…
Unofficial Translation d. In the event of, based on the off-site monitoring result, any follow-ups are needed by the Participant, the Operator will submit a notice to the Participant to induce change for fulfillment of provisions determined by the Operator. 5. On-Site Monitoring In term of on-site monitoring, the following provisions apply: a. On-site monitoring is conducted through periodic and occasional examination if necessary. b. In the examination set forth in letter a, the following provisions and procedures apply:
Unofficial Translation 4) The Participant obliged to give explanation or information to the officer conducting examination for clarification and/or confirmation of information, data, and/or documents as well as physical facility and supporting application. c. The Operator’s officer conducts an exit meeting with the Participant, which result set forth in an exit meeting report signed by the Operator and the Participant’s competent officer. 6. In the event of Participant compliance monitoring, the Operator may request the Participant to conduct testing of its infrastructure which used in Sistem BI-RTGS operation. 7. The Operator delivers a letter to the Participant on monitoring result and follow-up which shall be conducted by the Participant to fulfill the provisions determined by the Operator. 8. The Participant obliges to conduct further actions response to the monitoring result set forth in number 7. X. ADMINISTRATIVE SANCTION IMPOSITION PROCEDURE A. Administrative Sanction Related to Obligation to Maintain Smoothness and Security of Sistem BI-RTGS Usage
Unofficial Translation 2. In the event the Participant fails to conduct further actions of written warning set forth in number 1 within no later than 30 (thirty) days as from the written warning received, the Participant may be imposed with an administrative sanction in the form of participation status demotion. B. Administrative Sanction related to Obligation to Inform Transaction Fee Any Participant failing to inform transaction fee in Sistem BI-RTGS operation to their customers in a transparent manner set forth in point III.1.5 will be imposed with an administrative sanction in the form of written warning. C. Administrative Sanction Related to the Construction of Fund Settlement Instruction
Unofficial Translation D. Administrative Sanctions Related to Obligations for Fund Settlement Instruction Delivery and Fund Forwarding
Unofficial Translation c. The Participant, which is declared fails to submit the periodic report set forth in point X.4.b.1).e will be imposed with an administrative sanction in the form of payment obligation set forth in letter a and administrative sanction in form of written warning. d. The Participant, which fails to conduct further action to response the administrative sanction in the form of written warning set forth in letter c no later than 30 days as from the written warning, will be imposed with an administrative sanction in the form of participation status d demotion. 2. The Participant, which fails to submit the occasional report set forth in point IX.4.b.2, will be imposed with an administrative sanction in the form of written warning. F. Administrative Sanction Related to Obligation of Data, Information, and/or Document Submission Any Participant fails to submit data, information, and/or documents on Fund Settlement operation through Sistem BI-RTGS set forth in point II.I.6 will be imposed with an administrative sanction in the form of written warning. G. Administrative Sanction Related to Obligation to Grant Access to the Operator
Unofficial Translation 2. The Participants fails to conduct further action on administrative sanction in the form of written warning set forth in number 1 no later than 7 (seven) days as from the written warning received may be imposed with an administrative sanction in the form of participation status demotion. H. Administrative Sanction Related to Obligation of Conducting Further Action on Monitoring Result
Unofficial Translation 2. The existing Sistem BI-RTGS usage agreements between the Operator and Participant prior to the enforcement hereof are declared invalid and shall be replaced with Sistem BI-RTGS usage agreements between the Operator and Participant referring to the agreement content set forth in Appendix IV. 3. The Operator may determine different policies or provisions on real-time Fund Settlement through Sistem BI-RTGS for Bank Indonesia and any other institution approved by the Operator as Participant based on certain needs and characteristics. 4. Appendix I to Appendix XIII constitute an inseparable part hereof. XII. CONCLUDING PROVISION
Unofficial Translation 5. Provision for Participant’s obligation to submit periodic reports in the form of Compliance Assessment Report (LHPK) set forth in point IX.4.b.1).a) comes into force for reporting period of 2016. 6. Provision for administration sanction imposition in the form of payment obligation for transaction code filling violation set forth in point X.C.2 other than TSA transaction code set forth in point V.A.7.b.3) comes into force on July 1st 2016. 7. Provision for administration sanction imposition in the form of payment obligation on Participant who delays in and/or does not submit the periodic reports set forth in point X.E.1.a comes into force on July 1st 2016. 8. At the time of this Bank Indonesia Circular Letter comes into force: a. Bank Indonesia Circular Letter Number 10/9/DASP dated March 5th 2008 on Principles of Sistem BI-RTGS Operation and Supervision; b. Bank Indonesia Circular Letter Number 10/12/DASP dated March 5th 2008 on Fee of Using Sistem Bank Indonesia Real Time Gross Settlement and Sistem Kliring Nasional Bank Indonesia for the operation of Treasury Single Account; c. Bank Indonesia Circular Letter Number 12/1/DASP dated January 21st 2010 on Operation of Sistem Bank Indonesia Real Time Gross Settlement; and d. Bank Indonesia Circular Letter Number 16/18/DASP dated November 28th 2014 on Amendment of Bank Indonesia Circular Letter Number 12/1/DASP dated January 21st 2010 on…
Unofficial Translation on Operation of Sistem Bank Indonesia Real Time Gross Settlement, Shall be revoked and declared not applicable.. This Bank Indonesia Circular Letter comes into force on November 16th 2015. For public cognizance, ordering the promulgation of this Bank Indonesia Circular Letter by placing it in the State Gazette of the Republic of Indonesia. Your attention shall be highly appreciated. BANK INDONESIA, (countersigned) (signed) BRAMUDIJA HADINOTO HEAD OF PAYMENT SYSTEM MANAGEMENT DEPARTMENT