2021-03-08
The European Securities and Markets Authority (ESMA) issued an opinion approving the Spanish regulator CNMV's revised position limits for MEFFPOWER Baseload electricity derivative contracts. The new limits set the spot month cap at 10,000,000 MWh and the other months' cap at 5,000,000 MWh, both calculated in compliance with the methodology established in RTS 21. ESMA concluded that these limits are consistent with MiFID II objectives to prevent market abuse while ensuring orderly trading, provided that the CNMV continues to monitor trading patterns closely.
ESMA • 201-203 rue de Bercy • CS 80910 • 75589 Paris Cedex 12 • France • Tel. +33 (0) 1 58 36 43 21 • www.esma.europa.eu OPINION on position limits on MEFFPOWER Baseload contracts I.Introduction and legal basis
this opinion and replace the previous position limits as determined by the CNMV. In this opinion, ESMA is assessing whether the new position limits the CNMV intends to set for the MEFFPOWER Baseload contracts comply with the methodology established in RTS 21 and are consistent with the objectives of Article 57 of MiFID II II. Contract classification Commodity base product: energy (NRGY) Commodity sub product: electricity (ELEC) Commodity further sub product: base load (BSLD) Name of trading venue: MEFF - SEGMENTO DERIVADOS ENERGIA, MIC: XMPW Venue product code: DEEB III.Market description 5. MEFFPOWER Baseload contracts are cash settled derivatives (futures and swaps) settling against the reference daily price of the spot market for the taking and delivery of electricity in Spain. 6. Every day the reference price is calculated for the next day as the arithmetic average of the 24 hourly prices obtained for the Spanish bidding zone of the project PCR (Price Coupling of Regions), an auction for which an only complex algorithm provides the programming of taking and delivery of electricity in several European bidding zones. 7. In electricity, Spain and Portugal form a single spot market (MIBEL) with two bidding zones. The market splits in two different prices (one for Spain and the other for Portugal) when the implicit flow of power from the results of the algorithm PCR is not compatible with the available capacity of the Spain-Portugal power interconnection. This market splitting happens in a low percentage of hours because the coupling rate between Spain-Portugal bidding zones has been consistently over 90% from 2011 (even higher, 98% in 2015 and 95% in 2018 and 2019). That is, more than 90% of all the hours, the price in the spot power market is identical in Spain and Portugal. 8. Another way to measure the coupling is that the annual average difference of spot hourly prices between Spanish and Portuguese power markets has been below 1€/MWh every year since 2009. This fact is very relevant also for the derivatives market, since SPEL contracts with cash settlement against the Spanish power spot price are the benchmark used to cover market risks in MIBEL, for those exposed to either Spanish or Portuguese
spot prices, because derivatives over Spanish prices are much more liquid than those over Portuguese prices. 9. On the other hand, the power interconnection capacity between Spain and France has been historically very limited and currently is below 3% of Spanish generation capacity. For this reason, the percentage of hours in which the power interconnection Spain-France was congested and the commercial flow of electricity between Spain and France was limited by its capacity was very high, 77,5 % of the hours of 2019. Consequently, Iberian power system is basically considered isolated and MIBEL electricity prices are uncoupled very often with the central European prices, being higher than these for most of the hours. 10. Other important characteristic of the Spanish electricity system is the high proportion of renewable generation capacity from sources like wind power, photovoltaic solar power and solar thermal power, whose fuels (wind and sun) are neither storable nor manageable as gas and coal are. At the end of 2019, wind and solar generation capacity accounted together for the 34,6 % of the overall generation capacity in Spain (peninsula) and those technologies produced the 27,2 % of the total power produced. 11. In Spain, retail demand is seasonal, being higher in extreme weather conditions in summer and winter, and lower in autumns and specially in springs. 12. In addition to these features from MIBEL, it is important to consider the following general characteristics of the power market: 13. Electricity is a grid-bound commodity, where delivery takes place through meshed transmission system grids and power producers have no control over the actual destination of the generated electricity. 14. The electricity system is critical, not only for the economy but also for reasons related to national security. For this reason, it is subject to close surveillance of national and European regulators, including supervision for the purpose of the prevention of abusive practices of dominant positions. Similar to financial markets, REMIT prohibits market manipulation of the spot market. 15. Power is a basic product for the standard of leaving whose demand generally shows a very low elasticity to price: price movements do not lead to significant changes in demand. For this reason, the ability to manage the demand is small, in terms of global quantity and in relation of the time in the day to be satisfied, as there is a daily pattern that just reflects human activity. Only large industrial consumers adapt their power consumption to the hours when electricity demand and prices are lower. 16. Then, it is supply that has to be very flexible to match this demand, also due to two other main features:
It is composed of the domestic Net Generating Capacity in Spain and its average yearly import capacities from its neighbouring countries (France and Portugal) as displayed on ENTSO-e Transparency Platform for 2020. 22. The Net Generating Capacity (in MW) in 2020 for Spain was 107,392 MW. Imports Capacity from neighbouring countries (France and Portugal) for 2020 was 4,664 MW, coming up to a total Deliverable Supply of 112,056 MW. 23. These values of ENTSO-E have been converted from MW to MWh per year. The overall value was then divided by the factor of 12 in order to align the deliverable supply to the time frame of one calendar month for the spot month period, resulting in a deliverable supply of 81,800,980 MWh. Spot month position limit 4 This pattern in hourly volatile prices explains why a peakload contract exists as a different contract than the baseload one. 5 European Network of Transmission System Operators for Electricity.
Other months’ position limit Open interest 33. The open interest amounts to 10,184,962 MWh. The open interest for every holder is the aggregation (in units of underlying MWh) of all the derivatives (futures and swaps) on Spanish baseload contracts of power registered as traded in MEFFPOWER. The source of the data is the daily position reporting of MEFFPOWER that is received by the CNMV. 34. The open interest has been calculated as the daily average of total open interest in MEFFPOWER baseload contracts from 1 October 2019 to 30 September 2020. The absolute values of daily net positions per position holder have been added up and divided by the factor 2 ("net approach"). The figure for the daily calculation aggregates the position in all the contracts previously referred: not only those that are still opened to trade, but also those whose registration is no longer possible but whose delivery period has not finished the day of the daily calculation. Other months’ position limit 35. The other months limit amounts to 5,000,000 MWh, which represents 49,1% of the open interest. Other months’ position limit rationale 36. As there is no market maker for this contract, according to Article 19(2)(b) of RTS 21, the position limit for this contract can be set between 5% and 50% of open interest. 37. The CNMV has considered the following factors relevant for adjusting the other months’ limit upwards: • Article 16 of RTS 21: There is large number of separate expiries open for registration, which number fluctuates from a minimum of 70 to a maximum of 100. Currently, the contract registered in MEFFPOWER Spanish Baseload contracts with the furthest expiry is the calendar year 2030. • Article 18(3) of RTS 21: The overall open interest is significantly lower than deliverable supply. Deliverable supply is more than 8 times larger than the overall open interest. 38. In considering the volatility in the contract, as required by Article 21 of RTS 21, there has been some variation in the price of the commodity derivative but the CNMV has not found evidence that this is excessive or that lower position limits would reduce volatility. 39. All the other potential adjustment factors set out in RTS 21 have been considered and were not regarded as material or relevant to require additional adjustments, either up or down, from the baseline.
Position limit as % of Deliverable Supply Position limit as % of Open Interest 5,000,000 10,000,000 49,1% 12,2% 0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 12,000,000 Other Months' Limit Spot Month Limit Number of MWh Position limits applying during the lifetime of a MEFFPOWER Spanish Baseload Contract Spot month position limit 47. The deliverable supply was estimated based on ENTSO-e data. It is composed of the average Spanish domestic Net Generating Capacity (NGC) and of Import capacity to Spain from France and Portugal for year 2020. This ensures publicly available figures consistent at the European level. 48. ESMA considers that the methodology used to calculate deliverable supply is consistent with Article 10(1) of RTS 21 that sets out that deliverable supply shall be calculated “by identifying the quantity of the underlying commodity that can be used to fulfil the delivery requirements of the commodity derivative.” 49. The monthly deliverable supply figure has been calculated by converting the capacity (expressed in MW) to MWh per month. 50. This approach is consistent with Article 10(2) of RTS 21, which sets out that “Competent authorities shall determine the deliverable supply […] by reference to the average monthly amount of the underlying commodity available for delivery over the one-year period immediately preceding the determination”. 51. ESMA agrees that the rationale underpinning Article 18(3) with respect to the other months’ enables the national competent authority to adjust the spot month limit downwards in case the deliverable supply is significantly higher than the open interest. ESMA therefore considers that a downward adjustment of the spot month limit for the MEFFPOWER Baseload
contracts is reasonable under Article 18(3) given the very large difference between deliverable supply and open interest. Other months’ position limit 52. The open interest has been calculated by CNMV as the daily average of total open interest in MEFFPOWER Spanish Baseload contracts from 1 October 2019 to 30 September 2020 based on position reporting data where the daily net positions have been added up and divided by the factor 2 ("net approach"). ESMA considers that such calculation of open interest by the competent authority provides the most accurate and reliable figure and promotes convergence in the setting of position limits by competent authorities. ESMA is also of the view that taking 1 October 2019 to 30 September 2020 as a reference period is sensible in this case as an average for a period of time gives a more stable measure of open interest and considers such approach consistent with Article 12 of RTS 21. 53. ESMA considers that the adjustment made under Article 16 of RTS 21 is appropriate given the large number of separate expiries. 54. The other months’ limit has been adjusted upwards to take into consideration the fact that the amount of open interest is significantly lower than the deliverable supply. This is consistent with Article 18(3) of RTS 21. 55. Consequently, these position limits have been set following the methodology established by RTS 21. 56. ESMA also notes that, overall, the position limits set result in a consistent and harmonised approach in the application of position limits for derivatives contracts based on Spanish power. Compatibility with the objectives of Article 57(1) of MiFID II 57. Under Article 57(1) of MiFID II, the objectives of the position limits are to prevent market abuse and support orderly pricing and settlement conditions including preventing market distorting positions. 58. With respect to the spot month limit, ESMA notes, based on the information provided by the competent authority, that the limit is substantially higher than open interest in the spot month throughout 2020. 59. ESMA understands the need to avoid the risk of unduly constraining trading in this commodity derivative market where participants in the underlying market have a key presence. However, there is a risk that the objectives set out in Article 57(1) of MiFID II may not be achieved where the limit set for the spot month is well above the positions held by market participants in the spot month.