2013-06-03 | 2013-13045The Commodity Futures Trading Commission issued a final rule correction to fix an omission in the Federal Register publication of its June 2012 final rule regarding Core Principles for Designated Contract Markets. This administrative correction inserts the missing amendatory instruction to add Appendix C to 17 CFR Part 38, which details the demonstration of compliance that a contract is not readily susceptible to manipulation. The correction is effective May 29, 2013, and does not alter the substantive text of Appendix C as originally published.
32988 Federal Register / Vol. 78, No. 106 / Monday, June 3, 2013 / Rules and Regulations SUPPLEMENT NO. 7 TO PART 748—AUTHORIZATION VALIDATED END-USER (VEU): LIST OF VALIDATED END-USERS, RESPECTIVE ITEMS ELIGIBLE FOR EXPORT, REEXPORT AND TRANSFER, AND ELIGIBLE DESTINATIONS—Continued Country Validated end-user Eligible items (by ECCN) Eligible destination Federal register citation Shanghai Huahong Grace Semiconductor Manufacturing Corporation. 1C350.c.3, 1C350.d.7, 2B230, 2B350.d.2, 2B350.g.3, 2B350.i.4, 3B001.a.1, 3B001.b, 3B001.c, 3B001.e, 3B001.f, 3B001.h, 3C002, 3C004, 5B002, and 5E002 (limited to production technology for integrated circuits controlled by ECCNs 5A002 or 5A992 that have been successfully reviewed under the encryption review process specified in Sections 740.17(b)(2) or 740.17(b)(3) and 742.15 of the EAR). Shanghai Huahong Grace Semiconductor Manufacturing Corporation—HFab 2, 668 Guoshoujing Road, Zhangjiang Hi-Tech Park, Shanghai 201203 China. Shanghai Huahong Grace Semiconductor Manufacturing Corporation—HFab 1, 1188 Chuanqiao Road, Pudong, Shanghai 201206 China. Shanghai Huahong Grace Semiconductor Manufacturing Corporation—GFab1, 1399 Zuchongzhi Road, Zhangjiang Hi-Tech Park, Shanghai 201203 China. 78 FR [INSERT PAGE NUMBER], 6/3/13. SK hynix Semiconductor (China) Ltd. 3B001.a, 3B001.b, 3B001.c, 3B001.e, and 3B001.f. SK hynix Semiconductor (China) Ltd., Lot K7/K7–1, Export Processing Zone, Wuxi, Jiangsu, China 214028. 75 FR 62462, 10/12/ 10. 77 FR 40258, 7/9/12. 78 FR 3319, 1/16/13. SK hynix Semiconductor (Wuxi) Ltd. 3B001.a, 3B001.b, 3B001.c, 3B001.e, and 3B001.f. SK hynix Semiconductor (Wuxi) Ltd., Lot K7/K7–1, Export Processing Zone, Wuxi, Jiangsu, China 214028. 75 FR 62462, 10/12/ 10. 77 FR 40258, 7/9/12. 78 FR 3319, 1/16/13. India ........................... GE India Industrial Pvt Ltd.. 1C002.a.1, 1C002.a.2, 1C002.b.1.a, 1C002.b.1.b, 1E001, 2E003.f, 9E003.a.1, 9E003.a.2, 9E003.a.4, 9E003.a.5, 9E003.a.6, 9E003.a.8, and 9E003.c. GE India Technology Centre Private Limited (GEITC), No. 122, EPIP, Phase II, Hoodi Village, Whitefield Road, Bangalore 560066, Karnataka, India. Bangalore Engineering Center (BEC), c/o GE India Technology Centre Private Limited (GEITC), No. 122, EPIP, Phase II, Hoodi Village, Whitefield Road, Bangalore 560066, Karnataka, India. 74 FR 31620, 7/2/09. 74 FR 68147, 12/23/ 09. 77 FR 10953, 2/24/12. [FR Doc. 2013–13076 Filed 5–31–13; 8:45 am] BILLING CODE 3510–33–P COMMODITY FUTURES TRADING COMMISSION 17 CFR Part 38 RIN 3038–AD09 Core Principles and Other Requirements for Designated Contract Markets; Correction AGENCY: Commodity Futures Trading Commission. ACTION: Final rule; correction. SUMMARY: This document corrects the Federal Register release of the final rule regarding Core Principles and Other Requirements for Designated Contract Markets by inserting a missing instruction to add Appendix C to 17 CFR part 38. This is a correction to the Federal Register only, which does not affect the text of Appendix C as published in the final rule. DATES: This correction is effective May 29, 2013. FOR FURTHER INFORMATION CONTACT: Christopher Kirkpatrick, Deputy Secretary, Commodity Futures Trading Commission, Three Lafayette Centre, 1155 21st Street NW., Washington, DC 20581; 202–418–5964; CKirkpatrick@cftc.gov. SUPPLEMENTARY INFORMATION: The Commodity Futures Trading Commission is correcting amendatory language for the previously published Federal Register release of the final rule regarding Core Principles and Other Requirements for Designated Contract Markets (77 FR 36612, June 19, 2012). The final rule, as published in the Federal Register, included an Appendix C to 17 CFR part 38, ‘‘Demonstration of Compliance That a Contract Is Not Readily Susceptible to Manipulation.’’ However, the instruction to add that appendix to the Code of Federal Regulations was inadvertently omitted from the Federal Register publication of the final rule. Therefore, on page 36722, at the top of the first column, immediately before the heading, ‘‘Appendix C—Demonstration of Compliance That a Contract Is Not Readily Susceptible to Manipulation,’’ insert the following amendatory instruction:
■ 20. Add appendix C to part 38 to read as follows:
Dated: May 29, 2013. Christopher J. Kirkpatrick, Deputy Secretary of the Commission. [FR Doc. 2013–13045 Filed 5–29–13; 4:15 pm] BILLING CODE 6351–01–P VerDate Mar<15>2010 15:55 May 31, 2013 Jkt 229001 PO 00000 Frm 00010 Fmt 4700 Sfmt 9990 E:\FR\FM\03JNR1.SGM 03JNR1 tkelley on DSK3SPTVN1PROD with RULES