Bangladesh Bank establishes a refinance facility under the Supporting Post COVID-19 Small Scale Employment Creation Project (SPCSSECP) to provide up to US$150 million in funding for Cottage, Micro and Small Enterprises (CMSEs). Participating Financial Institutions (PFIs) must meet specific eligibility criteria, including a CAMELS rating of 2 or better and a non-performing loan ratio below 10%, to on-lend funds to targeted groups such as returning migrant workers and unemployed youth. The facility offers refinancing at 1.50% to PFIs, with a maximum sub-loan limit of BDT 5 million and a maximum interest rate of 5.50% for end borrowers. PFIs are required to submit monthly refinance applications within 20 days of the following month and ensure that at least 20% of qualified enterprises are women-led.
Page 1 of 5 50080 BANGLADESH BANK (The Central Bank of Bangladesh) Head Office Motijheel, Dhaka-1000 Website: www.bb.org.bd SME & Special Programmes Department SPCSSECP PMU SMESPD (SPCSSECP) Circular No.: 02 Date: Chief Executive Officer (CEO)/Managing Director (MD) All Banks and Financial Institutions in Bangladesh Head Office Dhaka. Dear Sir, Refinance Facility under ‘Supporting Post COVID-19 Small Scale Employment Creation Project (SPCSSECP)’ to Support Cottage, Micro and Small Enterprises (CMSEs).
Page 2 of 5 5. Major Features of the Project: i. Name of the Project : Supporting Post COVID-19 Small Scale Employment Creation Project (SPCSSECP) ii. Sources of Fund : Asian Development Bank (ADB) iii. Size of the Project : US$150 million (Tk.1,290 Crore; US$1 = Tk.86.00) iv. Duration of the Project : 03.5 Years (January 2022-June 2025) v. Purpose of the Project : Restore employment, income and economic activities through providing financial support to Cottage, Micro and Small Enterprises (CMSEs) started or operated by returning migrant workers, unemployed youth and rural entrepreneurs with a special focus on women entrepreneurs. vi. Maximum Loan Limit : BDT05 million (BDT50 Lac) vii. Repayment Term : Maximum 5 years viii. Collateral : PFIs will decide the collateral issues following the Bangladesh Bank’s Prudential Guidelines and Circulars. ix. Target Group : Cottage, Micro and Small Enterprises (CMSEs) as defined by the Bangladesh Bank (SMESPD Circular No. 02, dated 05/09/2019 and subsequent changes thereon) and operated by- (a) Returning Migrant Workers (returned since the beginning of 2020); or (b) Unemployed or Underemployed Youth (age between 18-45 years old) who have received training from the government approved institutions; or (c) Rural Entrepreneurs residing outside Dhaka and Chattogram Metropolitan Areas. x. Special Criteria : At least 20% of the qualified enterprises under the project shall be women-led enterprises. xi. Interest Rate : (a) Refinance facility will be provided to the PFIs at the rate of 1.50% (b) The interest rate will be maximum 5.50% for the sub borrowers/end borrowers. 6. Participating Financial Institutions (PFIs) Selection Criteria: (a) Each PFI must have Cottage, Micro and Small (CMS) lending commitment, capacity and have a track record of performance on lending to the relevant sectors. (b) Each PFI must be compliant with applicable Prudential Regulations and Guidelines of the Bangladesh Bank. (c) Each PFI must have a minimum rating of 2 or better on the CAMELS-based assessment carried out by the Bangladesh Bank. Each PFI must maintain required rating throughout the period of the project, unless it is a target bank (a state owned bank or financial institution owned by the government, or a bank or financial institution established under a special act) for which Ministry of Finance (MoF) has provided a guarantee for the repayment of the principal, interest and other charges in favor of the Bangladesh Bank.
Page 3 of 5 (d) The non-performing loan ratio must be lower than 10% unless it is a target bank for which MoF has provided a guarantee in favor of the Bangladesh Bank. (e) Committed to disburse at least US$03 million each year under this project. 7. Participating Financial Institutions (PFIs) Agreement: All qualified and interested Banks/Financial Institutions shall apply to the Bangladesh Bank as per Annexure-1 with duly filled up templates (Annexure-2 and Annexure-3) to express their intention to become a Participating Financial Institution (PFI) of the project. Eligible Banks/Financial Institutions have to enter into a Participation Agreement to avail the refinance facility under the project. Qualified Banks/Financial Institutions have to follow the rules and regulations concerning to Cottage, Micro, Small & Medium Enterprises (CMSMEs) Financing stated in the SMESPD Circular No. 02, dated 05/09/2019 and subsequent changes thereon and Project Administration Manual (PAM) of the project. 8. Procedure for Refinance Application: PFIs will apply to the Bangladesh Bank with duly filled up templates (Annexure-4 & Annexure-5) attached with this Circular on a monthly basis within 20 (Twenty) days of the following month to receive refinance facility against disbursed loans and advances under the terms and conditions of the project. However, if any PFI fails to apply for refinance facility against loans and advances within the stipulated time mentioned above under any valid reason, that PFI may get additional 30 (thirty) days for submitting the refinance application which will be considered case to case basis by the Project Management Unit (PMU). PFIs must submit copies of entrepreneur’s Trade License, NID/Passport, Sanction Letter, Loan Statement and Amortization Schedule along with other documents (Bill of Entry, LC documents, Invoice, Quotation etc.) if necessary. 9. Limit of Loan and Refinance Facility: For any sub loan, PFIs shall not finance more than 80% of the total cost of qualified subprojects and sub borrowers/end borrowers must contribute at least 20% of the equity in the business. The Bangladesh Bank shall provide 100% refinance against the loans and advances made by the PFIs to the qualified sub borrowers/end borrowers. SMESPD Circular No. 02, dated 05/09/2019 (amended thereinafter) and any other Circulars/Circular Letters which may be issued by the Bangladesh Bank from time to time will be applicable for the highest loan limit of Cottage, Micro and Small Enterprises (CMSEs). However, the amount of refinance facility in individual cases shall not exceed Tk.50 (Fifty) Lac in any circumstances. Refinance facilities will be made available to the PFIs on ‘First Come, First Served’ basis and subject to the availability of the fund in this project. 10. Types of Sub Loans: Under this project, refinance facility will be available for Working Capital/Short Term, Medium Term and Long Term Loan. Working Capital/Short Term Loan will be for 01 (One) year, Medium Term Loan will be for maximum 03 (Three) years and Long Term Loan will be for maximum 05 (Five) years in tenure. However, PFIs may
Page 4 of 5 provide maximum 06 months grace period to the sub borrowers/end borrowers and such grace period shall be incorporated in refinancing the sub loans. 11. Sub Loans & Sub Borrower/End Borrower Criteria: To avail the refinance facility from the project a qualified sub borrower must fulfill the terms and conditions as set forth in the Appendix 03 of the Project Administration Manual (PAM) and other Circulars/Circular Letters which may be issued by the Bangladesh Bank from time to time. 12. Women-led Enterprise: A qualified enterprise shall be considered as a Women-led Enterprise on the following grounds: (a) If women are the owners or proprietors of a privately-run enterprise or own at least a 51% share of the enterprise; or (b) If at least 60% of its managerial staffs are women; or (c) As defined by the Bangladesh Bank, provided that for the purposes of the project, such definition shall be agreed between the Bangladesh Bank and ADB. 13. Recovery of Refinanced amount: The amount received as refinance facility by the PFIs from the project shall be repayable to the Bangladesh Bank as follows: (a) It is the sole responsibility of the respective PFI to recover the loans and advances made to the beneficiary under this project; there will be no relation whatsoever between recovery of loans and advances from the beneficiary and repayment of fund taken as refinance under this project to SPCSSECP of the Bangladesh Bank. (b) Working Capital/Short Term Loans will be repayable at the end of the loan period in a single installment (which includes both principal & interest). (c) Total principal and interest amount of medium & long term loan will be repayable on equal quarterly installment from the date of receiving refinance and the tenure of the refinance facility will be same as mentioned in the Sanction Letter of the PFIs. (d) The Bangladesh Bank will realize the refinanced amount along with interest, any kind of charges and penalty (if any) by debiting their current account maintained with Motijheel Office of the Bangladesh Bank. 14. Environmental and Social Management System Arrangement: All interested Banks/ Financial Institutions are required to follow Environmental and Social Risk Management (ESRM) Guidelines of the Bangladesh Bank as well as Environmental and Social Management System Arrangement (ESMSA) of the project issued by ADB (Attachment-2) during providing CMSEs loan to the targeted groups.
Annexure-1 (Accreditation Application Format) Project Director Supporting Post COVID-19 Small Scale Employment Creation Project (SPCSSECP) Bangladesh Bank Head Office Dhaka-1000 Dear Sir, Letter of Intent to become Participating Financial Institution (PFI) under ‘Supporting Post COVID-19 Small Scale Employment Creation Project (SPCSSECP)’ With reference to the SMESPD (SPCSSECP) Circular No.: 02/2022 dated 10/03/2022 we would like to express our interest for participating in the Supporting Post COVID-19 Small Scale Employment Creation Project (SPCSSECP). The documents are attached herewith as required for your kind consideration. We also furnish the information as sought in the annexure of the Circular and in the Project Administration Manual (PAM). We, therefore, request you to consider our application and allow us to work with you for the development of CMSE sectors in Bangladesh through our active participation in Supporting Post COVID-19 Small Scale Employment Creation Project (SPCSSECP) finance. Truly yours, Date:
( ) CEO/MD Bank/FI Name
Annexure-2 (Business Information Form) Business Statements Name of the Bank/FI: Serial No. Criteria Statement Year/ Amount Put Tick Mark Based on Reference Value Reference Value 1 Legality Date of License Received from the Bangladesh Bank N/A N/A 2 Operational Experience Establishment Year Yes No ( ≥ 5 years) 3 Commitment to CMSEs Lending Commitment to provide financial support to Cottage, Micro and Small Enterprises (CMSEs) operated by returning migrant workers, unemployed youth and rural entrepreneurs with a special focus on women entrepreneurs. N/A Yes No N/A 4 Capital Adequacy (for the last year) i. Net Worth Taka in million (as on ..……………………... ) N/A N/A ii. Paid-up Capital Taka in million (as on ..……………………... ) N/A N/A iii. Capital Adequacy Ratio (CAR) CAR as on ………………………………... (Evaluted by Bangladesh Bank) Yes No ( > 10%) 5 Profitability: Net Profit (for last 02 years) Taka in million (for the Year Ending …………………………...) Yes No ( > 0 ) Taka in million (for the Year Ending …………………………...) Yes No ( > 0 ) 6 Non-Performing Loan (NPL) of the Last Quarter NPL Ratio: (as on ………………………………...) Yes No ( < 10%) 7 CAMELS Rating (Latest) (as on ..……………………...) Yes No ( ≤ 2) 8 Target Bank Target bank will be defined as per SMESPD (SPCSSECP) Circular No.:02; dated: 10/03/2022 N/A Yes No N/A 9 Fulfilling the Prudential Regulations: i. Transparency N/A Yes No N/A ii. Corporate Governance Yes No iii. Risk Management Yes No iv. AML Requirements Yes No v. Green Banking Guidelines Yes No vi. Others, if any Yes No 10 Copy of Audited Financial Statements for the last 2 years (as attached) Yes No 11 Others, if any, Please Mention and Attach in Separate Page Yes No
Annexure-3 (Financial Information Form) Financial Statements Name of the Bank/FI: (in million taka) Description (Year)* Share of Total (%) Growth (%) (Year)* Share of Total (%) Growth (%) (Year)* Share of Total (%) Growth (%) 1 2 3 4 5 6 7 8 9 10 Balance Sheet Cash & Cash Equivalents Short Term Liquid Assets Net Loans and Advances Others Assets Total Assets Deposit from Customers Due to Banks & NBFIs Others Liabilities Total Liabilities Share Capital Other Reserves Retained Earnings Total Equity Total Equity & Liabilities Income Statement Interest Income Non-interest Income Total Revenue Net Interest Income Net Non-interest Income Total Net Revenue (Operating Income) Operating Expenses Contingent Risk Expenses Net Non-operating Income Profit Before Tax Net Profit
Annexure-3 (Financial Information Form) (continued….) Description (Year)* Share of Total (%) Growth (%) (Year)* Share of Total (%) Growth (%) (Year)* Share of Total (%) Growth (%) 1 2 3 4 5 6 7 8 9 10 Operational Ratio Capital Adequacy Ratio (>10%) Liquidity Single Borrower Exposure (<20%) Forex Exposure (<40%) ADR LDR NPL ROE ROA
Sl. No. Description Remarks 1 Name of Bank/Financial Institution (FI) 2 Date of Application 3 Financing Period Type of Loan Tenure Working capital/Short Term ≥ 1 Years Mid Term 1-3 Years Long Term 3-5 Years Total Number Amount (In BDT) Number Amount (In BDT) Working capital/Short Term Mid Term Long Term Total Type of Entrepreneur New Existing Total Type of Borrower First Time Borrower Old Borrower Total Type of Enterprise Cottage Micro Small Total Type of Project Manufacturing Service Trading Total Number Amount (In BDT) Number Small Enterprise Refinance Scheme Refinance Scheme for Agro-based Industries New Entrepreneur Refinance Scheme Islamic Shariah-based Refinance Fund COVID-19 Refinance Scheme JICA FSPDSME JICA UBSP SREUP Covid-19 ECRF Project SMEDP2 Others ( If any please mentioned) Total Date No Date: Name of the Scheme/Project 7 8 9 10 Capital Amount (In BDT) Number Amount (In BDT) Eligibility to Apply for Refinancing Faclity from SPCSSECP Number Amount (In BDT) Number Amount (In BDT) Balance (outstanding) with BB Details of Refinance Facility Availed by the Bank/FI from other Funds/Projects of Bangladesh Bank and Current Balance: Financial Information of the Bank/FI at the end of Last Quarter Amount (In BDT)/Ratio Capital Adequacy Ratio Head Office, Dhaka Supporting Post COVID-19 Small Scale Employment Creation Project (SPCSSECP) Entrepreneurial Level Description of the Financed Sub-Projects under this Application: Application for Sanctioning Refinance Relevant Information Details of the Refinance Application: Number Amount (In BDT) 5 4 6 Amount of Refinance (availed) and Balance (outstanding) by the Bank/FI under this Project: Refinance (Availed ) Balance (outstanding) with BB Category of Loan Number Amount (In BDT) Annexure-4 (Application for Sanctioning Refinance) Seal 11 (Signature) Head of SME Type of Sub-Projects Financed under this Application: ………. Years Yes Compliance on Risk Management and Anti-Money Laundering related Regulations Compliance of Refinance Based on SMESPD (SPCSSECP) Circular General Declaration Please Put Tick Mark Bangladesh Bank Yes Whether Enterprise(s) is(are) located outside Dhaka and Chattogram Metropolitan areas? Whether Enterprise(s) is(are) Defaulter(s)? 12 Yes Yes Refinance (Availed ) CRR SLR Business Experience of the PFIs Compliance on Single or Group Borrower’s Exposure related Policy or Guidelines Percentage of Non-performing Loan against Total Disbursement Advance Deposit Ratio/Loan to Fund Ratio
Male Female 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 Statement of Loan Applied for Refinance Under SPCSSECP Name of the Bank/FI: Name of the Financing Month: Remarks Date of Disbursement Number of Employee Purpose of Loan Loan Limit (In BDT) Amount of Disbursed Loan (In BDT) Interest Rate (%) Grace Period (Month) Nature of Loan Nature of CMSE Owner's Equity (%) Annexure-5 (Statement of Loan Applied for Refinance) Nature of Business Name/ Type of Product Sl. No. Name of the Enterprise and Date of Incorporation Location/ Address of the Enterprise Type of Ownership Name of Owner(s), Age, NID and Phone Number Ownership by Gender Target Group Fixed Assets of the Enterprise (Excluding Land & Building) Districts and Divisions Name of Financing Branch Annual Sales Turnover (In Crore) Type of Project Tenure of Loan (Month)
Annexure-6 (Contact Details) Contact details of Relevant Personnel Name of the PFI: Sl. No. Name of the Nominated Officials Assigned for this Project Related Communication Mailing Address Electronic Communications Address Line 1 Address Line 2 City Post Code Phone Number Fax Number Cell phone Number E-mail
Attachment-1 Project Administration Manual Supporting Post COVID-19 Small Scale Employment Creation Project (SPCSSECP) Project Number: 54336-001 October 2021 (RRP BAN 54336)
ABBREVIATIONS ADB – Asian Development Bank CMSE – cottage, micro, small enterprise COVID-19 – coronavirus disease FMA – financial management assessment GAP – gender action plan MOF-FD – Ministry of Finance–Finance Division PFI – participating financial institution PMU – project management unit PPMS – project performance management system SOE – statement of expenditures TA – technical assistance
CONTENTS I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION PLANS 1 A. Project Readiness Activities 1 B. Overall Project Implementation Plan 3 III. PROJECT MANAGEMENT ARRANGEMENTS 4 A. Project Implementation Organizations: Roles and Responsibilities 4 B. Key Persons Involved in Implementation 7 C. Project Organization Structure 8 IV. COSTS AND FINANCING 8 A. Cost Estimates Preparation and Revisions 9 B. Detailed Cost Estimates by Expenditure Category 9 C. Allocation and Withdrawal of Loan Proceeds 9 D. Disbursement S-Curve 10 E. Fund Flow Diagram 11 V. FINANCIAL MANAGEMENT 11 A. Financial Management Assessment 11 B. Disbursement 16 C. Accounting 17 D. Auditing and Public Disclosure 17 VI. PROCUREMENT AND CONSULTING SERVICES 19 A. Advance Contracting and Retroactive Financing 19 B. Procurement of Goods, Works, and Consulting Services 19 VII. SAFEGUARDS 19 VIII. GENDER AND SOCIAL DIMENSIONS 20 IX. PERFORMANCE MONITORING, EVALUATION, REPORTING, AND COMMUNICATION 22 A. Project Design and Monitoring Framework 22 B. Monitoring 24 C. Evaluation 24 D. Reporting 25 E. Stakeholder Communication Strategy 25 X. ANTICORRUPTION POLICY 25 XI. ACCOUNTABILITY MECHANISM 26 XII. RECORD OF CHANGES TO THE PROJECT ADMINISTRATION MANUAL 26 APPENDIXES 1 Annual Environmental and Social Monitoring Report.....................................................28 2 Participating Financial Institutions Selection Criteria .....................................................30 3 Subloan and Subborrower Criteria.................................................................................32 4 Quarterly/Annual Monitoring Report .............................................................................33 5 Semiannual Gender Action Monitoring Report...............................................................39
Project Administration Manual Purpose and Process
I. PROJECT DESCRIPTION
2 Indicative Activities 2021 2022 Responsible Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Unit subproject screening checklist Signing of the subsidiary loan agreements between MOF and Bangladesh Bank ▲ MOF, Bangladesh Bank Loan effectiveness ▲ ADB Onlending arrangements between Bangladesh Bank and PFIs are in place ▲ ▲ ▲ ADB, Bangladesh Bank, PFIs ADB = Asian Development Bank, MOF = Ministry of Finance, PFI = participating financial institution. Source:Asian Development Bank.
3 2. Overall Project Implementation Plan 3. The scheduled implementation period for the project is 3.5 years (January 2022–June 2025). Table 2: Implementation PlanKey Activities with Milestones 2021 2022 2023 2024 2025 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
4 III. PROJECT MANAGEMENT ARRANGEMENTS
5 11. The structure of PMU will be as shown below in Figure 1. 12. The various functions of the PMU, which include implementation, administration, and operation of the project on behalf of the implementing agencyare shown below: (i) General Administration and Treasury Section (a) Coordination with Bangladesh Bank‘s other departments for general affairs; (b) Provision of necessary administrative assistance for other sections of the PMU; (c) Due maintenance of the advance account,0F 1 project operating account, and revolving fund account established for the loan administration; (d) Instruction to the Accounts and Budgeting Department to transfer funds to be paid by PFI to the revolving fund account, Bangladesh Bank‘s revenue account, and Ministry of Finance‘s revenue account; (e) Preparation of statements of the project accounts; and (f) Full cooperation to external audit of the advance account, the project operating account, and the revolving fund account as well as to the external audit for statement of expenditures (SOEs). (ii) Loan Administration (a) Conducting the accreditation of PFIs, including annual reviews; (b) Concluding a participation agreement with PFIs;
1 Advance account is equivalent to the terminology ―imprest account‖ used in Bangladesh Bank and Finance Division of MOF.
6 (c) Review of subloans applications from PFIs; (d) Approval and disbursement of the funds to PFIs; (e) Recovery of subloans from PFIs as per recover schedule; (f) Daily monitoring of onlending loans and subloans; and (g) Preparation of quarterly progress reports and project completion report. Table 3: Project Implementation Organizations: Roles and Responsibilities Project Implementation Organizations Management Roles and Responsibilities Executing agency Ministry of Finance–Finance Division Responsible for the overall project implementation and provides project implementation guidance Organize Steering Committee meetings Liaise with ADB for any project implementation issues Provide necessary implementation support to Bangladesh Bank Sign the subsidiary agreement with Bangladesh Bank and monitor compliance Project steering committee Provide overarching guidance and policy level support to the project Monitor and review project performance at an inter-agency level and address key policy-related issues Ensure collaboration and cooperation among agencies Implementing agency Bangladesh Bank Assess PFI eligibility in coordination with ADB Monitor PFIs‘ compliance with loan conditions and achievements of the project‘s design and monitoring framework targets Timely submit withdrawal applications to ADB Responsible for the allocation of the loan to the PFIs Responsible for the administration of the advance account, submission of the withdrawal applications, retention of supporting documents, and any reporting requirements Support the TA activities by providing timely support, guidance, inputs, access to information, and in-kind contributions Implement the use of the subproject screening checklist by the PFIs and the Gender Action Plan Submit to ADB quarterly progress reports within 30 days from the end of each quarter and respond to other information requests Ensure PFIs‘ submission of statement of utilization of funds, and submit audited statement of utilization of funds on behalf of PFIs Submit to ADB annual safeguards monitoring report Monitor PFIs‘ compliance with project agreement covenants Represent the project and participate in portfolio review meetings organized by the government and ADB Submit a project completion report within 6 months of project closure PFIs Assess credit worthiness of subborrowers and financial viability of subprojects Implement and ensure compliance with the selection criteria for subborrowers, subproject, and subloans; and criteria for the maximum loan size, and covenants in project agreement Ensure that total subloans (number) to small enterprises are issued to at least 20% women-led small enterprises under the credit line Ensure that the qualified subborrowers comply with ADB's Safeguard Policy Statement and applicable environmental, health and safety, and social laws and regulations of the borrowers Provide capacity building and business support activities to the targeted vulnerable groups and women‘s entrepreneurs on financial and legal literacy related to access to financial resources and services Manage budgeting, financial planning, accounting, and auditing of project-
7 related activities Submit to Bangladesh Bank annual Statements of Utilization of Funds in ADB template, incompliance with financial covenants ADB Responsible for overall coordination of the project Provide guidance to Bangladesh Bankregarding implementation of the project Monitor achievements of the project‘s targets established in the design and monitoring framework Conduct field reviews on implementation twice a year Oversee implementation of attached TA ADB = Asian Development Bank, PFI = participating financial institution, TA = technical assistance. Source:Asian Development Bank. 2. Key Persons Involved in Implementation Executing Agency Finance Division, Ministry of Finance Dr. Md. Khairuzzaman Mozumder Additional Secretary Tel. No.: +880 1711566958 E-mail: kzamanm@finance.gov.bd Financial Division, Ministry of Finance Bangladesh Secretariat Dhaka-1000, Bangladesh Implementing Agency Bangladesh Bank Mr. Md. Jaker Hossain General Manager Tel. No.: +880 1731509242 E-mail: mjaker.hossain@bb.org.bd SME & Special Programmes Department Dhaka-1000, Bangladesh Asian Development Bank Public Management, Financial Sector, and Trade Division South Asia Department Mr. Sabyasachi Mitra Director Tel No.: +63 2 8632 5514 E-mail: sabymitra@adb.org Mission Leader Mr. Dongdong Zhang Principal Financial Sector Specialist Tel. No.: +63 85512366 E-mail: dzhang@adb.org
8 3. Project Organization Structure IV. COSTS AND FINANCING 13. The government has requested a concessional loan of $150 million from ADB‘s ordinary capital resources to help finance the project. The loan will have a 25-year term, including a grace period of 5 years; an interest rate of 2.0% per year during the grace period and thereafter; and such other terms and conditions set forth in the draft loan and project agreements. 14. The government will relend the loan proceeds to Bangladesh Bank under a subsidiary loan agreement, denominated in local currency. The government will determine the relending rate and will bear the foreign exchange risk. Bangladesh Bank will onlend the funds to PFIs at an interest rate in line with the rates for other Bangladesh Bank programs supporting CMSMEs.1F 2 The loans from PFIs to eligible CMSEs will have a market-based lending rate that reflects the funding cost of the PFIs and the credit risk of the subborrowers that is determined by Bangladesh Bank and agreeable to ADB; and will have a maximum maturity of 5 years and a maximum loan size of Tk5.0 million.
2 Bangladesh Bank‘s CMSME support programs have interest rates of 2%–4%.
9 Table 4. Project Financing Plan Source Amount ($ million) Share of Total (%) Asian Development Bank (concessional loan) 150.0 100.0 TOTAL 150.0 100.0 a This is based on the assumption that CMSEs will contribute 20% of individual subproject cost in form of equity. Source: Asian Development Bank. A. Cost Estimates Preparation and Revisions 15. The cost estimates were prepared by the Government of Bangladesh in consultation with ADB. No cost revision is expected during project implementation. B. Detailed Cost Estimates by Expenditure Category Table 5. Cost Estimates by Expenditure Category Source Amount ($ million) Share of Total (%) Credit Line 150.0 100.0 TOTAL 150.0 100.0 Source: Asian Development Bank. C. Allocation and Withdrawal of Loan Proceeds 16. ADB loan (ADB to Bangladesh). Thegovernment will be the borrower. The ADB loan, through the MOF–FD, will onlend to Bangladesh Bank in local currency under a subsidiary loan agreement. government will bear the foreign exchange risks. 17. Relending (from Bangladesh Bank to participating financial institutions).Bangladesh Bank will relend the proceeds of the ADB loan to eligible PFIsfor making subloans to eligible subborrowers to finance eligible subprojects at prevailing rate for CMSE programs under a participation agreement. 2F 3 The relending will have a maturity of 2–5 years (generally matches the profiles of subloans) at an interest rate of prevailing bank lending rate determined by Bangladesh Bank and agreeable to ADB. 18. Eligibility criteria of partner finance institutions. PFIs participating in the project must be licensed by Bangladesh Bank or established under special act or regulation of the government. In addition, PFIs must meet the eligibility criteria laid out in Appendix 2. 19. Eligibility criteria of borrowers.Enterprises to be financed under the project shall belong to the three vulnerable groups—(i) youth, (ii) returning migrants, and (iii) rural entrepreneurs.3F4These groups should meet the eligibility criteria laid out in Appendix 3.
3 Eligibility criteria for participating financial institutions (PFIs), subprojects and subborrowers (accessible from the list of linked documents in Appendix 2. 4 Youth refers to individual between 18 and 45years old; returning migrants refers to individuals returned to the country since beginning of 2020; rural entrepreneurs refer to the entrepreneurs based outside of Dhaka and Chattogrammetropolitan areas.
10 20. Loan proceeds utilization. ADB loan proceeds will be used to finance eligible PFI‘s qualified CMSEs.4F5 Subloans will be for activities that will not trigger any involuntary resettlements nor have any adverse impact on tribes, minor races, ethnic sects, and communities. The maximum size for subloans under the credit line will be Tk5 million. The total cost of each subproject will be jointly financed with a subborrower equity contribution of 20%, and a contribution from the ADB loan of 80%. Subloans may be used for working capital or longterm investment and must be repaid with a maximum term of 5 years. Though the funds will prioritize cottage and micro enterprises,small enterprises outside of Dhaka and Chattagram metropolitan areas, may avail only up to $40 million of the loan proceeds. Subloans will only be provided to finance activities not listed in ADB‘s Prohibited Investment Activities List and will be subject to post-lending monitoring and review by ADB. D. Disbursement S-Curve 21. The disbursement schedule for the project period of 2022‒2025 is expected to be in annual amounts of $40 million, $50 million, $50 million, and $10 million.
5 Rural enterprises in this paper refer to enterprises located outside of Dhaka and Chattogram metropolitan area.
11 E. Fund Flow Diagram 22. The disbursement will be conducted through advance account procedure. V. FINANCIAL MANAGEMENT
6 ADB. 2009. Financial Due Diligence: A Methodology Note. Manila.
12 implementing agency. MOF-FD is experienced with working with donor programs including ADB‘s. The FMA found that Bangladesh Bank has experience in implementing ADB-assisted projects,namely: (i) the Small and Medium-Sized Enterprise Development Projectand (ii) Second Small and Medium-Sized Enterprise Development Project. 7Bangladesh Bank‘s project management and financial management capacities were further enhanced under these ADB projects and projects from other development partners. Bangladesh Bank has adequate financial management capacity to (i) provide reliable annual statement of utilization of funds and audit reports in a timely manner; (ii) design and implement effective mechanism to monitor program implementation by PFIs; and (iii) manage the advance account and the SOE procedures under ADB‘s disbursement procedures. However, Bangladesh Bank still needs to further strengthen its capacity and staff to meet the challenges of supporting vulnerable groups, disbursing funds efficiently, and delivering policies and strategies for financial inclusion. The attached TA will support the capacity development of PMU officials, strengthen Bangladesh Bank‘s information technology system, provide business support for the borrowers, and support policy development. 25. The FMA concluded that the financial management risk is moderate, primarily due to risks coming from (i) increasing outstanding loan levels due to deterioration in macroeconomic conditions in the aftermath of COVID-19, and (ii) capacity constraints in some of the participating financial institutions. Mitigation factors considered are Bangladesh Bank‘s strong financial management capacity, conservative approach and experience working with ADB and many other development partners in similar projects. 26. The financial management internal control and risk assessment examines the proposed project on two levels—inherent and control risks. Inherent risks consider risks that are inherent to financial institutions in Bangladesh projects while control risks consider risks that are unique to Bangladesh Bank and the subprojects (Table 6). Table 6: Financial Management Risk Assessment Risk Risk Assessment Risk Rating Risk-Mitigation Measures Inherent Risks
7 ADB. 2009. Report and Recommendation of the President to the Board of Directors: Proposed Loan to the People’s Republic of Bangladesh for the Second Small and Medium-sized Enterprise Development Project. Manila. and ADB. 2015. Report and Recommendation of the President to the Board of Directors: Proposed Loan and Administration of Technical Assistance Grant to the People’s Republic of Bangladesh for the Second Small and Medium-sized Enterprise Development Project. Manila.
13 Risk Risk Assessment Risk Rating Risk-Mitigation Measures financial system. proper financial management in the financial sector. A number of initiatives have been taken by Bangladesh Bank to ensure good financial management with particular focus on the accountability and transparency of management in the financial sector. The legislative framework related to the financial industry has been revised with a view toward helping improve governance and strengthening discipline in the financial system. Automation of the financial sector was a major step for the central bank in ensuring financial discipline. Bangladesh Bank has introduced the Integrated Supervision System and the Foreign Exchange Monitoring Dashboard. In addition, the Integrated Export Monitoring System has put in place with the National Board of Revenue to intensify financial sector supervision. However, governance is an issue needing continuous scrutiny and is addressed regularly and whenever required. Increasing outstanding loan levels due to coronavirus disease (COVID-19) pandemic. S Bangladesh Bank ensured ample liquidity to the banking sector, implemented temporary moratorium on payments and strengthened monitoring of the banking sector. Overall Inherent Risk S Control Risks
14 Risk Risk Assessment Risk Rating Risk-Mitigation Measures exposure and controls. Committee, which comprised four independent members and an adviser, who joins the meeting on call, as and when required. Bangladesh Bank‘s Internal Audit Department carries out audits of projects funded by development partners such as ADB, Japan International Cooperation Agency andthe World Bank at least once in year. 5. External Audit The external audit of Bangladesh Bank must be concluded within 6 months by independent audit firm in accordance with IAS/IFRS. Controller General of Accounts conduct annual audit of foreign aided projects. There is also project performance audit from Implementation Monitoring and Evaluation Division. L The Foreign Aided Projects Audit Directorate (FAPAD) of the Office of the Controller and Auditor General will conduct an audit of the project‘s annual financial statements within 6 months from the end of the fiscal year. The Project Director will be responsible for audit follow-up and for taking remedial actions. Meetings to resolve audit objections must be held within 3 months of the receipt of the external audit report from FAPAD. Recent audits have not identified any material concerns. 6. Staffing In general, Bangladesh Bank has adequate and experienced staff with previous experience in ADB projects. M Bangladesh Bank shall ensure that the required financial management staff will be in place once the project becomes effective. In case of staff turnover, Bangladesh Bank will ensure placement of new staff from Bangladesh Bank so that financial management activities continue without interruption. 7. Management Information System (MIS) Bangladesh Bank will be responsible for consolidating financial information, maintaining supporting papers, and preparing financial statements. The MIS Reports willinclude:(i) financial statements (sources and uses of funds, uses of funds by project activity, and the special account reconciliation statement); (ii) MIS reports will be submitted to ADB nolater than 45 days after the end of each calendar quarter. M Bangladesh Bank will prepare the project‘s annual statement of utilization of funds electronically based on extracts of integrated information system (IIS) data. Bangladesh Bank needs to develop MIS system to capture project information and generate reports that are required to be submitted to ADB during the project. 8. Capacity of PFIs Limited financial management capacity of PFIs. S Karmasangsthan Bank (KB), the expected PFI under this project is a specialized bank. Capacity needs to be developed specially for ALM and ESMS areas to manage credit program of this project efficiently, as well as implementation of core banking system and hiring of staff at vacant positions. KB is not familiar with the developing partners reporting framework. Extensive training will be required to develop financial management capacity of KB. Overall Control Risk M Overall Risk M 27. Bangladesh Bankhas agreed to implement an action plan as key measures to address the deficiencies.The financial management action plan is provided in Table 7. Table 7: Financial Management Action Plan for Bangladesh Bank
15 Risk Area Agreed Actions Responsibility Agreed Timeline Training of Bangladesh Bank (Bangladesh Bank) and participating financial institution (PFI)staff on Asian Development Bank (ADB) financial management requirements Provide training to Bangladesh Bank project finance and accounting staff in ADB disbursement and accounting policies and procedures ADB Within 6 months of loan effectiveness Financial reporting Timely submission of audited statement of utilization of funds and resolution of audit findings to be ensured. Bangladesh Bank Within 6 months after fiscal year end. Quarterly progress reports Submission of quarterly progress reports with financial progress and disbursement reports to ADB Bangladesh Bank Within 45 days of end of each quarter Monitoring of PFIs Bangladesh Bank should follow eligibility criteria for PFIs throughout the project life. Bangladesh Bank should require PFIs to follow loan provisioning requirements against the outstanding loan amounts. Bangladesh Bank/PFIs Throughout project lifecycle Information systems Active use of both ADB systems Loan Financial Information and Services and Client Portal for Disbursements to reconcile project accounts and ADB disbursement records and keep track of advances, replenishments, and liquidations to the advance account on a quarterly basis. Bangladesh Bank/PFIs By loan effectiveness of the project and continue throughout project life. Sources: Asian Development Bank and Bangladesh Bank. 28. Financial performance assessment was conducted for the four potential PFIs. Three of those—BRAC Bank, IDLC Finance Limited, and Bank Asia were the PFIs in ADB programs including the Small and Medium-Sized Enterprise Development Projectand Second Small and Medium-Sized Enterprise Development Project;and have solid record in executing these programs. Institutional assessment of PFIs will be carried out by Bangladesh Bank before formal selection to ensure that the PFIs have capacity to account, report, and audit these funds. 29. Karmasangsthan Bank is the only PFI that (i) has not participated in any ADB program and (ii) is a non-scheduled bank. Despite of its good operational and financial performance and its leading role in supporting financial inclusion, the FMA has revealed certain areas of improvement and Karmasangsthan Bank has agreed take needed steps to strengthen its financial management. Table 8: Financial Management Action Plan for Karmasangsthan Bank Risk Area Agreed Actions Responsibility Agreed Timeline Implementation of core banking system Implementation of CBS in all branches of KB with live data entries and processing. Integration of accounting software with its core banking system and update of accounting manual. KB December 2022 Risk management policies and procedures Develop, obtain Board/Bangladesh Bank approvals, and implement the following policies and procedures: Anti-Money Laundering Policy Environmental and Social Risk Management Policy KB July 2021
16 Investment Policy Enhancements in internal audit function Change of reporting line of head of internal audit to deputy managing director and audit committee. Update of internal audit manual. KB March 2022 Implementation of IT policy Ensure full implementation of IT policy approved by the board in June 2020. KB March 2022 Staff recruitment and training KB shall expedite recruitment process to fulfill the requirement that was designed in organogram. Following steps will be undertaken: Complete hiring of 200 officers Recruit professional accountant (CA/CMA/CPA) in GM finance position KB 31 December 2022 Business plan Develop comprehensive business plan and obtain approval of the Board/MOF KB June 2022 Project financial reporting requirements Submit annual audited statement of utilization of funds to Bangladesh Bank. Submit annual audited financial statements of KB to Bangladesh Bank. Submit quarterly progress reports to Bangladesh Bank on the agreed format. KB Within 6 months of end of each FY Within 1 month of approval Within 45 days of end of each quarter CA = Chartered Accountant, CBS = core banking solutions, CMA = Certified Management Accountant, CPA = Certified Public Accountant, FY = fiscal year, GM = General Manager, IT = information technology, KB = Karmasangsthan Bank, MOF = Ministry of Finance Sources: Asian Development Bank, Bangladesh Bank, and Karmasangsthan Bank. 2. Disbursement
8 ADB. 2017.Loan Disbursement Handbook 2017.Manila. 9 Estimate of Expenditure sheet is available in Appendix 8A of ADB‘s Loan Disbursement Handbook (2017, as amended from time to time).
17 Disbursement Handbook(2017, as amended from time to time) when liquidating or replenishing the advance account. 33. Statementofexpenditure procedure.9F 10 The SOE procedure may be used for reimbursement of eligible expenditures or liquidation of advances to the advance account. Supporting documents and records for the expenditures claimed under the SOE should be maintained and made readily available for review by ADB's disbursement and review missions, upon ADB's request for submission of supporting documents on a sampling basis, and for independent audit. 34. Before the submission of the first withdrawal application, the borrower should submit to ADB sufficient evidence of the authority of the person(s) who will sign the withdrawal applications on behalf of the government, together with the authenticated specimen signatures of each authorized person.The minimum value per withdrawal application is stipulated in the Loan Disbursement Handbook (2017, as amended from time to time). Individual payments below such amount should be paid (i) by Bangladesh Bankand subsequently claimed to ADB through reimbursement, or (ii) through the advance fund procedure, unless otherwise accepted by ADB. The borrower should ensure sufficient loan demands before requesting disbursements.Use of ADB‘s Client Portal for Disbursementssystem is required for submission of withdrawal applications to ADB.10F 11 35. The funds repaid by the PFIs will be onlent again to the eligible PFIs following the same process and requirements during the project implementation period. After the end of the project period, the fund will be utilized by Bangladesh Bank for future lending to the cottage, micro and small enterprisesaccording to the terms and conditions laid down in the Subsidiary Loan Agreement. A special revolving funds account will be established for this purpose withinBangladesh Bank. 3. Accounting 36. Bangladesh Bankwill maintain, or cause to be maintained, separate books and records by funding source for all expenditures incurred on the project following accounting and financial management procedures acceptable to ADB. 37. The PFIs will also maintain separate books and accounts relating to all subloans financed out of ADB‘s loan proceeds relating to this project. The statement of utilization of funds will be prepared using appropriate accounting principles and reporting framework. 38. Based on the statement of utilization of funds by each PFI, Bangladesh Bank shall prepare a consolidated set of project financial statements, i.e., a consolidated statement of utilization of funds for all PFIs, indicating the consolidated sources and uses of funds under the project. 4. Auditing and Public Disclosure 39. MOF–FD and Bangladesh Bankwill cause the detailed consolidated statement of
10 SOE forms are available in Appendix 7B and 7D of ADB‘s Loan Disbursement Handbook (2017, as amended fromtime to time). 11The CPD facilitates online submission of WA to ADB, resulting in faster disbursement. The forms to be completed by the Borrower are available online at https://www.adb.org/documents/client-portal-disbursements-guide
18 utilization of the funds, to be audited in accordance with international standards on auditing and with the Government's audit regulations by Foreign Aided Projects Audit Directorate (FAPAD). The audited consolidated statement of utilization of funds, together with the auditor‘s opinion will be presented in the English language to ADB within 6 months from the end of the fiscal year by Bangladesh Bank. 40. Bangladesh Bank and each of the PFI shall (i) maintain, separate accounts and records for the Project; (ii) prepare an annual statement of utilization of funds (indicating sources of funds and disbursements to PFIs/MSMEs) in accordance with accounting principles acceptable to ADB; (iii) have the statements referred to in subsection (iv) audited annually by Foreign Aided Projects Audit Directorate (FAPAD); (v) as part of each such audit, the respective auditors will prepare a report, which includes the auditors‘ opinions on the statements referred to in subsection and the use of the Loan proceeds, and a management letter (which sets out the deficiencies in the internal control of the Project that were identified in the course of the audit, if any); and (vi) furnish to ADB, no later than 6 months after the close of the fiscal year to which they relate, copies of such audited statements, audit reports and management letters, all in the English language, and such other information concerning these documents and the audit thereof as ADB shall from time to time reasonably request. Bangladesh Bank shall ensure that the PFIs address in a timely manner key audit issues raised by the auditors as part of the audits carried out on their annual statements of utilization of funds, and Bangladesh Bank shall inform ADB on a quarterly basis on the progress being made by PFIs in addressing such audit issues. 41. Bangladesh Bank will also cause its entity-level financial statements to be audited in accordance with international standards on auditing and with the Government's audit regulations by an independent auditor. The audited entity-level financial statements, together with the auditors‘ report and management letter, will be submitted in the English language to ADB within 1 month after their approval by the competent authority. 42. Compliance with financial reporting and auditing requirements will be monitored by review missions and during normal program supervision, and followed up regularly with all concerned, including the external auditor. 43. The government, MOF-FD, and Bangladesh Bank have been made aware of ADB‘s approach to delayed submission, and the requirements for satisfactory and acceptable quality of the audited financial statements. 11F 12 ADB reserves the right to require a change in the auditor (in a manner consistent with the constitution of the borrower), or for additional support to be provided to the auditor, if the audits required are not conducted in a manner satisfactory to ADB, or if the audits are substantially delayed. ADB reserves the right to verify the project's financial accounts to confirm that the share of ADB‘s financing is used in accordance with ADB‘s policies
12 ADB‘s approach and procedures regarding delayed submission of audited statement of utilization of funds and entity-level financial statements: (i) When these documents are not received by the due date, ADB will write to the executing agency advising that (a) the audit documents are overdue; and (b) if they are not received within the next 6 months, requests for new contract awards and disbursement such as new replenishment of advance accounts, processing of new reimbursement, and issuance of new commitment letters will not be processed. (ii) When these documentsare not received within 6 months after the due date, ADB will withhold processing of requests for new contract awards and disbursement such as new replenishment of advance accounts, processing of new reimbursement, and issuance of new commitment letters. ADB will (a) inform the executing agency of ADB‘s actions; and (b) advise that the loan may be suspended if the audit documents are not received within the next 6 months. (iii) When these documentsare not received within 12 months after the due date, ADB may suspend the loan.
19 and procedures. 44. Public disclosure of the consolidated statement of utilization of funds, including the auditor‘sopinion, will be guided by ADB‘s Access to Information Policy (2018). 12F 13 After the review, ADB will disclose theseno later than 14 days of ADB‘s confirmation of their acceptability by posting them on ADB‘s website. The management letter, additional auditor‘s opinions, and audited entity financial statements will not be disclosed.13F 14 VI. PROCUREMENT AND CONSULTING SERVICES A. Advance Contracting and Retroactive Financing 45. There will be no advance contracting nor retroactive financing under the project. B. Procurement of Goods, Works, and Consulting Services 46. Procurement and consulting services to be financed by the proposed attached TA by following ADB Procurement Policy (2017, as amended from time to time) and Procurement Regulations for ADB Borrowers (2017, as amended from time to time). 47. The attached TA of $900,000 from ADB‘s Corporate Pool for COVID-19 will help Bangladesh Bank to strengthen the banking sector‘s support for employment creation. The TA will also aim to strengthen PFIs and potential PFIs that are important for supporting employment creation, through institutional capacity development and promotion of best practices in CMSE banking. The TA will require a total of 10 person-months inputs from 2 international experts and 58 person-months inputs from 9 national experts. ADB will recruit a firm for two international consultants and nine national consultants using the quality- and cost-based selection method with a quality–cost ratio of 90:10 because of the highly-specialized expertise needed.The terms of reference for the consultants are in Appendix 2 of the TA. VII. SAFEGUARDS 48. In accordance with ADB Safeguards Policy Statement (2009), the project is classified as FI treated as C for impacts on the environment, involuntary resettlement, and indigenous peoples. The project is expected to have minimal environmental impact as the subloans to CMSEs will be mainly for light manufacturing, trade, and service sectors. Similarly, the subloans will be for activities that will not trigger any involuntary resettlements nor have any adverse impact on indigenous people. 49. To ensure that all subloans are compliant with ADB requirements, Bangladesh Bank has developed screening checklists for environmental, involuntary resettlement and indigenous people impact, which will be used by PFIs to screen each subloan. Bangladesh Bank will conduct review and confirmation of these documents and provide monitoring, annual reporting, and grievance redressing mechanisms. ADB will ensure that the subproject screening checklist is operational in accordance with ADB requirements before any disbursement of funds from the ADB loan account is made. To ensure that subprojects are properly screened and categorized,
13 ADB. 2018. Access to Information Policy. Manila. 14 This type of information would generally fall under public communications policy exceptions to disclosure. ADB. 2011. Public Communications Policy. Paragraph 97(iv) and/or 97(v).
20 ADBthrough a TA, will provide capacity building workshops to PFI staff. Each PFI will be required to designate at least one staff member to be responsible for implementation of its subproject screening checklist. 50. ADB shall review and monitor compliance with the environmental and social safeguard requirements of the project. In relation to this, Bangladesh Bank will assign a staff who will be trained to develop and monitor the subproject screening mechanism and checklist to ensure that ADB‘s safeguard requirements will be adhered to. The assigned staff from Bangladesh Bank will, in turn, train staff from each of the PFIs in implementing and monitoring the screening mechanism through the screening checklist. Each PFI will provide its status of compliance with ADB‘s safeguard requirements through an annual monitoring report, which Bangladesh Bank will compile to provide to ADB. 51. Prohibited investment activities. Pursuant to ADB‘s Safeguard Policy Statement (2009),ADB funds may not be applied to the activities described on the ADB Prohibited Investment Activities List set forth at Appendix 5 of the Safeguard Policy Statement (2009). All financial institutions will ensure that their investments are in compliance with applicable national laws and regulations and will apply the prohibited investment activities list (Appendix 5) to subprojects financed by ADB. VIII. GENDER AND SOCIAL DIMENSIONS 52. Potential gender and social impacts were reviewed. A gender assessment is reflected in the project documents and is an integral part of the project design which is categorized thematically as effective gender mainstreaming. The program addresses women‘s empowerment by narrowing gender disparities through access to financial resources and opportunities. The project targets aminimum of 20% for women entrepreneurs which will promote qualified women entrepreneurs by ensuring access to finance. Furthermore, the associated TA subproject will build women entrepreneurs‘ capacity to access finance resources. 53. A gender action plan(GAP) for this project has been developed (Table 8). Its implementation will be monitored regularly and ADB will receive an update on the GAP implementation at least semiannually.A gender specialist (8 person-months, intermittent) will be engaged to support the implementation and monitoring and reporting on the GAP. Table 8:Gender Action Plan Activities Indicators &Targets Responsibility Time Output 1: Financial support to enterprises started or operated by migrants, rural enterprises, and youth from the formal banking sector increased. 1.1 Support 30,000 returning migrants, unemployed youth, and rural micro enterprise owners with financing 1.1.1 20% women supported with financing (June 2020 baseline: 500) Bangladesh Bank By June 2025 1.2 Enhance financial utilization skills of returning migrants, unemployed youth, and rural micro enterprise owners 1.2.1 Needs assessment conducted covering present job market and skills for both local and foreign employment opportunities for identified groups. 1.2.2 20% women who received financial support reported to TA Consultants By June 2025 TA Consultants By June 2025
21 Activities Indicators &Targets Responsibility Time have increased entrepreneurial skills. Output 2: Capacity of employment-supporting financial institutions strengthened. 2.1 Support at least two financial institutions in the enhancement of policy framework, and risk management area (including gender responsive corporate strategy, credit guidelines, risk management, and anti-money laundering policies). 2.1.1 Gender-responsive corporate strategy to support targeted (unemployed youth, returning migrants, and rural entrepreneurs) population with gender action plan developed and submitted to Bangladesh Bank boarda 2.1.2 Incorporate gender-responsive features in credit guidelines and risk management policiesb Bangladesh Bank, TA Consultants By December 2023 2.2 Raise awareness in best practices in supporting cottage, micro enterprises for at least 100 staff of PFIsenterprises 2.2.1 40% women staff report increased knowledge on best practices in supporting cottage, microenterprises. Bangladesh Bank, TA Consultants By June 2025 2.3 Build the capacity of the implementing agency on governance, risk management and financial management capacities. 2.3.1 At least 80% of all available and relevant women staff of two PFIs received capacity building training on governance, risk management, and financial management capacities Bangladesh Bank, TA Consultants By June 2025 Output 3: Action plan for promoting formal banking sector support for cottage, micro, and smallenterprises developed. 3.1 Develop a genderresponsive action plan for enhancing access to finance through banking sector. 3.1.1 A gender-responsive action plan (with enhanced credit guarantee schemes to broaden and strengthen reach to women micro entrepreneurs) developed and submitted to Bangladesh Bank for approval.c Bangladesh Bank/ADB By December 2024 3.2 Enhance knowledge on accessing financial services for at least 400 returning migrants 3.2.1 At least 150 women report increased knowledge Bangladesh Bank/ADB/PFI By December 2024 3.3 Establish an internetbased training platform for small enterprises 3.3.1. A user-friendly internet-based training platform developed with sex-disaggregated information Bangladesh Bank/ADB By December 2024 3.4 Provide incubation services to women entrepreneurs. 3.4.1 At least 200 women micro entrepreneurs supported Bangladesh Bank/ADB By December 2024 PFI = participating financial institution, TA = technical assistance. a Includes but is not limited to (i) assessment of barriers in banking to ensure women‘s rights to financial services and ensure that banks are financing sectors where the majority of women work; (ii) review of financial products to identify appropriate products that economically empower women; (iii) review and establish sex-disaggregated management information system for evaluation of financial services for women; and (iv) document select innovations in processes, mechanisms, and products for vulnerability reduction (e.g. pensions and insurance) and for women‘s economic empowerment.
22 b Includes but is not limited to guidelines that consider women‘s specific needs for loans and lack of collateral and has affirmative actions to ensure women receive loans. Risk management policies will be gender-responsive through assessments to ensure women‘s specific risks are accounted for. c This plan will include activities to remove barriers in banking to ensure women‘s access to financial services and ensure that banks are financing sectors and providing financial products where the majority of women work. It will also include specific interventions to establish sex-disaggregated management information system for evaluation of financial services for women; and document select innovations in processes, mechanisms, and products for vulnerability reduction (e.g., pensions, insurance) and for women‘s economic empowerment. IX. PERFORMANCE MONITORING, EVALUATION, REPORTING, AND COMMUNICATION A. Project Design and Monitoring Framework Impact(s) the Project is Aligned with Rapid recovery from COVID-19 to restore employment, income and economic activities (Eighth Five-Year Plan, July 2020–June 2025)a Results Chain Performance Indicators Data Sources and Reporting Mechanisms Risks and Critical Assumptions Outcome Adverse economic effects of COVID-19 on migrants, youth, and rural entrepreneurs mitigated By December 2025, at least 45,000 employment opportunities created among the beneficiaries of the program. (2020 baseline: 0) Business registry or project report using sample-based survey R: Further economic downturn beyond projected levels exacerbates effective operations of banks and/or operations of the beneficiaries. Outputs
23 Results Chain Performance Indicators Data Sources and Reporting Mechanisms Risks and Critical Assumptions 3. Action plan for promoting formal banking sector support for cottage, micro, and smallenterprises developed 3a. By December 2024, a genderresponsive action plan for enhancing access to finance through the banking sector developed by Bangladesh Bank (2021 baseline: not developed) 3a-3d. TA reports and final report 3b. By December 2024, at least 400 returning migrants (including at least 150 women) with increased knowledge in accessing financial services. (2021 baseline: 0) 3c. By December 2023, internet-based training platform for cottage, micro, and small enterprises is established (2021 baseline: not applicable) 3d. By December 2024, at least 200 women entrepreneurs are supported by incubation services (2021 baseline: 0) Key Activities with Milestones
24 a Government of the People‘s Republic of Bangladesh, Bangladesh Planning Commission. 2020. Eighth Five-Year Plan, July 2020–June 2025: Promoting Prosperity and Fostering Inclusiveness. Dhaka. B. Monitoring 54. Project performance monitoring.To ensure that the project is efficiently managed andits benefits are maximized, Bangladesh Bank will ensure that a project performance management system (PPMS) satisfactory to ADB is established and implemented. The key performance indicators and assumptions in the design and monitoring framework will be the basis for the system. Bangladesh Bank will have established the baseline for each of these indicators, and such information will be made available to review missions and to the Government for future impact assessment surveys. The scope of the system, quantity and quality of data, and frequency of collection will be guided by the need for feedback on implementation. Bangladesh Bank will submit annual monitoring and evaluation reports to ADB for the duration of the project. The PPMS will monitor and evaluate the project information and data to ensure that planned interventions achieve the desired result under each project component, including key impact and outcome indicators and associated assumptions with corresponding target dates. PPMS activities will be conducted periodically to gather information from multiple sources to determine whether the input deliveries for implementing project activities have rendered expected benefits to the intended beneficiaries. The PPMS will aim to detect any deficiencies and discrepancies between the plan and the execution of the project in using the resources efficiently so that timely corrections can be made to adjust the design of the project and thus improve its benefits, outcomes, and impact. The PFIs will undertake periodic subproject performance reviews to evaluate the scope, implementation arrangement, and progress and achievements of objectives of the project. 55. Compliance monitoring.PFIs‘ compliance with the covenants will be monitored by Bangladesh Bankbased on the PFIs' monthly reports, annual financial statements, and audited project account. PFIs will be required to prepare and submit an annual report to Bangladesh Bank to confirm compliance with the stated requirements. 56. Safeguards monitoring.Bangladesh Bank will monitor the screening process carried out by the PFIs as part of the fund application process. ADB will receive annual reports on safeguard compliances. 57. Gender and socialdimensions monitoring.GAP implementation status will be reported semiannually. PFIs‘ monthly report will have data pertaining to the social status and will be sex disaggregated. C. Evaluation 58. To ensure responsive and timely implementation, there will be regular review missions in accordance with the project implementation schedule. There will be regular interaction between the executing agency, Bangladesh Bank, and ADB. Annual performance review will be conducted by the government, Bangladesh Bank, and ADB. In addition, a comprehensive midterm review will be undertaken by the government, Bangladesh Bank, and ADB about 24 months after the project‘s effectiveness that will (i) evaluate the scope, design, and implementation arrangements; (ii) assess implementation performance against project indicators; (iii) review and establish compliance with loan covenants; and (iv) identify problems and constraints and, if necessary, recommend changes in the design or implementation arrangements.
25 59. Within 6 months after the loan closing date, the MOF-FD and Bangladesh Bank will submit a project completion report to ADB in a form acceptable to ADB. Subsequently, ADB will field a mission to finalize the project completion report. D. Reporting 60. Bangladesh Bankwill provide ADB with (i) quarterly progress reports in a formatconsistent with ADB's project performance reporting system; (ii) consolidated annual reports including (a) progress achieved by output as measured through the indicator's performance targets, (b) key implementation issues and solutions, (c) updated procurement plan, and (d) updated implementation plan for the next 12 months; and (iii) a project completion report within 6 months of physical completion of the project. To ensure that projects will continue to be both viable and sustainable, project accounts and the executing agency audited financial statement together with the associated auditor's report, should be adequately reviewed. E. Stakeholder Communication Strategy 61. ADB will communicate the information about this project and the outcome of this project through its publications, presentations and on its website. ADB will also communicate with the project‗s internal stakeholders (MOF-FD and Bangladesh Bank) through written documents and official meetings, including SC meetings. Subborrowers would provide information at the time of subloan application and would have personal follow-up interactions with the PFIs. PFIs would communicate with Bangladesh Bankon the status of financial intermediary loans through submission of quarterly progress reports to the PMU at Bangladesh Bank, who, in turn, will forward the same to ADB. PFIs will also communicate to their staff through training programs, sensitization programs, and workshops to subborrowers through public campaigns. Internet based outreach and training will be piloted in this program. 62. The key communication objectives of the project are: (i) to inform potential and existing entrepreneurs and in particular women entrepreneurs of the opportunities that the project offers including capacity building activities and increased access to credit resources; (ii) to empower potential borrowers and women entrepreneurs and encourage them to enter into business ventures; (iii) to gather feedbacks on the project implementation and identify areas of improvement; (iv) to strengthen official network for cottage, micro and small enterprises and create a learning environment through sharing of experiences among the PFIs; and (v) to create public support for the project. X. ANTICORRUPTION POLICY 63. ADB reserves the right to investigate, directly or through its agents, any violations of the Anticorruption Policy relating to the project.14F 15 All contracts financed by ADB shall include provisions specifying the right of ADB to audit and examine the records and accounts of the executing agency and all project contractors, suppliers, consultants, and other service
15 Anticorruption Policy: https://www.adb.org/documents/anticorruption-policy.
26 providers. Individuals and/or entities on ADB‘s anticorruption debarment list are ineligible to participate in ADB-financed activity and may not be awarded any contracts under the project.15F 16 64. To support these efforts, relevant provisions are included in the loan agreement of the project. 65. ADB‘s Office of Anticorruption and Integrity is the point of contact to report allegations of fraud and corruption among ADB-financed projects or its staff. 16F 17 Anyone coming across evidence of corruption associated with the project may contact below by telephone, facsimile, email, or by mail: Office of Anticorruption and Integrity Asian Development Bank 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines Telephone: +63 2 632 5004 Fax: +63 2 636 2152 E-mail: integrity@adb.org or anticorruption@adb.org XI. ACCOUNTABILITY MECHANISM 66. People who are, or may in the future be, adversely affected by the project may submit complaints to ADB‘s Accountability Mechanism. The Accountability Mechanism provides an independent forum and process whereby people adversely affected by ADB-assisted projects can voice, and seek a resolution of their problems, as well as report alleged violations of ADB‘s operational policies and procedures. Before submitting a complaint to the Accountability Mechanism, affected people should make an effort in good faithto solve their problems by working with the concerned ADB operations department. Only after doing that, and if they are still dissatisfied, should they approach the Accountability Mechanism.F 18 XII. RECORD OF CHANGES TO THE PROJECT ADMINISTRATION MANUAL 67. This document is subject to revisions based on changing conditions on the ground, and all changes will be initiated by the government request and approved by ADB. All revisions and/or updates during the course of implementation should be retained in this section to provide a chronological history of changesto implemented arrangements recorded in the PAM, including revision to contract awards and disbursement s-curves. Date PAM approved by ADB First Revision
16 ADB's Office of Anticorruption and Integrity website: https://www.adb.org/integrity. 17 ADB's Integrity Office website is available at http://www.adb.org/integrity/unit.asp. 18 Accountability Mechanism. http://www.adb.org/Accountability-Mechanism/default.asp.
Appendix 1 27 ANNUAL ENVIRONMENTAL AND SOCIAL MONITORING REPORT A. Scope of Participating Financial Institutions’ Environmental Monitoring of Subborrowers
28 Appendix 1 B. Scope of Bangladesh Bank’s Environmental Monitoring of PFIs 3. Bangladesh Bank‘s monitoring of PFIs will focus on the following: (i) Appointment of trained staff to implement the safeguards screening checklist; (ii) Appropriate implementation of safeguards screening checklist for subprojects; (iii) Compliance with relevant selection criteria for qualified subprojects as stipulated in the loan agreement between ADB and Bangladesh Bank; (iv) Bad subloans resulting from environmental and social problems; (v) Environmental opportunities or effects associated with subloans; (vi) Subloans rejected on environmental, social, health, and safety grounds; (vii) Operationalization of environmental and social safeguards management system, and availability of qualified staff; (viii) Management of environmental risks consistent with the Environmental Risk Management Guidelines for Banks and Financial Institutions in Bangladesh issued by Bangladesh Bank in 2011 or its update; and (ix) Difficulties and constraints related to the implementation of the safeguard screening checklist or environmental safeguards management system. C. Scope of ADB monitoring of Bangladesh Bank (i) Review and approve subproject safeguard screening checklist in consultation with ADB prior to loan disbursement to any PFI; (ii) Training of PFI staff on the use of subproject safeguard screening checklist and monitoring of subborrowers; (iii) Compliance with relevant PFI selection criteria; (iv) Compliance with safeguard-related provision on conditions for disbursement to each PFI; and (v) Compliance with other relevant loan covenants. D. Scope of Monitoring Report of Bangladesh Bank to ADB 4. Bangladesh Bank‘s annual monitoring report to ADB will cover points outlined in sections A, B, and C above.
Appendix 2 29 PARTICIPATING FINANCIAL INSTITUTION SELECTION CRITERIA
1 ADB. 2003. Bank Policy Financial Intermediation Loans. Operations Manual. OM D6. Manila. 2 Target bank means a state-owned bank or financial institution owned by the government, or a bank or financial institution established under a special act or regulation, with the objective of employment creation for youth, returning migrants or rural entrepreneurs. 3 For banks established by the government with the objective of employment creation among the youth, returning migrants, and rural entrepreneurs, MOF may provide guarantee on the repayment of the loans to Bangladesh Bank in lieu of meeting this criterion. 4 Non-performing loan ratio is the ratio of gross non-performing loan over all outstanding loan amount.
30 Appendix 2 remedy any default of eligibility criteria within 6 months of default and in any event, within the disbursement period of the Employment Project. 5. Each PFI must comply with the environmental and social safeguards management arrangement of the project in form of a subproject screening checklist designed to identify, remedy, and monitor subprojects‘ compliance according to ADB‘s Safeguard Policy Statement (2009).
Appendix 3 31 SUBLOAN AND SUBBORROWER CRITERIA
1 PFIs will determine Covid-19 affected small entrepreneurs by using their banking experience and prudence. 2 ADB project officer‘s written concurrence will be needed.
32 Appendix 4 QUARTERLY/ANNUAL MONITORING REPORT as of Q1 2022 Bangladesh: Supporting Post-COVID-19 Small-Scale Employment Creation Project Loan Agreement No: [xxxx] A. Introduction and Basic Data: ADB Loan Number: Xxxx Project Title: Supporting Post-COVID-19 Small-Scale Employment Creation Project Loan Allocations: ADB ($million):150 Important dates: Dates of Approval (dd-mm-yyyy): Date of Signing (dd-mm-yyyy): Date of Effectiveness (dd-mm-yyyy): Executing Agency: Implementing Agency: Original Loan Closing Date: 30 June 2025 Revised Loan Closing Date: N/A B. Disbursement Quarterly Disbursement Progress (BDT million with two decimal points) Quarters ADB Fund Government/Bangladesh Bank PFIs SubBorrowers’ Equity Total Target: Quarter 1, Year 1 Quarter 2, Year 1 Quarter 3, Year 1 Quarter 4, Year 1 . . . Total Target Actual: Quarter 1, Year 1 - - - - PFIs = participating financial institutions. Discussion on Deviations and Remedial Measures Reasons for deviation: Any reasons for deviations of actual and target disbursements will be discussed in detail. Remedial measures for addressing deviations: The actions that would be taken to address the deviations should be discussed here.
Appendix 4 33 C. Subloan Analysis Parameters Year 1 (YTD) Year 2 (YTD) Year 3 (YTD) Year 4 (YTD) Year 5 (YTD) Total Type of Loan: Number Working Capital Loan (=< 1 year) Loan for Capital Investment (1–5 years) Type of Loan: BDT million Working Capital Loan (=< 1 year) Loan for Capital Investment (1–5 years) Maturity Analysis: Number Short Term Loan (=< 1 year) Medium Term Loan (1–3 years) Long Term Loan (3–5 years) Maturity Analysis: (BDT million) Short Term Loan Medium Term Loan Long Term Loan Subloans by PFI: (number) Banks FIs Subloans by PFI: (BDT million) Banks FIs Gender Analysis: (number) Male-owned Female-owned Gender: (BDT million) Male-owned Female-owned Business Classification:(number) Manufacturing Service Trade Business Classification: (BDT million) Manufacturing Service Trade Type of SME:(BDT million)a Cottage
34 Appendix 4 Parameters Year 1 (YTD) Year 2 (YTD) Year 3 (YTD) Year 4 (YTD) Year 5 (YTD) Total Micro Small Type of SME:(Number) Cottage Micro Small Employment: (Headcount) Employment before Refinancing Additional employment created Subloan Type: (Number) First Time Borrower Old Borrower Loan Performance: (BDT million) Data Not Available Unclassified Overdue Special Mention Bad Loss Loan Performance: (Number)b Unclassified Overdue Special Mention Bad Loss Environmental category: (Number) Red Orange Green Subloan Size: (Number) <BDT 500,000 BDT 500,000 - BDT 2,000,000 BDT 2,000,000 - BDT 5,000,000 Subloan Size: (BDT) <BDT 500,000 BDT 500,000 - BDT 2,000,000 BDT 2,000,000 - BDT 5,000,000 a As per definition of the Government/Ministry of Industries/Bangladesh Bank. b As per Bangladesh Bank Guideline.
Appendix 4 35 D. Compliance with Covenants Key Operational Covenants Parameters Target Actual (Cumulative BDT million) Comments with reasons for any deviation and remedial action Compliance with Loan Agreement Covenants will be inputted as stipulated in Loan Agreements (Article IV–Particular Covenants, Schedule 3–Execution of Project; Financial Matters) Covenants Reference in Loan Agreement Timeline Complied / Being Complied with / Not Complied Reasons for non-compliance and remedial action taken or to be taken Compliance with Project Agreement Covenants will be inputted as stipulated in Project Agreement (Article IV–Particular Covenants) Covenants Reference in Project Agreement Timeline Complied / Being Complied with / Not Complied. Reasons for non-compliance and remedial action taken or to be taken Compliance with Audit Report of Foreign-Aided Project Audit Directorate (FAPAD) FY FAPAD Observations Response from the Implementing Agency and timeline for resolution 2021–2022 2022–2023
36 Appendix 4 E. Progress with Parameters of Design and Monitoring Framework (DMF) Performance Indicators with Targets and Baselines Achievement to date with data source and projection of compliance by timeline; Any reason for not achieving the target. Output 1: Output 2: Output 3: F. Continuing Eligibility of PFIs Name of PFIs Bank/NBFI Qualified or not Reasons if not qualified Discussion on performance of PFIs: Provide a discussion on PFIs, who are the lowest performers in terms of disbursement, interest rate and non-performing assets, and the action plan for improving their performance. Attachment: Annual report of Participating Financial Institution Summary of participating financial institutions (PFIs): Apart from individual analysis, the implementing agency will also provide every year a summary of all PFIs as part of compliance of continuing eligibility criteria. G. Project Issues and Problems Describe major Issues related to the project and its implementation Describe the remedial actions taken or to be taken to address each issue Design Issues: Readiness Issues: Implementation Issues: Compliance Issues: Other Issues: H. Attachments: (i) Annual Report of PFIs (yearly submission) (ii) Audit Report of Foreign Aided project Audit Directorate (yearly submission) (iii) Continuing Eligibility Report of PFIs (yearly submission) (iv) Minutes of meeting of Project Steering Committee (v) Environmental and social safeguard report
Appendix 4 37 (vi) Excel file:The implementing agency will provide a softcopy of excel of PFI-wise data containing columns of the following parameters: Vulnerable group tagging; Gender of the borrower; Tenors; Geographic location in terms of districts and divisions; Type of financial institutions, such as bank and non-banking financial institutions; Interest rate; Broad sector classification, such as, trade, service and industry; Type of enterprise (cottage, micro, and small) Ownership by type of gender–male and female; Employment generation; Loan performance as per Bangladesh Bank guidelines; Type of subloans– unemployment youth, returnee migrant and rural enterprise; First time loan by sub-borrower / repeat sub borrower of the project Type of project–new or expansion Collateral–none, land and buildings, stocks and book debts, guarantees etc. Type of loan–working capital and fixed investment in land and buildings or machinery Export-orientation–export-oriented or domestic consumption Environmental category
38 Appendix 5 SEMI-ANNUAL GENDER ACTION MONITORING REPORT Targets Indicators Activities Responsibilities Status
Attachment-2 Environmental and Social Management System Arrangement Supporting Post COVID-19 Small Scale Employment Creation Project (SPCSSECP) Project Number: 54336-001 October 2021 (RRP BAN 54336)
CURRENCY EQUIVALENTS (as of 30August 2021) Currency unit – taka (Tk) Tk1.00 = $0.0117 $1.00 = Tk85.1799 ABBREVIATIONS ADB – Asian DevelopmentBank EIA – environmental impact assessment EMP – environmental managementplan ESMS – Environmental and Social Management System IEE – Initial EnvironmentalExamination PIAL – Prohibited Investment Activities List SPS – Safeguards PolicyStatement NOTE{S} (i) The fiscal year (FY) of the Government ofBangladeshand its agenciesends on30 June. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2021ends on30 June 2021. (ii) In this report, "$" refers to United States dollars. This environmental and social management system arrangement is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff; and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory orarea.
A. Introduction
1 Also known as tribes, minor races, ethnic sects and communities in the context of Bangladesh.
2 Regulation Brief Description Bangladesh Environmental Conservation Act, 1995 (as amended by Act Nos 12 of 2000 and 9 of 2002) This Act provides for conservation of the environment, improvement of environmental standards and control and mitigation of environmental pollution. Environment Conservation Rues (ECR) of 1997 (adopted under the provision of ECA 1995 and amended in February and August 2002, 2005, February 2010, and February 2017) This Act provides rules related to the declaration of ecologically critical areas, obtaining environmental clearance certificate (ECC), environmental quality standards, acceptable limits for discharges of waste, and environmental guidelines on pollution prevention. National Disaster Management Act 2012 This Act provides for establishment of a framework for managing disasters in a comprehensive way. Environment Court Act 2000 (amended in 2002 and 2010) Under the Judiciary and Ministry of Environment, Forests, and Climate Change (MOEFCC), this Act ensures the resolution of disputes on environmental and social damages resulting from any development activities. This also allows for the completion of environment-related legal proceedings effectively. 0BNational Forest Policy 1977 (amended in 1994) This policy is designed to conserve the existing forest areas, bring about 20% of the country's land area under the Forestation Programme, and increase reserve forests by 10% per year to 2015 through coordinated efforts of Government of Bangladesh and nongovernment organizations, and through active participation of the people. Wetland Protection Act 2000 The law provides for the protection of water bodies of the cities, divisional and district towns, and municipalities. The water bodies in the rural areas are outside the jurisdiction of this Act. However, the Act does not have any provision that prohibits construction of any kind of permanent or temporary structure within a determined distance of the water bodies. Natural Water Bodies Protection Act 2000 According to this Act, the character of water bodies (i.e., rivers, canals, tanks, or floodplains identified as water bodies in the master plans or in the master plans formulated under the laws establishing the municipalities in division and district towns) shall not be changed without approval of the concerned ministry. This Act is under the Rajdhani UnnayanKartipakkha/Town Development Authority/Municipalities. Bangladesh Water Act 2013 This Act makes provisions for integrated development, management, abstraction, distribution, use, protection, and conservation of water resources. National Safe Drinking Water Supply and Sanitation Policy of 1998 Ensures access to safe water and sanitation services at an affordable cost
3 Regulation Brief Description Infectious Diseases (Prevention, Control and Elimination) Act 2008 This Act provides to “keep or quarantine any suspected person infected with an infectious disease, at a specific hospital, temporary hospital, establishment or home”. This law empowers government in notification, isolation, quarantine, sample collection and testing in emerging diseases. Medical Waste Management Rules 2008 Any solid, liquid, gaseous, and radioactive waste material generated during the diagnosis, treatment, preventive, and curative measure, or in research activities pertaining to disease diagnosis when it is released, discharged, or disposed causing detrimental effect on human health and environment is considered medical waste Public Health (Emergency Provisions) Ordinance, 1994 Calls for special provisions in case of emergency to prevent the spread of human disease, safeguarding public health and providing them adequate medical service and other services essential to the health of respective community and workers in particular during the construction related work. Environment Court Act 2000 (amended in 2002 and 2010) This Act ensures the resolution of disputes on environmental and social damages resulting from any development activities. This also allows for the completion of environment-related legal proceedings effectively. Bangladesh Labour Act 2006, Bangladesh Labor Act 2013, Factory Rule 1979 These regulations aim to protect the interests and rights of the workers, through provision of comfortable working environment, reasonable working conditions, and to ensure workers‟ safety. This also provides for the prohibition of employment of children and adolescent. Bangladesh Labour Rules 2015 The rules state compliance procedure to engage manpower and obtaining approval of the Manpower Policy. The Rules prescribe the process and forms for the registration of manpower supply agencies under the Labour Act and use of certain forms for various register such as service book, labour register, leave register, etc. Bangladesh National Building Code 2006 The Code sets minimum standards for design, construction, quality of materials, use and occupancy, location, and maintenance of all buildings to safeguard, within achievable limits, life, limb, health, property, and public welfare. Bangladesh Building Construction Rules 2008 These rules aim to control development by imposing conditions on setbacks, site coverage, construction of garages, access to plot, provision of lift, land use of that particular plot and height of building. It regulates technical details of building construction and maintains standards of building construction. Bangladesh Factory Act 2006 The Act requires every workplace including small- or large-scale construction where women are employed to have an arrangement of childcare services. Based on this Act and Labor Laws - medical facilities, first aid and accident and emergency arrangements are to be provided by the authority to the workers at workplaces.
4 Regulation Brief Description Local Government (Pourashava) Act 2009 and the Local Government (City Corporation) Act 2009 Provides guidance for integrated community and workers health and hygiene at the construction, and operation and maintenance stages of the project. 5. Land acquisition and resettlement. Articles 42 and 47 of the Bangladesh Constitution 1972 set forth the basic principles of property compensation while the Land Acquisition Act 1894, and the Acquisition and Requisition of Immovable Property Ordinance (ARIPO) 1982 (amended in 1994, 1995, and 2004) are regulations being enforced by the Revenue Department. However, ARIPO 1982 has been revised and the current policy framework for land acquisition and resettlement will now be based on the Acquisition and Requisition of Immovable Property Act of 2017. 6. Indigenous Peoples. The protection of the fundamental rights of all citizens, which include Indigenous Peoples, is provided for in Articles 11, 19, and 28 of the 1972 Constitution. Specifically, Articles 23–24 set forth the protection of the cultural tradition of Indigenous peoples. The Chhoto Nagpur Tenancy Act of 1908 allows for (i) individual ownership of lands to ethnic communities, whereby the transfer of tribal land to non-tribal people without the permission of the Deputy Commissioner would be illegal; (ii) free to profess and practice their religions and develop their own culture; and (iii) “Adivasi” right to protect their own land. 1F 2 C. Bangladesh Bank’s ESRM Guideline 7. With a view of integrating sustainability into overall credit management of banks and FIs, Bangladesh Bank issued the Guidelines on Environmental and Social Risk Management (ESRM) in 2011 which has been the pioneering initiative from any central bank or financial sector regulator. The latest update has been made to ESRM in February 20172F 3 . In parallel to the DOE assigned four color coded environmental categories, the Bangladesh Bank‟s ESRM also proposed to assign financial intermediary as a risk category to those transactions involving clients such as banks, microfinance institutions, private equity funds, and leasing and insurance companies, which act as financial intermediaries in making financing available to other clients. The Bangladesh Bank‟s ESRM proposed 3 categories: (a) High - transactions typically involve clients with business activities with significant adverse environmental and social impacts that are sensitive, diverse, or unprecedented. A potential impact is considered sensitive if it may be irreversible (such as loss of a major natural habitat), affect vulnerable groups or ethnic minorities, involve involuntary displacement and resettlement, or affect significant cultural heritage sites; (b) Medium - transactions typically involve clients with business activities with specific environmental and social impacts that are few in number, generally site-specific, largely reversible and readily addressed through mitigation measures and international best practice. Potential adverse environmental impacts on human populations or environmentally important areas are less adverse than those of High-risk transactions; and (c) Low - Transactions typically involve clients with business activities with minimal or no adverse E&S impacts.
2 Adivasis is Bangladesh‟s minority tribal group. 3 https://www.bb.org.bd/aboutus/regulationguideline/esrm_guideline_feb2017.pdf
5 D. Safeguard Requirements of the ADB 8. Environment categorization of the ADB. According to Safeguard Requirements 1 of the SPS, a subproject‟s environment category is determined by the category of its most environmentally sensitive component, including direct, indirect, induced, and cumulative impacts. Each proposed subproject is scrutinized as to its type, location, scale, sensitivity and magnitude of its potential environmental impacts. 9. A proposed subproject is assigned one of the following categories depending on the significance of potential environmental impacts and risks: (i) Category A. A proposed subproject is classified as category A if it is likely to have significant adverse environmental impacts that are irreversible, diverse, or unprecedented. These impacts may affect an area larger than the sites or facilities subject to physical works. A subproject in this category is not allowed under this project; (ii) Category B. A proposed subproject is classified as category B if its potential adverse environmental impacts are less adverse than those of category A subprojects. These impacts are site-specific, few if any of them are irreversible, and in most cases mitigation measures can be designed more readily than for category A subprojects. An initial environmental examination (IEE), including an environmental management plan (EMP), is required. A subproject in this category is not allowed under this project; and (iii) Category C. A proposed subproject is classified as category C if it is likely to have minimal or no adverse environmental impacts. An environmental impact assessment or IEE is not required, although environmental implications are reviewed and subproject specific environment management plan is framed, as necessary. 10. Involuntary resettlement categorization. According to Safeguard Requirements 2 of the SPS, a subproject is assigned one of the following categories depending on the significance of the probable involuntary resettlement impacts: (i) Category A. A proposed subproject is classified as category A if it is likely to have significant involuntary resettlement impacts. A subproject in this category is not allowed under this project; (ii) Category B. A proposed subproject is classified as category B if it includes involuntary resettlement impacts that are not deemed significant. A subproject in this category is not allowed under this project; and (iii) Category C. A proposed subproject is classified as category C if it has no involuntary resettlement impacts. No further action is required. 11. Indigenous Peoples categorization. According to Safeguard Requirements 3 of the ADB Safeguard Policy Statement (2009), a proposed subproject is assigned to one of the following categories depending on the significance of the potential impacts on Indigenous Peoples: (i) Category A. A proposed subproject is classified as category A if it is likely to have significant impacts on Indigenous Peoples. A subproject in this category is not allowed under this project. (ii) Category B. A proposed subproject is classified as category B if it is likely to have limited impacts on Indigenous Peoples. A subproject in this category is not allowed under this project.
6 (iii) Category C. A proposed subproject is classified as category C if it is not expected to have impacts on Indigenous Peoples. No further action is required. E. Applicable Environmental and Social Requirements for the Project 12. As the project‟s implementing agency, Bangladesh Bank will make sure that PFIs carry out proper due diligence for selection of subloans for financing. PFIs will conduct environmental and social screening using the guidelines provided in the ESMS to comply with the requirements of Bangladesh Bank, national laws and regulations, and ADBSPS. All subloans/subprojects are reviewed and evaluated against the ESMS, national laws, regulations and standards on environment, health, safety, involuntary resettlement and land acquisition, Indigenous Peoples, and physical cultural resources. The guidance for selection of subloans are as follows: (i) Subloans/subprojects will be screened against ADB‟s Prohibited Investment Activities List (PIAL) (see Appendix 1); (ii) subprojects belonging to prohibited or discouraged List of Activities of Bangladesh will not be eligible. (iii) all subprojects that passed criteria (i)–(ii) will need to fill in the (a) environmental screening checklists; (b) involuntary resettlement screening checklist; and (c) indigenous peoples screening checklist (Appendix 4) for further screening of their nature, scale, and siting to determine possible adverse social impacts and thus, the category and eligibility of the subloans will be determined based on their environmental and social categorization and the criteria set in Table 2. 13. This ESMS will be communicated to all relevant staff and operational employees of Bangladesh Bank, PFIs and loan recipients (subborrowers) forcompliance. 14. Overall, ADB‟s safeguard selection criteria for subloans under ADB project is summarized in Table 2 below. Table 2: Summary of Safeguard Requirements Category (Risk Rating) Environmental Assessment Involuntary Resettlement Indigenous Peoples Category A (with potential significant impacts) Ineligible for project financing Category B (with less significant impacts) Category C (with minimal or no impacts for environmental; and no impact for involuntary resettlement and Indigenous Peoples) Comply with national laws, ESMS, and ADB‟s PIAL ADB = Asian Development Bank, PIAL = Prohibited Investment Activities List. F. Implementation Arrangements 15. The Ministry of Finance, acting through its Economic Relations Division is the executing agency while the Finance Division is the financial management agency, and Bangladesh Bank is the implementing agency. A project management unit (PMU) will be established by Bangladesh Bank to monitor the screening and selection of subprojects/subloans and the dayto-day implementation ofthe project. Bangladesh Bank has developed environmental and social screening guidelines for the PFIs, which were agreed by ADB. PFIs will screen all subprojects
7 based on the screening checklist to exclude all subprojects with category A and category B impacts on the environment, involuntary resettlement, and tribes, minor races, ethnic sects and communities; and finance only subprojects that are classified category C. Training will be provided for Bangladesh Bank and PFI staff on safeguards. Bangladesh Bank will assign experienced staff to oversee safeguard implementation.The annual safeguards monitoring reports are to be submitted to ADB by Bangladesh Bank PMU. G. COVID-19 Health and Safety Guidance 16. Considering community transmission of COVID-19 in Bangladesh, all selected PFIs and subloan beneficiaries will follow the guidance and protocols of Bangladesh and ADB (see Appendix 5). ADB has shared the guidance notes with its executing and implementing agencies in the DMCs. Bangladesh government has also issued a technical instruction in June 2020 for reopening the businesses and activities. All PFIs and subborrowers are required to follow the instructions provided by Bangladesh government and ADB. H. Compliance Monitoring and Reporting 17. Bangladesh Bankwill ensure that screening checklists, associated permits, any grievance redress- related documents are systematically recorded. These documents will be made available during ADB review missions. ADB will conduct periodic review missions which may include review of screening checklists and site visits to sample subprojects to ensure that only the eligible subprojects are financed through the ADB loan. 3F 4As a precautionary measure, Bangladesh Bankwill submit to ADB anannual environmental and social safeguard monitoring report (Appendix6). I. Grievance Redress Mechanism 18. Bangladesh Bank‟sFinancial Integrity and Customer Service Department (FICSD)is the existing channel for Grievance Redress Mechanism (GRM). The GRM will provide a systematic, transparent, and timely process for receiving, evaluating, and addressing affected people‟s subproject-related complaints and grievances. The GRM will be open to all subproject affected people, regardless of the nature of their complaint using an understandable and transparentprocessthatisgenderresponsive,culturallyappropriate,andreadilyaccessibletoall segments of the affected people at no costs and withoutretribution. 19. A complaint may be registered by stakeholders who may be directly or indirectly affected by the subloan. An affected person may opt to remain anonymous. A representative may register on behalf of the affected person or group provided that the representative is identified by the affected person or group and submits evidenceoftheauthoritytoactontheirbehalf.A complaint can be submitted through written application, by e-mail or personal appearance at any branch office and/or Head Office of PFIs. Any unresolved issues may be forwarded to the Head Office of Bangladesh Bank. 20. Complainant may file grievances through the following channels: (i) Level 1. The complainant files a grievance against a subproject to branch office of PFIs.Thebranchofficeisrequiredtoresolvecomplaintsagainsttheclient within 10 working days of receipt of the complaint. The office will receive, acknowledge
4Missions will be conducted virtually until such time that it is allowed by national government and ADB.
8 and record all complaints received (including contact details of the complainant, date the complaint was received, nature of grievance), take actions or decisions to address the grievance, and provide feedback to the complainant, via writing (so that a record ismaintained). (ii) Level 2. If the complainant is not satisfied with the action taken or if the branchoffice of PFIsisnotabletoresolvethegrievancewithin10workingdays,it will be forwarded to the head office of PFIs, where the case will be reviewed, further information and clarification will be sought from the branch office if necessary. A feedback will be provided to the complainant within 10 working days, and the action will bedocumented. (iii) Level 3. If the head office of PFIs not able to resolve the case within 10 working days, it will be forwarded to the head office of Bangladesh Bank, wherein the same process will be followed, and the grievance will be addressed within 10 workingdays.Intotal ifthecaseneeds to beresolvedwithin 30 working days. 21. The GRM can run parallel to legal redress. Complainant may resort to the country‟s legal system at any stage. 22. Accountability mechanism. In the event that the complainant is not satisfied with the GRM process, the complainant may resort to ADB‟s Accountability Mechanism at any stage. Before submitting a complaint to the Accountability Mechanism, it is recommended that affected people make a good faith effort to resolve their issues by working with the ADB Resident Mission operations department. Only after doing that, and if they are still dissatisfied, they could approach the AccountabilityMechanism. J. Organizational Responsibilities, Resources and Capacity 23. Bangladesh Bankhasextensive prior experience in implementing the ESMS for ADB and other development agencies. Through a TA under the project, an environmental and social safeguard specialist (consultant) will be hired to supplement Bangladesh BanktoimplementtheESMSandfurther developsafeguardcapacity in Bangladesh Bank and PFIs.The environmental and social safeguards specialist (consultant) will develop a training program on environmental and social safeguards. Using Bangladesh Bank funds, the consultant will provide training to staff of Bangladesh Bank(head office, regional offices) and PFI safeguards focals to implement theESMS.
Appendix 1 9 ADB PROHIBITED INVESTMENT ACTIVITIES LIST The following do not qualify for Asian Development FI financing: (i) production or activities involving harmful or exploitative forms of forced labor 4F 1 or child labor;5F 2 (ii) production of or trade in any product or activity deemed illegal under host country laws or regulations or international conventions and agreements or subject to international phaseouts or bans, such as (a) pharmaceuticals, 6F 3 pesticides, and herbicides, 7F 4 (b) ozone-depleting substances,8F 5 (c) polychlorinated biphenyls9F 6 and other hazardous chemicals,10F 7 (d) wildlife or wildlife products regulated under the Convention on International Trade in Endangered Species of Wild Fauna and Flora, 11F 8 and (e) transboundary trade in waste or waste products;12F 9 (iii) production of or trade in weapons and munitions, including paramilitary materials; (iv) production of or trade in alcoholic beverages, excluding beer and wine; 13F 10 (v) production of or trade in tobacco;10 (vi) gambling, casinos, and equivalent enterprises;10 (vii) production of or trade in radioactive materials, 14F 11 including nuclear reactors and components thereof; (viii) production of, trade in, or use of unbonded asbestos fibers; 15F 12 (ix) commercial logging operations or the purchase of logging equipment for use in primary tropical moist forests or old-growth forests; and (x) marine and coastal fishing practices, such as large-scale pelagic drift net fishing and fine mesh net fishing, harmful to vulnerable and protected species in large numbers and damaging to marine biodiversity and habitats.
1 Forced labor means all work or services not voluntarily performed, that is, extracted from individuals under threat of force or penalty. 2 Child labor means the employment of children whose age is below the host country‟s statutory minimum age of employment or employment of children in contravention of International Labor Organization Convention No. 138 “Minimum Age Convention” (www.ilo.org). 3 A list of pharmaceutical products subject to phaseouts or bans is available at http://www.who.int. 4 A list of pesticides and herbicides subject to phaseouts or bans is available at http://www.pic.int. 5 A list of the chemical compounds that react with and deplete stratospheric ozone resulting in the widely publicized ozone holes is listed in the Montreal Protocol, together with target reduction and phaseout dates. Information is available at http://www.unep.org/ozone/montreal.shtml. 6 A group of highly toxic chemicals, polychlorinated biphenyls are likely to be found in oil-filled electrical transformers, capacitors, and switchgear dating from 1950 to 1985. 7 A list of hazardous chemicals is available at http://www.pic.int. 8 A list is available at http://www.cites.org. 9 As defined by the Basel Convention; see http://www.basel.int. 10 This does not apply to project sponsors who are not substantially involved in these activities. Not substantially involved means that the activity concerned is ancillary to a project sponsor's primary operations. 11 This does not apply to the purchase of medical equipment, quality control (measurement) equipment, and any equipment for which ADB considers the radioactive source to be trivial and adequately shielded. 12 This does not apply to the purchase and use of bonded asbestos cement sheeting where the asbestos content is less than 20%.
10 Appendix 2 ENVIRONMENT SCREENING CHECKLIST Please check if the proposed subproject was checked against PIA: Yes/No Date of Screening (D/M/Y):………/………../…………..… Section A: Basic information Sub-borrower‟s Name: …………..…………..…………..………………….………. Location: …………………………………………………………………………………………………… Amount of loan requested: …………………………………. Name of the Enterprise/Employment Description Size/Volume/Production Capacity of Enterprise
Appendix 2 11 1.11 Is there child labor in the work force? 1.12 Are there any complaints from nearby neighbors/sensitive receptors? 1.13 Is there any Grievance Redress Mechanism in place? 1.14 Is there any arrangement for ensuring of environment and social safeguards compliance? 2. Issues Related to Agriculture (Crop, Fruit, Vegetable, Spices production) 2.01 Are the agricultural products safe for humans and harmless to the environment? 2.02 Is the enterprise responsible for introducing invasive plant species? 2.03 Will the invasive plant species be harmful for native species? 2.04 Are the pesticides and herbicides included in the banned list in http:\www.pic.int? 2.05 Is there any post harvesting agro-product storage place? 2.06 Is there any significant quantity of bi-product from harvesting? 2.07 Is the bi-product useful for the poultry and livestock as fodder? 2.08 Are residuals used as bio-fertilizer? 3. Issues related to Livestock and Poultry 3.01 Is there enough source of food/fodder and medicine? 3.02 Is there any source of fresh water? 3.03 Is there proper ventilation? 3.04 Is the place dry, clean and healthy for the livestock? 3.05 Is there any scope for waste management? 3.06 Will the shade belong a waste management facility (if the answer of 3.05 is „no‟)? 3.07 Is the shade vulnerable to spread disease by runoff and water contamination? 3.08 Is there a possibility of degrading the quality of adjacent water bodies by run-off/seepage/leakage/spillage? 4. Issues Related to Fisheries 4.01 Will there be civil works which may affect the quality of surface waters? 4.02 Is the dike high enough to protect the pond/ditch from surface run-off? 4.03 Is there any scope for dike-plantation/grass surfing to prohibit soil erosion? 4.04 Is there any scope of organic waste management? 4.05 Is there a possibility of accidental oil spills (i.e., from boats)? 5. Issues related to Manufacturing 5.01 Is there proper ventilation in the facility? 5.02 Are there sources noise (i.e., from the equipment)? 5.03 Are there any sources of air pollution (dust, smoke, odor)? 5.04 Is there any water treatment facility (to minimize the salinity/iron/arsenic in drinking water)? 5.05 Are there alternative water sources (rainwater)? 5.06 Are the workers provided with proper training on emergency procedures and safety measures? 5.07 Are the workers provided with Personal Protective Equipment (i.e., masks, safety-belts, gloves, spectacles, air-pluck, helmet, gumboot, aprons, etc.)?
12 Appendix 2 5.08 Are the workers provided with sanitary facilities (i.e.? toilet) 5.09 Are solid wastes disposed of properly (biodegradable and non-biodegradable)? 5.10 Are there any harmful chemicals used in the process? 6. Issues related to Food Processing 6.01 Is the facility located near sensitive receptors? (i.e., hospital, school, residential area) 6.02 Does the food processing facility have impacts on soil, ground water and surface water? 6.03 Is wastewater treated? 6.04 Are food ingredients permitted by the proper authorities (e.g., colors & chemicals)? 6.05 Is proper hygiene observed by the workers? 6.06 Are the surroundings regularly sanitized? 6.07 Is there any bad odor observed or reported within the facility? 6.08 Are solid wastes disposed of properly (biodegradable and non-biodegradable)? 6.09 Are the workers provided with Personal Protective Equipment (i.e., masks, safety-belts, gloves, spectacles, air-pluck, helmet, gumboot, aprons, etc.)? 6.10 Are the workers provided with proper training on emergency procedures and safety measures? 6.11 Are there safety signs within the facility? 6.12 Are there any accreditations/certifications related to food safety? 7. Issues related to Trade & Services 7.01 Is there any landing and storage space for products? 7.02 Is there any harmful chemicals used for storage? 7.03 Are the harmful chemicals labelled and stored properly? 7.04 Are there any sources of air pollution (dust, smoke, odor)? 7.05 Are the packages (plastic, glass, wood, polymers) managed or disposed of properly? 7.06 Are there any related activities which may cause pollution (i.e., solid waste accumulation)? 8. Others : 8.01-Salt cultivation and trade, 8.02-Hospital 8.01 Is there any system that protect salt-leaching? 8.02 Is the hospital managing medical waste properly? Description (if any): Environmental Screener of PFI Regional Office…………………………………………………………………………………… Name Signature Date
Appendix 2 13 PART 3 – To be filled by PFI loan officer AftercompletingParts1–2,subprojectsthatfalltocategoryCshouldbefurtherscreenedbythelistbelow aboutitssitingwhichcontributestoitspotentialenvironmental-socialrisksthuscategory. Sensitive receptors and/or protected areas Include but are not limited to: If inside these areas, please provide details If outside, where and how far from its boundary? Critical habitat and natural habitat as defined by ADB Safeguard Policy Statement, world natural or cultural heritage sites, officially designated nature reserves, forest park, geo-park, important wetland, key habitats for wildlife, reproduction area of protected flora, spawning, feeding, wintering ground and migrating route for key aquatic life, estuary, mangrove Designated basic farmland, basic grassland, scenic area/park, drinking water source protective zone, oceanic special protective zones, natural fishery ground, key zone for water and soil erosion control, closure zone for desertification etc. Areas with main function as residential, health and medical, cultural, educational, research and development, and offices as well as physical cultural resources/relics, airports, airfields or militarybases/zones etc.
14 Appendix 3 INVOLUNTARY RESETTLEMENT SCREENING CHECKLIST Name of Subborrower: Name of Enterprise: Location: Probable Involuntary Resettlement Effects Yes No Not Known Remarks Involuntary Acquisition of Land
Appendix 3 15 IR Categorization: A – significant IR impacts (200 or more); RPrequired B – insignificant IR impacts; RPrequired C – no impact; norequirement Prepared by: PFI Loan Officer NameandSignature: Designation: Date: Reviewed by: PFI Safeguard Officer NameandSignature: Designation: Date:
16 Appendix 4 INDIGENOUS PEOPLES SCREENING CHECKLIST Name of Subborrower: Name of Enterprise: Location: KEY CONCERNS (Please provideelaborations on the Remarks column) YES NO NOT KNOWN Remarks A. Indigenous Peoples Identification
Appendix 4 17 KEY CONCERNS (Please provideelaborations on the Remarks column) YES NO NOT KNOWN Remarks B. Identification of Potential Impacts 9. Will the project directly or indirectly benefit or target Indigenous Peoples? 10. Will the project directly or indirectly affect Indigenous Peoples' traditional socio-cultural and belief practices?(e.g., child-rearing, health, education, arts, and governance) 11. Will the project affect the livelihood systems of Indigenous Peoples? (e.g., food production system, natural resource management, crafts and trade, employment status) 12. Will the project be in an area (land or territory) occupied, owned, or used by Indigenous Peoples, and/or claimed as ancestral domain? C. Identification of Special Requirements Will the project activities include? 13. Commercial development of the cultural resources and knowledge of Indigenous Peoples? 14. Physical displacement from traditional or customary lands? 15. Commercial development of natural resources (such as minerals, hydrocarbons, forests, water, hunting or fishing grounds) within customary lands under use that would impact the livelihoods or the cultural, ceremonial, spiritual uses that define the identity and community of Indigenous Peoples? 16. Establishing legal recognition of rights to lands and territories that are traditionally owned or customarily used, occupied or claimed by indigenous peoples? 17. Acquisition of lands that are traditionally owned or customarily used, occupied or claimed by indigenous peoples? D. Anticipated project impacts on IndigenousPeoples Projectcomponent/ activity/ output Anticipated positive effect Anticipated negative effect
18 Appendix 4
Note: The project team may attach additional information on the project, as necessary. IP Categorization: A – significant impacts; IPPrequired B – insignificant impacts; IPP required C – no impact; norequirement Prepared by: PFI Loan officer NameandSignature: Designation: Date: Reviewed by: PFISafeguard Officer NameandSignature: Designation: Date:
Appendix 5 19 COVID-19 HEALTH AND SAFETY GUIDANCE NOTE (DRAFT)16F 1 A. Objective
1 Contractor will finalize the plan to be approved by the PMU
20 Appendix 5 exposure risk to COVID-19 and in planning for preventive measures to non-health care workplaces.17F 2 Figure 1: Levels of Risk Exposure to COVID-19 6. The level of risk in the workplace of each subproject activity should be assessed. The level of risk is affected by several factors such as person‟s underlying health conditions, presence of transient workers where original community has or had an outbreak, poor condition of sanitary facilities, poor housekeeping practices, workers in and out of the local communities, and lack of reliable health care facilities to respond to any COVID-19 incidence. 7. The subborowers shall coordinate with the respective local government units in case positive cases are identified. F. Hierarchy of Controls to Reduce Risk 8. The WHO and the Canadian Centre for Occupational Health and Safety (CCOHS) provide guidance on COVID-19 preventive measures that can be implemented in the workplace. According to CCOHS, a zero risk for COVID-19 transmission is not possible in any setting, and as such, the best approach is to always keep the risk exposure as low as possible. Figure 2 shows the hierarchy of controls to reduce risk while Table 1 presents the preventive measures that can be applied.
2 World Health Organization. 2021. Considerations in implementing and adjusting public health and social measures in the context of COVID-19: interim Guidance.
Appendix 5 21 Figure 2: Hierarchy of Controls to Reduce Risk G. Preventive Measures 9. The subborrowers should put in place measures to minimize the chances of spreading and contain the spread of the virus, ensure their worksites are prepared for an outbreak, and develop and practice contingency plans so that personnel know what to do if an outbreak occurs and how treatment will be provided. These preparation measures should be communicated to its employees. Table: Preventive Measures to Reduce Risk to COVID-19 Exposure Controls Preventive Measures Characteristics Prepare detailed profile of the workforce, activities and work schedule, breakdown of workers (i.e., living at home, those who stay within the local community, and onsite accommodation); identify measures to minimize movement in and out of the worksite Information/awareness • Prepare/print materials on COVID-19 (refer to WHO Bangladesh website, https://www.who.int/bangladesh/emergencies/coronavirus-disease-(covid19)-update. • Place COVID-19 posters and signs in the worksite/office with images and text in Bengali and English (refer to website of WHO Bangladesh and DGHS) • Provide updates to workers and staff on COVID-19 risks in the workplace from sources such as WHO, CDC, and DGHS Education (briefing and orientation) • Include safety briefings that cover issues such as safety procedures, appropriate use of PPEs, occupational health and safety, workers‟ code of conduct, flexible work hours, etc. to ensure compliance to COVID-19 safety requirements. • Appoint an occupational health and safety (OHS) officer onsite who will be the authority to issue directives to maintain health and safety of all workers and staff. • Briefing to include topics such as: (i) signs and symptoms of COVID-19, (ii) how it is transmitted, (iii) how to protect oneself (safety protocols), (iv) what to do if one has the symptoms or others have the symptoms, (v)
22 Appendix 5 Controls Preventive Measures discrimination or prejudice in case a worker becomes positive to COVID19, and (vi) site access control system and monitoring. Communication Workers and Staff • Information/updates on COVID-19 risks will only come from the OHS officer (or back-up in case the OHS Officer gets sick) to avoid confusion. • Workers can report to the OHS officer on work situations that are not safe or healthy. • Workers will be given opportunities to ask questions, raise their concerns, and make suggestions as they see fit. • Seek assistance from the local government unit in designing appropriate health and safety measures. • General hygiene requirements will be communicated and monitored by the OHS officer. This includes: (i) ensure handwashing stations are equipped with soap, disposable paper towels, and waste bins with cover in key areas at the worksite (e.g., entry/exit to work areas, toilet, canteen/food distribution, drinking water station, workers‟ temporary rest area, waste disposal area, etc.). If hand washing stations with soap and water are not available, alcohol-based sanitizer (at least 60% alcohol) will be used. • Communicate clearly based on information from WHO or DGHS in a manner that can be easily understood by workers such as putting of posters on handwashing, social distancing or on how to protect themselves. Access Control • Prohibit entry if employees have symptoms or may have been exposed. • Sign-in devices will be sanitized and contact during sign-in will be minimized. • Keep a distance of at least 1 meter between persons and avoid direct physical contact (e.g., shaking hands). • Temperature check using thermal scanner will be mandatory before entry and at the end of work shift (low-grade fever of 37.3oC or more will not be allowed entry to the workplace). Anyone who leaves and re-enters within the work shift will be re-checked. • An area will be designated for staff to wear personal protective equipment (PPE) such as facial mask and will be disinfected twice a day. • Meetings will be held outdoors with social distancing. If conducted indoors, number of persons will be limited to maintain social distancing or additional sessions will be done. • Any person on medication for a specific medical condition that will affect work performance will not be allowed. Sanitation Hand hygiene • Put signs or posters to encourage frequent hand washing with soap and water for at least 20 seconds. • Ensure availability of adequate hand washing stations (even just a spouted water container, catch bucket for water, soap, and paper towels) accessible to workers. If water and soap are not available, alcohol-based hand sanitizers (with at least 60% alcohol) will be used. • Regular and thorough handwashing: (i) before starting work, (ii) before eating or drinking, (iii) frequently during the work shift, especially after contact with co-workers or touching shared items/tools/equipment, (iv) after going to the washroom, (v) after handling garbage, (vi) after contact with potentially contaminated objects (gloves, clothing, masks, used tissues, waste), and (vii) immediately after removing gloves and other PPEs but before touching eyes, nose, or mouth. • Sharing phones, tools, or equipment will be discouraged unless they can be disinfected between users.
Appendix 5 23 Controls Preventive Measures • Discourage sharing of items such as phones, tablets, tools, or equipment unless they can be cleaned and disinfected between users. • If possible, assign each worker a unique set of tools for their use only. • Have workers bring their own pre-filled water bottles and food. Food and water bottles should not be shared. Respiratory hygiene • Post signage promoting respiratory etiquette in the workplace. • Wear mask or face cover based on the requirements of the government and will ensure its safe and proper disposal. • Medical facial mask and paper tissues will be made available for those who may sneeze (or into the bend of the arm) or develop a runny nose at work, along with no-touch plastic lined garbage bins with lids for hygienic disposal of used tissues and mask. • A worker who is sick will not be allowed to work and if a worker feels unwell at work, a medical mask will be provided and will be allowed to get home safely. Cleaning, disinfection, and waste disposal • Clean offices, washrooms, lunch/break rooms and other workspaces every day focusing on commonly touched surfaces such as doorknobs, handrails, tables, chairs, tools, radios, etc., using soap or neutral detergent. Disinfect after cleaning to kill pathogens with disinfectants approved by local authorities such as DGHS. • Regularly clean shared tools, phones, and other devices with alcohol or disinfectant wipes. • Train cleaning staff on appropriate cleaning procedures and frequency of high-use areas • Monitor and restock washrooms and workspaces for soap paper towels and hand sanitizer. • No touch garbage bins will be provided for waste collection in all common access areas, manage waste as a type of medical waste, and dispose accordingly. Physical distancing • Maintain a distance of at least 1 meter between people and avoid direct physical contact, strict control over external access, queue management. • Limit the number of people allowed in indoor spaces and common areas at the same time to maintain distance. • Mandatory use of mask if social distancing cannot be followed. Reusable mask will be cleaned and disinfected after use and will not be shared. Single use mask will be disposed of in designated covered bins. Work schedule and work practices • Identify work that can be done offsite and allow staff to work from home or remotely where and when possible. • Use technology such as Zoom, Microsoft Team, and other platforms to help workers while working from home. • Stagger work hours or workdays to reduce the number of workers at one time on-site or in common spaces like entry, as necessary • Arrange that work breaks are taken in outdoor areas on-site. • Workers returning from an area where there is COVID-19 transmission should monitor themselves for symptoms for 14 days and take their temperature twice a day; if they are feeling unwell, they should stay at home, self-isolate, and contact a medical professional. Worker who may have COVID-19 symptoms • Any person showing signs of cough or colds will not be allowed access to the work site and will be advised to stay home and isolate.
24 Appendix 5 Controls Preventive Measures • A contingency plan/protocol will be developed, in consultation with local authorities, to set out procedures if someone becomes ill at the worksite. • Report if there is stoppage of work due to incidence of sick workers and staff, or any health and safety concerns at the worksite. Sources:ADB. 2020. Protecting the Safety and Well-Being of Workers and Communities from COVID-19. Manila; Canadian Centre for Occupational Health and Safety. 2020. Coronavirus (COVID-19) Tips. and COVID-19: Workplace Health and Safety Guide; US Centers for Disease Control and Prevention. COVID-19 Workplaces and Business; World Health Organization. Bangladesh. Coronavirus disease (COVID-19) Update; and World Health Organization. Considerations for public health and social measures in the workplace in the context of COVID-19. 10 May 2020.
Appendix 6 25 SUGGESTED SCOPE FOR A SEMI-ANNUAL ENVIRONMENTALAND SOCIAL MONITORING REPORT Bangladesh Bankis required to submit the semiannual Environmental and Social Monitoring Report (ESMR) to ADB. Please include additional sheets or attachments as required to provide details. Name of Organization Completed by (name): Position in organization: Date: Reporting period From: To: A. Subprojects processed under ADB fund during the reporting period Name of Subproject Sub /sector Tenor of Subloan (Months) Subloan amount ($„000) Safeguard Category Env, IR or IP issues and actions taken Status (approve, revise or reject) Reasons (for revise or reject) Env IR IP Env = environment, IR = involuntary resettlement, IP = Indigenous Peoples. a Please use the sectors listed in the earlier table or any standard classification B. Subprojects Supported Using ADB Funds More information about all subprojects approved during this reporting period. Name of Subborrower and subproject: Subproject location: Industry/ sector: Value of exposure (US$ million):
26 Appendix 6 Any E&S due diligence by your organization? If yes, is it desk review of safeguard documents, and/or field visit, and by whom and when? Any environmental assessment report (including EMP), IR plan, or IP plan, or audit reports reviewed by your organization? If yes, please provide the names of documents reviewed. What were the main environmental, IR and IP issues associated with this subproject, and how were the issues dealt with? Were any conditions or covenants related to E&S issues made along with the investment? If yes, please briefly describe. Does the subproject comply with applicable domestic and ADB safeguard requirements? Any incidents of non-compliance? Please describe how you ensure subproject E&S compliant. How you monitor the subborrower and its subproject’s performance? Please describe supporting docs such as E&S monitoring reports. C. FI’s portfolio by Sub/Sectors Please provide an indicative % of FI‟s portfolio, or only those financed under ADB project if it can be separated from its entire portfolio. Industrial Sector or subsector Subloan in XX year By subloan amount Number % In USD %
Appendix 6 27 D. Additional Information for the Reporting Period