2020-06-17
Added · Updated
The Operating Guidelines for the JICA assisted Urban Building Safety Project are amended to replace the eligible geographical locations of Dhaka District, Gazipur District, Narayanganj District and Chittagong City with Dhaka District, Gazipur District, Narayanganj District and Chattogram District. Additionally, the previous Application form for Financing under the project is replaced by a modified form attached to the circular. These changes apply to all accredited Primary Financial Institutions under the project.
Page 1 of 3 SME & S pecial Programmes Department JICA-PIU(UBSP) SMESPD Circular Letter No. 04 Date: 17 June 2020 CEO/MDs All accredited PFIs under Urban Building Safety Project Head Office, Dhaka. Dear Sirs, Regarding addendum of Operating Guidelines for JICA assisted Urban Building Safety Project (UBSP, BD-P84) Please refer to our SMESPD Circular no. 03/2016 dated 25 September 2016, the Operating Guidelines of UBSP project attached with the circular and SMESPD Circular Letter no. 03/2018 dated 07 November 2018. With the aim of extending financial support for safe working environment of RMG sector and smooth implementation of the project necessary amendments in the Operating Guidelines has been made. Details are explained below:
Attachment: As mentioned above Sincerely Yours, Md. Sharafat Ullah Khan Project Director & Deputy General Manager Phone: 9530331
Page 2 of 3 Application for financing under Urban Building Safety Project (UBSP) funded by JICA Please affix First A. Organization Information Owner’s PP size Photograph
Page 3 of 3 7. Name and address of Soil Testing Firm: ………………………………………………….………………... ……………………………………………………………………… IEB No: …………………………………… 8. Name of Designer: a) Architectural: …………………………………………………………… IAB No: ……………………. b) Structural: ……………………………………………….……………… IEB No: …………………….. c) Electrical: ………………………………………………………………... IEB No: ……………………. d) Fire Safety: ………………………………………………………IAB & IEB No: …………………….. (Note: Resume of Structural Designer must be attached mentioning detail work experience) 9. Name and address of construction firm (if applicable): ………………………………………………….. ………………………………………………………………………………………………………………… 10. Name of Supervising Engineer (if applicable): …………………………………… IEB No: ……………. 11. Test Results of Materials during Construction (as attachment) (if applicable): Concrete Re-bar Others 12. Plan approved by (Name of the Authority): ……………………………………………………………….. Memo No: …………………………………………………………………… Date: ……………….......... 13. Approved for: ……………… storied; Construction completed (up to): ……………… floor 14. Floor Area (as per approved drawing): a) Per Floor: …………………………… s qft b) Total: …………………………… s qft 15. Type of Building: RCC frame structure Brick wall/ foundation Steel structure 16. Ownership: Self-Owned Rental 17. Number of Workers: a) Male: ……………………… b) Female: ……………………… 18. Compliance Certificates from: a) …………………………………… b) …………………………………… c) …………………………………… d) …………………………………… 19. Other Attachment (if any): a) …………………………………… b) …………………………………… c) ……… …………………………… d) …………………………………… e) …………………………………… f) …………………………………… I hereby certify the correctness of figures/data/information and documents furnished herein/herewith. I also hereby undertake to furnish further particulars as may be required by the Authority and abide by the rules, regulations and instructions issued by PWD-PIU and BB-PIU of Urban Building Safety Project (UBSP). Management reserves the right to sanction/ reject the loan based on assessment. Signature of the Applicant: Date:
More like this from BB
BB published 33 documents in the last 30 days. We email you each new one the day it's published.