SMESPD Circular Letter No. 04: Addendum of Operating Guidelines for JICA assisted Urban Building Safety Project

The Operating Guidelines for the JICA assisted Urban Building Safety Project are amended to replace the eligible geographical locations of Dhaka District, Gazipur District, Narayanganj District and Chittagong City with Dhaka District, Gazipur District, Narayanganj District and Chattogram District. Additionally, the previous Application form for Financing under the project is replaced by a modified form attached to the circular. These changes apply to all accredited Primary Financial Institutions under the project.

Bangladesh Bank logo

Bangladesh

Bangladesh Bank

Click to view thumbnail

Page 1 of 3 SME & S pecial Programmes Department JICA-PIU(UBSP) SMESPD Circular Letter No. 04 Date: 17 June 2020 CEO/MDs All accredited PFIs under Urban Building Safety Project Head Office, Dhaka. Dear Sirs, Regarding addendum of Operating Guidelines for JICA assisted Urban Building Safety Project (UBSP, BD-P84) Please refer to our SMESPD Circular no. 03/2016 dated 25 September 2016, the Operating Guidelines of UBSP project attached with the circular and SMESPD Circular Letter no. 03/2018 dated 07 November 2018. With the aim of extending financial support for safe working environment of RMG sector and smooth implementation of the project necessary amendments in the Operating Guidelines has been made. Details are explained below:

  1. In the Operating Guideline Eligible Project Area is mentioned in Introduction 1st paragraph (Page 10), Clause 1.1.Objective of the Project (Page 12), Clause 2.1.3.Eligible Geographical Location (Page 19), ANNEX VI: Terms and Conditions of Sub-loans (Page 71) as “Dhaka District, Gazipur District, Narayanganj District and Chittagong City” which will be replaced as “Dhaka District, Gazipur District, Narayangonj District and Chattogram District” from now on.
  2. Annex XIII: Application form for Financing under Urban Building Safety Project (UBSP) funded by JICA has few modifications. The modified form in attachment is applicable instead of previous one from now on.

Attachment: As mentioned above Sincerely Yours, Md. Sharafat Ullah Khan Project Director & Deputy General Manager Phone: 9530331

Page 2 of 3 Application for financing under Urban Building Safety Project (UBSP) funded by JICA Please affix First A. Organization Information Owner’s PP size Photograph

  1. Name of the Organization/Company: …………………………………………....
  2. Status of the company: Proprietorship Partnership Joint Venture Private Limited
  3. Year of Establishment: …………………….………………………………………………………………..
  4. Main Products: ………………………………………………………………………………………………
  5. Main Clients: …………………………………………………………………………………………………
  6. Name of CEO: …………………………………….………………………………………………………….
  7. Share Holders/ Directors: SL No. Name of Share Holders Designation % o f Sh a re 1 2 3 4 5 6 B. Factory/Building Information
  8. Name of the Factory: ……………………….……….……….……………….……….………….…………. a) Name of the Building (Applied for): ……………………….……….……….……………….………….. b) Purpose of Loan: Retrofitting Rebuilding Relocation Fire Safety New Construction c) Total Seeking Amount of Loan: ……………………….……….……….………………………….…….. (In Words): ……………………….……….……….……………………………………….………….…..
  9. BGMEA/BKMEA/BGAPMEA Membership No: …………………………………….………….….……..
  10. Address: ……………………….……….……….……………….……….…………………….………….…. ……………………….……….……….……………….……….………………………………….……….….. Tel. No (Office): …………………………….…………. (Residence): ………………………………....…. Fax: ………………………….……… Cell No: ……………………… E-mail: ………………………...….
  11. Contact person: ……………………………………………… Cell No: ……………………………….…..
  12. Availability of drawings and documents (as attachment): Approved Plan Architectural Design Soil Test Report Structural Design Electrical Design Fire Safety Design
  13. Name and address of Design Organization: a) Architectural: …………………………………………………………………………………………….. b) Structural: ………………………………………………………………………………………………... c) Electrical: ………………………………………………………………………………………………… d) Fire Safety: ………………………………………………………………………………………………..

Page 3 of 3 7. Name and address of Soil Testing Firm: ………………………………………………….………………... ……………………………………………………………………… IEB No: …………………………………… 8. Name of Designer: a) Architectural: …………………………………………………………… IAB No: ……………………. b) Structural: ……………………………………………….……………… IEB No: …………………….. c) Electrical: ………………………………………………………………... IEB No: ……………………. d) Fire Safety: ………………………………………………………IAB & IEB No: …………………….. (Note: Resume of Structural Designer must be attached mentioning detail work experience) 9. Name and address of construction firm (if applicable): ………………………………………………….. ………………………………………………………………………………………………………………… 10. Name of Supervising Engineer (if applicable): …………………………………… IEB No: ……………. 11. Test Results of Materials during Construction (as attachment) (if applicable): Concrete Re-bar Others 12. Plan approved by (Name of the Authority): ……………………………………………………………….. Memo No: …………………………………………………………………… Date: ……………….......... 13. Approved for: ……………… storied; Construction completed (up to): ……………… floor 14. Floor Area (as per approved drawing): a) Per Floor: …………………………… s qft b) Total: …………………………… s qft 15. Type of Building: RCC frame structure Brick wall/ foundation Steel structure 16. Ownership: Self-Owned Rental 17. Number of Workers: a) Male: ……………………… b) Female: ……………………… 18. Compliance Certificates from: a) …………………………………… b) …………………………………… c) …………………………………… d) …………………………………… 19. Other Attachment (if any): a) …………………………………… b) …………………………………… c) ……… …………………………… d) …………………………………… e) …………………………………… f) …………………………………… I hereby certify the correctness of figures/data/information and documents furnished herein/herewith. I also hereby undertake to furnish further particulars as may be required by the Authority and abide by the rules, regulations and instructions issued by PWD-PIU and BB-PIU of Urban Building Safety Project (UBSP). Management reserves the right to sanction/ reject the loan based on assessment. Signature of the Applicant: Date: