Individual decision · BCB · 18 Jan 2022 · RESOLUCIONES DE DIRECTORIO N° 011/2022

Board Resolution No. 011/2022

Applies to: A named firm

The Board of Directors of the Central Bank of Bolivia approves an extraordinary credit of Bs793,585,934.00 to Yacimientos de Litio Bolivianos (YLB) for the third phase of the Salar de Uyuni brine development project. The loan carries a 1.90% annual interest rate, a 20-year term with a 5-year grace period, and is guaranteed by non-negotiable Treasury Bonds. The Interim President of the Central Bank is authorized to sign the credit contract, with disbursements required by October 30, 2023.

BoliviaBanco Central de Bolivia

Lineage

The documents this one cites, and the documents that cite it.

amendssupersedesissued underrefers todashed card: not in RegAlert (or proposed)arrows run from the older text to the one that changes it
The links and the sentences they come from (1)
Issued under
Mentions (3): 2 documents this one mentions and 1 document that mentions it, without changing it
Refers to
Referred to by
Common references

More like this from BCB

BCB published 11 documents in the last 30 days. We email you each new one the day it's published.

Source: Banco Central de Bolivia — original document · Summary generated with machine assistance and checked by an AI reviewer before publication; the authoritative text is the regulator's original document. How RegAlert works

In RegAlert: added · updated