2018-08-07 | RESOLUCIONES DE DIRECTORIO Nº 102/2018Added · Updated
The Board of Directors of the Central Bank of Bolivia approves a concessional extraordinary credit of Bs109,511,595.00 to the National Electricity Company (ENDE) to finance the "La Ventolera Wind Generation Construction" project. The loan carries a 1.44% interest rate, a 30-year term with a 5-year grace period on principal, and is guaranteed by Non-Negotiable Treasury Bonds. The Central Bank President is authorized to sign the contract with ENDE and the Ministry of Energy, with disbursements required to be completed by March 31, 2021.
More like this from BCB
BCB published 5 documents in the last 30 days. We email you each new one the day it's published.