Consultation · FCA · 11 Jan 2023
The Financial Conduct Authority and the Prudential Regulation Authority propose a Management Expenses Levy Limit of £109.8 million for the Financial Services Compensation Scheme for the 2023/24 financial year. This limit comprises a £99.8 million management expenses budget and a £10 million unlevied reserve, representing a £0.7 million decrease from the previous year's total. The proposal aims to ensure sufficient funding for the scheme's operational costs while maintaining a contingency reserve to handle unexpected claim volumes.
Consultation Paper
FCA CP23/3 and
PRA CP1/23
Financial Services Compensation
Scheme – Management Expenses
Levy Limit 2023/24
January 2023
Moving around this document
Use your browser’s bookmarks and tools to navigate.
To search on a PC use Ctrl+F or
Command+F on MACs.
How to respond
We are asking for comments on this Consultation Paper (CP) by 9 February 2023 You can send them to us using the form on our website. Or in writing to:
Prudential & Redress Policy
Financial Conduct Authority
12 Endeavour Square London
E20 1JN
Email:
cp23-3@fca.org.uk
Sign up for our news and publications alerts
See all our latest press releases, consultations and speeches.
Request an alternative format
Please complete this form if you require this content in an alternative format. Contents
Chapter 1
Summary
Why we are consulting and the wider context
1.1 In this Consultation Paper (CP), we – the Financial Conduct Authority (FCA) and
the Prudential Regulation Authority (PRA) – set out proposals for the Management Expenses Levy Limit (MELL) for the Financial Services Compensation Scheme (FSCS) for 2023/24. This CP is supported by the FSCS’s Proposed Budget Update for 2023/24 published alongside this CP.
1.2 The FSCS is a fund of last resort to provide compensation for consumers when financial
services firms fail. Its other functions include:
1.7 The proposed MELL is £0.7 million lower than the 2022/23 MELL of £110.5 million.
1.8 The MELL would apply from 1 April 2023, the start of the FSCS’s financial year, to 31
March 2024.
1.9 More details on the MELL, how it is calculated and an explanation of the FSCS’s unlevied
reserve can be found in Chapter 2 and in the FSCS’s 2023/24 Budget Update. Equality and diversity considerations
1.10 We have considered the equality and diversity issues that may arise from the proposals
in this CP.
1.11 Overall, we do not consider that the proposals materially impact any of the groups with
protected characteristics under the Equality Act 2010. But we will continue to consider the equality and diversity implications of the proposals during the consultation period, and will revisit them when making the final rules. Structure of the CP
1.12 Chapter 2 of this CP contains the proposals for the MELL for 2023/24. The key points
to note in the budget are set out, alongside further detail on the proposals and an explanation of the FSCS’s unlevied reserve. How the budget is allocated between the FCA and the PRA funding classes is also provided and explained in Appendix 4.
1.13 Annex 2 of this CP contains an analysis of the costs and benefits of the proposed rules
as required under FSMA. The FCA’s and the PRA’s consideration of the compatibility of the proposed rules with their respective statutory objectives (including the secondary competition objective) and regulatory principles is also provided and explained in
Annex 3. The FCA and the PRA also assess whether they have carried out their duty
to have due regard to the need to eliminate discrimination and to promote equality of opportunity in carrying out their policies, services and functions. Next steps
1.14 This consultation closes on 9 February 2023. Please send any comments on the
proposed MELL using the online response form on the FCA’s website.
1.15 The FCA is accepting responses on behalf of both the FCA and the PRA, and both
authorities will consider the responses.
1.16 Subject to the responses to this consultation, the FCA will then issue a Handbook Notice
and the PRA will publish a Policy Statement so that final rules can be in place for the start of the FSCS’s financial year on 1 April 2023.
Chapter 2
Proposals for the MELL 2023/24
2.1 In this chapter, we set out the proposals for the FSCS’s MELL for 2023/24. The MELL
covers the costs of operating the compensation scheme. It is the maximum amount, without further consultation and rule-making by the FCA and the PRA, that the FSCS can levy in a year for its operating costs to fulfil the obligations imposed on it by FSMA and set out in the FCA and the PRA rules. These comprise of the COMP and FEES 6 section of the FCA Handbook and the Depositor Protection Part, the Policyholder Protection Part, and the Management Expenses in Respect of the Relevant Schemes
Part of the PRA Rulebook.
2.2 The MELL has two components: the management expenses budget and an unlevied
reserve (contingency reserve). The MELL does not include compensation costs which are levied separately and are determined by the FSCS. Paragraphs 2.12-2.14 give further details on this.
2.3 The FSCS’s actual expenses for the year may differ from its budget as this will be based
on the total number and type of claims it receives. At the end of the financial year, the FSCS will reconcile the actual expenses for the year against the total amount levied and the allocation across the funding classes.
2.4 Any changes will be reflected by providing rebates or using any unspent levies to reduce
firms’ future levies.
2.5 The proposed rules through which the FCA and the PRA would set the MELL are
in Appendices 1 and 2 respectively. Both the FCA Board and Prudential Regulation Committee (PRC) considered the proposals for the MELL and gave approval for the consultation. Management expenses budget
2.6 The proposed management expenses budget for 2023/24 is £99.8 million. The
management expenses budget covers the FSCS’s ongoing operating costs, and includes IT, staff, outsourcing, legal and claims handling costs. Appendix 3 provides a breakdown of management expenses by line item.
2.7 The management expenses budget represents an increase of 5% (£4.3 million) over
the 2022/23 management expenses budget of £95.5 million. Most of the increase can be attributed to a £3.9 million increase to the FSCS’s proposed spend in the area of investments (see paragraph 2.21). There is also an increase of £3.2 million in controllable costs, the key drivers of which are mainly related to increased staff costs (see paragraph 2.22) and communication costs that will support efforts to increase awareness of the FSCS.
2.8 The FSCS recognises that it needs to use its resources in the most economical and
efficient way. It is committed to delivering a high level of service, while keeping its costs as low as possible. Unlevied (contingency) reserve
2.9 The unlevied reserve (otherwise known as the contingency reserve) is an important
part of the FSCS’s approach to management expenses and ensures that in the event
of increasing claims volumes the FSCS can continue to fulfil its statutory obligations. It allows the FSCS to raise additional funds at short notice to meet costs that were not foreseen or planned for when the management expenses levy was raised. The unlevied reserve can be levied without further consultation by the FCA and the PRA.
2.10 The proposed unlevied reserve for 2023/24 is £10 million, which is £5 million lower than
the reserve of the current and previous financial year. The uncertainty caused by the Covid-19 pandemic caused challenges in accurately forecasting claims volumes and, as a result, the unlevied reserve was increased to £15 million in 2021/22 and remained at the same level for 2022/23. However, the FSCS did not use any of its unlevied reserve in 2021/22 and it is not expecting to use it this year as claims volumes and associated costs have been lower than budget. The unlevied reserve was last used in 2020/21 when it was set at £5 million.
2.11 The FSCS is mindful of the current economic situation and has indicated that it does
not want to levy more than is required upfront. It has considered the certainty of events and has included only firm failures where there is good intelligence that they will arise in 2023/24, while ensuring it can be flexible to address any unexpected increases in claims volumes. The FSCS has reviewed the level of unlevied reserve required and considers that £10 million is an appropriate level for the reserve. The FSCS accepts that there is a greater risk of requiring access to the unlevied reserve in 2023/24 than in previous years. Compensation costs
2.12 The FSCS’s compensation costs levy, which covers compensation paid to consumers,
is determined separately by the FSCS and does not form part of this consultation. It is directly linked to the level of compensation claims received from consumers and agreed for pay-out.
2.13 The FCA recognises the problem that high costs have for firms, especially in the
current challenging economic climate and continues to work to reduce the impact of firm failures with a longer-term aim of lowering future compensation costs. In December 2022, the FCA published a Feedback Statement as part of its review of the compensation framework. The feedback statement provides an overview of the
feedback received to the FCA’s previous discussion paper and sets out next steps for the Compensation Framework Review. This includes ongoing work to tackle the underlying causes of high FSCS compensation costs to bring down the compensation costs falling to industry levy payers and to reduce the harm suffered by consumers upon firm failure.
2.14 The FSCS will indicate its current estimate of compensation costs and its related
funding and levies in its 2023/24 Budget Update, due to be published on 12 January 2023, and confirm the final levies in spring 2023. Management Expenses Budget further detail
2.15 In this section, the FSCS’s proposed management expenses budget is broken down by
activity, with information on the main changes from last year’s budget. The FSCS has distinguished between volume and complexity driven costs (costs sensitive to changes in claim volumes and type) and controllable costs (costs which are not sensitive to changes in claims volumes). In addition, investment costs, which the FSCS defines as costs required to deliver on its statutory objectives, priorities and strategic ambition for the next 3 years, have been factored into its budget proposals as part of its multi-year investment programme.
2.16 The proposed budget includes a £3.9 million increase in investment spend compared
to 2022/23. Controllable costs are increasing by 5.8%, which is £1.5 million below the agreed target of keeping controllable costs within flat real, after adjusting for inflation at 8.6% (Source: Office of National Statistics (ONS) September 2022).
2.17 The proposed increase to the investment budget is driven by the FSCS’s ambition
to deliver the strategic aims of the organisation. The FSCS is seeking to improve its operational efficiency and its efforts to help reduce the levy burden on industry through better consumer outcomes. The FSCS recognises that the environment it currently operates in has changed considerably over recent years. In particular, it now requires an enhanced claims handling model with supporting processes and technologies to efficiently process the more complex claims it is now seeing in areas such as defined benefit pension transfer, self-invested personal pensions (SIPP) operators and EEA (European Economic Area) firms. The key initiatives from this investment budget will enable the FSCS to evolve and meet the challenges and future demands of its customers and stakeholders. This is discussed in more detail in paragraph 2.21.
2.18 The FSCS is currently forecasting an underspend of £6.3 million compared to the
2022/23 management expenses budget of £95.5 million. If this forecast materialises these funds will be used to offset the levy for the relevant classes in 2023/24.
Table 1: Management expenses: Activity-based costing (£million)
ABC Category 2023/24 Budget 2022/23 Budget Variance Budget Controllable costs Volume and complexity driven Investments Budget Controllable costs Volume and complexity driven Investments Total Total % Claims handling infrastructure and support
75.9 41.9 34.0 - 74.2 37.4 36.8 - 1.7 2%
Outsourced claims handling
13.7 - 13.7 - 21.7 - 21.7 - -8.0 37%
Internal claims processing
22.9 6.1 16.8 - 18.9 6.3 12.6 - 4.1 22%
Core support:
IT, facilities and central services
39.3 35.9 3.4 - 33.7 31.1 2.6 - 5.6 17%
Funding readiness
8.0 8.0 - - 8.0 8.0 - - - 0%
Protection, recoveries, investment and pension deficit
15.9 8.0 - 7.9 13.3 9.3 - 4.0 2.6 19%
Consumer protection
0.8 0.8 - - 0.9 0.9 - - -0.1 11%
Depositor protection
3.8 3.8 - - 3.5 3.5 - - 0.2 6%
ABC Category 2023/24 Budget 2022/23 Budget Variance Budget Controllable costs Volume and complexity driven Investments Budget Controllable costs Volume and complexity driven Investments Total Total % Recoveries 2.7 2.7 - - 3.0 3.0 - - -0.3 11% Investment 7.9 - - 7.9 4.0 - - 4.0 3.9 97% Pension deficit funding
0.8 0.8 - - 1.9 1.9 - - -1.1 58%
Total management expenses
99.8 57.9 34.0 7.9 95.5 54.7 36.8 4.0 4.3 5%
Key points to highlight
2.19 Claims-handling infrastructure and support: This makes up the largest part of the
management expenses budget, amounting to £75.9 million or 76% of the total budget and allows the FSCS to carry out its core function of handling claims following firm failure.
the level of claims processed internally, thereby building on the FSCS’s internal capacity and capability to process complex claims.
– To improve the FSCS’s security posture to deal with emerging cyber and security threats. – Insight and Data (proposed £1.8 million spend):
– Mainly to develop the FSCS’s data and insight, policy and stakeholder capability to identify where the most impact can be made in preventing consumer harm. – To complete transformation of the consumer awareness measures and revise the ‘FSCS protected’ materials for the first time in a decade. Staff Costs
2.22 Staff costs are included within the activity-based spending categories. The FSCS
proposes a staff budget of £31.9 million, an increase of £4.7 million on last year. This will facilitate an increase in staff headcount of 17 full-time equivalent (FTE) and provide a headline 4% for pay inflation, which will be focused on areas with greater retention risk and the lower paid. 2% of the staff budget is allocated to one-off and targeted support to address recruitment hot spots and the cost-of-living challenges.
2.23 As noted above the FSCS is planning an increase of 17 full-time equivalent (FTE) staff
made up of 6 apprenticeship roles, with other roles predominately to support capabilities in areas such as stakeholder engagement, cyber security, data management and service management. A number of roles in Legal, Data and Technology and Customer Support are being proposed to enhance internal capability and reduce reliance on expensive external consultancy costs. Budget allocation
2.24 The management expenses budget component of the MELL is made up of:
2.27 The proposed reduction in the FCA funding class allocation is mainly due to a projected
71% reduction to the General Insurance Distribution class reflecting the continuing reduction of Payment Protection Insurance claims volumes. The proposed increase in PRA classes is due to the increased internal capability to handle claims in the General Insurance Provision class to deal with new failures (e.g. MCE Insurance Company), and to deal with the number of firms in run off (currently 29).
2.28 Further information on the FSCS’s proposed management expenses budget is in its
2023/24 Budget Update published on 12 January 2023 on the FSCS website.
Annex 1
Questions in this paper
Q1: Do you have any comments on the proposed FSCS MELL for 2023/24?
Annex 2
Cost benefit analysis
Introduction
also important given the number of pension related failures so that consumers do not lose their retirement income.
7. Compensation pay-outs are partially offset by the recoveries made by the FSCS from
the estates of failed firms or from third parties responsible for the losses. Costs
8. The one-off direct costs to firms are equal to the budget of £99.8 million. The MELL will
be split between the FCA and the PRA funding classes and levied on all authorised firms according to the volume of regulated financial services business they conduct. Appendix 4 provides a summary of how the MELL costs are allocated between the FCA and the PRA classes.
9. Management expenses are charged to firms and may be passed on to consumers in the
form of higher prices.
10. The unlevied reserve of £10 million, which is only invoiced to industry levy payers if
needed, gives the FSCS some margin to meet costs that exceed its budgeted expenses and that need to be funded at short notice. The FSCS needs to be able to respond quickly and efficiently to firm failures. Should the FSCS require funding beyond the limit imposed by the MELL due to exceptional circumstances, the FCA and the PRA would urgently consider the request. Summary
11. The FCA and the PRA consider that the benefits of raising the MELL outweigh the costs
placed on industry primarily because the provision of compensation in the event of the failure of a financial services firm helps to ensure consumer confidence in the financial system and, where compensation is paid, reduces financial harm.
Annex 3
Compatibility statement
Compliance with legal requirements
This Annex records the FCA’s and the PRA’s compliance with a number of legal
requirements applicable to the proposals in this consultation, including an explanation of the FCA’s and the PRA’s reasons for concluding that our proposals in this consultation are compatible with certain requirements under FSMA. The FCA’s objectives and regulatory principles: Compatibility statement
When consulting on new rules, the FCA is required by section 138I(2)(d) FSMA to include
an explanation of why it believes making the proposed rules is (a) compatible with its general duty, under s. 1B(1) FSMA, so far as reasonably possible, to act in a way which is compatible with its strategic objective and advances one or more of its operational objectives, and (b) its general duty under s. 1B(5)(a) FSMA to have regard to the regulatory principles in s. 3B FSMA (see paragraphs 9 to 13).
The FCA considers that the proposals set out in this consultation are compatible with
the statutory objectives. They are primarily intended to advance the FCA’s operational objective of consumer protection.
The role of the FSCS is, in general, to provide compensation to consumers of financial
products when authorised firms are unable, or likely to be unable, to meet their obligations. A compensation scheme provides a safety net, offering protection to consumers, which in turn leads to greater confidence in their dealings with financial services firms, benefitting all firms and leading to a stronger financial system. If the FSCS was unable to process claims because of financial constraints due to an inappropriate MELL this would undermine the protection offered to consumers.
The proposal is also considered to be compatible with the FCA’s competition duty to
promote effective competition in the interests of consumers. Any levy placed on a firm because of this proposal will take into account the firm’s size, and as such is not likely to disadvantage specific groups of firms, in particular smaller firms.
Subject to this consultation, the FCA considers that the proposed FSCS MELL is
appropriate. The limit proposed ensures the FSCS has adequate resources to perform its functions for the coming year. In addition, in setting the MELL for 2023/24, the FCA and the PRA have allowed for sufficient unlevied reserve to prevent disruption to the FSCS’s work if it needs to exceed its operating budget for unexpected reasons.
When consulting on new rules, the FCA is also under a duty to discharge its general
functions in a way which promotes effective competition in the interests of consumers (s. 1B(4) FSMA). This duty applies in so far as promoting competition is compatible with advancing the FCA’s consumer protection and/or integrity objectives.
Setting a FSCS MELL has no material significance for the reduction of financial crime
objectives.
In preparing the proposals set out in this consultation, the FCA has had regard to the
regulatory principles set out in s. 3B FSMA. The FCA believes that the proposed MELL is compatible with these regulatory principles. The regulatory principles most relevant to this proposal are:
The PRA’s objectives analysis
16. Under s.2H(2) of FSMA, in discharging its general functions, the PRA must also have
regard to the regulatory principles in s.3B.
17. When consulting on proposed new rules, the PRA is required by s. 138J(2)(d) of FSMA to
include an explanation of why it believes making the proposed rules is compatible with duties in relation to its general functions.
18. The PRA, under s. 2B FSMA, must, when discharging its general functions, so far as is
reasonably possible, act in a way that advances its general objective – i.e. promoting the safety and soundness of PRA-authorised firms.
19. The PRA must carry out that objective primarily by:
‘Have Regards’ analysis
24. In developing these proposals, the PRA has had regard to the FSMA regulatory
principles and the aspects of the Government’s economic policy set out in the Treasury recommendations letter of 8 December 2022. The following factors, to which the PRA is required to have regard, were significant in the PRA’s analysis of the proposals:
Equality and diversity
26. We are required under the Equality Act 2010 in exercising our functions to ‘have due
regard’ to the need to eliminate discrimination, harassment, victimisation and any other conduct prohibited by or under the Act, advance equality of opportunity between persons who share a relevant protected characteristic and those who do not, and to foster good relations between people who share a protected characteristic and those who do not.
27. As part of this, we ensure the equality and diversity implications of any new policy
proposals are considered. We do not consider that the proposals adversely impact any of the groups with protected characteristics under the Equality Act 2010. However, we would welcome any comments respondents may have on any equality issues they believe arise as a result of these proposals.
Annex 4
Abbreviations used in this paper
Abbreviation Description
ABC Activity-based costing
CBA Cost benefit analysis
CP Consultation Paper
EEA European Economic Area
FCA Financial Conduct Authority
FEES Fees manual
FSCS Financial Services Compensation Scheme
FSMA Financial Services and Markets Act 2000
FTE Full time equivalent
IDOBI Improving Depositor Outcomes in Bank Insolvency LRRA Legislative and Regulatory Reform Act 2006 MELL Management expenses levy limit ONS Office of National Statistics PRA Prudential Regulation Authority PRC Prudential Regulation Committee SIPP Self-invested personal pensions
We make all responses to formal consultation available for public inspection unless the respondent requests otherwise. We will not regard a standard confidentiality statement in an email message as a request for non-disclosure. Despite this, we may be asked to disclose a confidential response under the Freedom of Information Act 2000. We may consult you if we receive such a request. Any decision we make not to disclose the response is reviewable by the Information Commissioner and the Information Rights Tribunal. All our publications are available to download from www.fca.org.uk. Request an alternative format Please complete this form if you require this content in an alternative format. Sign up for our news and publications alerts
Appendix 1
FCA Draft Handbook text
FCA 2023/XX
FINANCIAL SERVICES COMPENSATION SCHEME (MANAGEMENT EXPENSES LEVY LIMIT 2023/2024) INSTRUMENT 2023 Powers exercised A. The Financial Conduct Authority (“the FCA”) makes this instrument in the exercise of the following powers and related provisions in the Financial Services and Markets Act 2000 (“the Act”):
(1) section 137T (General supplementary powers); (2) section 213 (The compensation scheme); (3) section 214 (General); and (4) section 223 (Management expenses). B. The rule-making powers listed above are specified for the purposes of section 138G(2) (Rule-making instruments) of the Act. Commencement
C. This instrument comes into force on [date].
Amendments to the Handbook
D. The Fees manual (FEES) is amended in accordance with the Annex to this instrument.
Citation
E. This instrument may be cited as the Financial Services Compensation Scheme (Management Expenses Levy Limit 2023/2024) Instrument 2023. By order of the Board [date]
FCA 2023/XX
Annex
Amendments to the Fees manual (FEES)
In this Annex, underlining indicates new text.
6 Financial Services Compensation Scheme Funding … 6 Annex 1R Financial Services Compensation Scheme - Management Expenses Levy Limit This table belongs to FEES 6.4.2R Period Limit on total of all management expenses levies attributable to that period (£) … 1 April 2022 to 31 March £110,473,324 1 April 2023 to 31 March £109,815,710
Appendix 2
PRA Draft rulebook text
PRA RULEBOOK: NON-AUTHORISED PERSONS: FSCS MANAGEMENT EXPENSES LEVY LIMIT AND BASE COSTS INSTRUMENT 2023 Powers exercised A. The Prudential Regulation Authority (“PRA”) makes this instrument in the exercise of the following powers and related provisions in the Financial Services and Markets Act 2000 (“the Act”):
(1) section 137T (General supplementary powers); (2) section 213 (The compensation scheme); (3) section 214 (General); and (4) section 223 (Management expenses). B. The rule-making powers referred to above are specified for the purpose of section 138G(2) (Rulemaking instrument) of the Act. Pre-conditions to making
C. In accordance with section 138J of the Act (Consultation by the PRA), the PRA consulted the
Financial Conduct Authority. After consulting, the PRA published a draft of proposed rules and had regard to representations made. PRA Rulebook: Non-Authorised Persons: FSCS Management Expenses Levy Limit and Base Costs Instrument 2023 D. The PRA makes the rules in the Annex to this instrument. Commencement E. This instrument comes into force on 1 April 2023. Citation F. This instrument may be cited as the PRA Rulebook: Non-Authorised Persons: FSCS Management Expenses Levy Limit and Base Costs Instrument 2023. By order of the Prudential Regulation Committee [DATE]
Annex
Amendments to the FSCS Management Expenses Levy Limit and Base Costs Part In this Annex new text is underlined and deleted text is struck through. ... 2 LIMIT ON MANAGEMENT EXPENSES LEVIES
2.1 The total of all management expenses levies attributable to the period 1 April 2022 to 31 March
2023 of the deposit guarantee scheme or the policyholder protection scheme may not exceed £110,473,324 less whatever management expenses levies the FSCS has imposed in accordance with FCA compensation scheme rules attributable to that period. [Deleted] 2.1A The amount which the FSCS may recover from the sums levied under the compensation scheme as management expenses attributable to the period 1 April 2023 to 31 March 2024 may not exceed £109,815,710.
2.2 This amount is the combined limit in respect of the deposit guarantee scheme, the policyholder
protection scheme and the FCA compensation scheme rules.
…
Appendix 3
FSCS management expenses line by line
Budget: Significant items (£m) 2023/24 2022/23 change % change Staff costs (including contractors) 42.7 33.4 9.3 28% Staff costs 31.9 27.2 4.7 17% Contractors 10.8 6.2 4.6 74% Communications 4.4 3.8 0.6 16% Professional, legal and recovery costs
11.5 11.6 -0.1 -0.9%
Outsourced claims handling 14.1 22 -7.9 -36%
Outsourced claims 13.6 21.4 -7.8 -36%
Outsourced printing 0.5 0.6 -0.1 -16%
Investment 7.9 4 3.9 97%
Customer 4.2 1 3.2 320%
Technology 1.9 1.9 0 0%
Insight and Data 1.8 1.1 0.7 63%
Credit facility 8 8 0 0%
Pension deficit funding 0.8 1.9 -1.1 -58%
Facilities, IT and overheads 11.4 10.7 0.7 6% Facilities 2.4 2.2 0.2 9% IT 6.5 6.0 0.5 8% Depreciation 1.4 1.4 0 0% Other/contingency 0.5 0.5 0 0% External providers 0.6 0.6 0 0% Interest income -0.9 0 0.9 - Total management expenses 99.8 95.5 4.3 5%
Appendix 4
FSCS management expenses by funding class
2023/24 2022/23 Movement
FSCS total costs
£m
PRA fee block allocation
£m
FCA fee block allocation
£m
FSCS total costs
£m
PRA fee block allocation
£m
FCA fee block allocation
£m
FSCS total costs
£m
PRA fee block allocation
£m
FCA fee block allocation
£m
Base costs total (split
50:50)
38.3 19.2 19.2 29.9 15.0 15.0 28% 28% 28%
Specific costs
Deposits 14.1 0% 0%
General
Insurance
Provision
7.6 7.6 7.2 7.2 6% 6%
Life and
Pension
Provision
General
Insurance
Distribution
1.7 1.7 5.9 5.9 -71% -71%
Life
Distribution and
Investment
Intermediation
30.3 30.3 27.7 27.7 9% 9%
2023/24 2022/23 Movement
FSCS total costs
£m
PRA fee block allocation
£m
FCA fee block allocation
£m
FSCS total costs
£m
PRA fee block allocation
£m
FCA fee block allocation
£m
FSCS total costs
£m
PRA fee block allocation
£m
FCA fee block allocation
£m
Investment
Provision
7% 7% 9.7 9.7 -27% -27%
Home Finance
Intermediation
0.8 0.8 1.0 1.0 -18% -18%
Debt
Management
Specific costs total
61.5 21.7 39.8 65.6 21.2 44.3 -6% 2% -10%
Management
Expenses total
99.8 40.8 59.0 95.5 36.2 59.3 5% 13% 0%
© Financial Conduct Authority 2023
12 Endeavour Square London E20 1JN
Telephone: +44 (0)20 7066 1000
Website: www.fca.org.uk
All rights reserved
Pub ref: 007976
Note from RegAlert. AI assistants can read this document in full, and search 70,000+ more, through the RegAlert MCP connector (https://mcp.regalert.today/mcp). Free with an account. How to connect ChatGPT, Claude or Cursor.
The documents this one cites, and the documents that cite it.
“Sections 138I and 138J FSMA, as amended by the Financial Services Act 2012, require the FCA and the PRA to publish a cost benefit analysis (CBA).”
“Under section 223 (1) of the Financial Services and Markets Act 2000 (FSMA), a limit must be set for the total management expenses that the FSCS can levy on financial services firms.”
“Overall, we do not consider that the proposals materially impact any of the groups with protected characteristics under the Equality Act 2010.”
More like this from FCA
FCA published 10 documents in the last 30 days. We email you each new one the day it's published.
Source: Financial Conduct Authority — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works
In RegAlert: added · updated