2020-12-28
Added · Updated
The Council of the Central Bank of Montenegro mandates that credit institutions develop, submit, and maintain comprehensive recovery plans to restore financial stability during periods of severe distress. The regulation prescribes mandatory plan structures, including governance protocols, strategic analyses of critical functions, and predefined recovery options activated by specific capital, liquidity, profitability, and market indicators. Institutions must embed these metrics into their risk management frameworks, continuously monitor them for early warning signals, and immediately notify the regulator upon threshold breaches or decisions to implement or defer recovery actions.
CBCG published 8 documents in the last 30 days — get each new one by email the day it lands.
Pursuant to Article 44 paragraph (2) item 3) of the Central Bank of Montenegro Law (OGM 40/10, 46/10, 6/13, 70/17) and Article 125 paragraph (9) of the Law on Credit Institutions (OGM, 72/19), the Council of the Central Bank of Montenegro, at its meeting held on 28 December 2020, passed the following D E C I S I O N ON RECOVERY PLANS OF CREDIT INSTITUTIONS
I. BASIC PROVISIONS
Subject matter
Article 1
This Decision shall govern in more detail the method and scope of application of the requirements related to the drawing up of a credit institution recovery plans, as well as the contents, method and timeframes for submission of these plans and amendments to the contents of recovery plans following the assessment of recovery plans performed by the Central Bank of Montenegro (hereinafter: the Central Bank). Definitions
Article 2
Terms used in this Decision shall have the following meanings:
recovery options mean activities, agreements, measures or strategies of a credit
institution or a group covered by a recovery plan that are designed to restore financial stability in situations of a severe financial distress;
situations of a severe financial distress mean situations which threaten the
financial intermediation function of a credit institution to the point of its market survival , i.e. its further undisturbed provision of services for which it is authorised and which may be caused by an external or an internal event;
material change means each change which has the potential to affect the ability
of a credit institution to implement a recovery plan or to apply one or more recovery options envisaged in the recovery plan;
critical functions means activities, services or operations the discontinuance of
which is likely in one or more states, to lead to the disruption of services that are essential to the real economy or to disrupt financial stability due to the size, market share, external and internal interconnectedness, complexity or cross-border activities of an institution or group, with particular regard to the substitutability of those activities, services or operations;
core business lines means business and associated services which represent
material sources of revenue, profit or franchise value for a credit institution or for a group of which a credit institution forms part.
a significant obstacle means any factor that may adversely affect the timely
execution of the recovery option, in particular legal, operational, business, financial and reputational risk, as well as any other risk that may result in a downgrade of the credit institution’s credit rating;
early warning signals means benchmarks which constitute a part of the internal
risk management process of a credit institution or a group of credit institutions and which are used to monitor its financial condition;
recovery plan indicators means qualitative or quantitative indicators established
by a credit institution to identify points at which appropriate actions specified in the recovery plan can be taken, or which if they reach a certain level indicate that appropriate recovery options can be taken to preserve or re-establish sustainable business and satisfactory financial position of the credit institution;
reverse stress-testing means a form of stress testing which is based on the
possible results of a near-default and identifies circumstances that might cause this to occur. 10)significant credit institution means a credit institution whose average amount of assets at the end of previous three business years stated in the revised financial statements exceeds 250,000 euros;
significant branch or other entity means a branch of a credit institution or other
entity that:
a brief overview (hereinafter: summary) of the key elements of the plan and a
summary of total capacity of the credit institution for recovery, including the content specified in Article 4 of this Decision;
information on governance including the content specified in Article 5 of this
Decision;
a strategic analysis, in accordance with Article 15 of this Decision;
a communication and disclosure plan, in accordance with Article 19 of this
Decision;
an analysis of preparatory measures contained in the recovery plan, in accordance
with Article 20 of this Decision.
(2) Parts of the recovery plan referred to in paragraph (1) of this Article are separate, specially marked and described units of the plan. Summary of key elements of the plan
Article 4
The summary of key elements of the recovery plan referred to in Article 3 item 1) of this Decision shall contain a brief overview of:
information on governance, including selected recovery plan indicators and
established levels for considering the taking of measures from the recovery plan;
strategic analyses, including a summary of recovery options, identified key
functions and main business lines, while indicating scenarios with possible obstacles and options that are adequate for recovery in those scenarios;
all material changes in the credit institution, group of credit institutions, or recovery
plan, which occurred after the submission of the latest recovery plan to the Central Bank;
a communication and disclosure plan, with a description of how the credit
institution intends to address possible adverse market reactions; and
preparatory measures specified in the recovery plan.
Information on governance
Article 5
A part of the recovery plan referring to information on governance shall include a detailed explanation of how the recovery plan is included in the corporate governance system and risk management system of a credit institution, policies and procedures establishing the manner of drawing up, updating and approving the recovery plan, and identifying persons responsible for drawing up and implementing the recovery plans, in particularly the description of:
the manner of drawing up and updating the recovery plan, including at least:
the role and the functions of the persons responsible for the drawing up,
implementing and updating of each part of the plan and of the plan as a whole;
procedures in situations where the recovery plan needs to be amended due to
material changes which affect the credit institution, its group or the environment in which they operated,
a description of how the recovery plan is integrated in the corporate governance
and in the overall risk management framework of the credit institution or its group, in particular as regards its risk profile, and the link between the recovery plan and stress testing in the internal capital adequacy assessment process (hereinafter: ICAAP);
where a recovery plan is drawn up for a group of credit institutions, a description
of measures taken and arrangements concluded on a group level which ensure the coordination and consistency of recovery option of a group as a whole and each subsidiary;
the recovery plan provides a satisfactory, precise and detailed explanation why these indicators are not adequate in relation to the legal structure, risk profile, size and complexity of the business operations of that credit institution. (4) A credit institution shall include in the recovery plan at least one indicator from each mandatory category referred to in paragraph (1) of this Article, and it shall consider including other specific additional indicators given in Table 3 of Annex 1 which forms an integral part of this Decision. (5) When establishing indicators, a credit institution must take into account that the nature and number of indicators correspond to its size, complexity of operations, risk profile and system of indicators used in the process of regular risk management. (6) Recovery plan indicators that the credit institution includes in a recovery plan must be qualitative and quantitative and easily monitored, and the prescribed level of each individual indicator must be higher than the minimum prescribed level and high enough to provide consideration of measures from the recovery plan before breaching regulations governing these indicators, and/or it must be determined in such a way as to enable the credit institution to take recovery measures in a timely manner. (7) Recovery plan indicators of the credit institution referred to in paragraphs (1) and (3) of this Article shall relate to the financial position of a credit institution in case of an individual recovery plan, or to the financial position of a group of credit institutions in case of a group recovery plan. (8) Recovery plan indicators shall be consistent with the indicators used by the credit institution or a group in the risk management process. Capital indicators
Article 7
(1) When choosing capital indicators a credit institution shall take into account indicators that will indicate in a timely manner a significant actual or likely future decrease in capital and an increase in financial leverage. (2) A credit institution shall include indicators from paragraph (1) of this Article into the Internal Capital Adequacy Assessment Process (ICAAP) and its existing risk management framework. (3) The capital indicators thresholds must be calibrated based on the credit institution’s risk profile and on the time needed to activate the recovery measures; taking into consideration the recovery capacity resulting from those measures, and taking into account how quickly the capital situation may change, given the credit institution's individual circumstances. (4) When establishing capital indicators thresholds referred to in paragraph (3) of this
Article, a credit institution shall ensure a sufficient distance from a breach of the capital
requirements applicable to the credit institution, including minimum requirements set out in Article 134 of the Law on Credit Institutions (hereinafter: the Law), but without taking into account any buffer requirements. Liquidity indicators
Article 8
(1) In the framework of liquidity indicators, a credit institution shall include as a minimum:
from operational risk.
(2) Notwithstanding paragraph (1) of this Article, a credit institution may exclude any of the liquidity indicators referred to in that paragraph, if it explains in the recovery plan in a satisfactory manner, precisely and in detail why those indicators are not adequate with respect to its legal structure, risk profile, size and/or complexity of business operations. (3) Profitability indicators related to operational risk can have a significant impact in terms of profit and loss, including external and internal fraud as well as other similar events. Asset quality indicators
Article 10
(1) When determining the framework of asset quality indicators, a credit institution shall include as a minimum the growth rate of bad loans in total loans and the coverage of these loans by value adjustments. (2) A credit institution shall make sure that the indicators referred to in paragraph (1) of this Article also indicate the quality of off-balance sheet exposures of the credit institution and the impact of bad loans on the overall asset quality. (3) Notwithstanding paragraph (1) of this Article, a credit institution may exclude any of the asset quality indicators referred to in that paragraph, if it explains in the recovery plan in a satisfactory manner, precisely and in detail why those indicators are not adequate with respect to its legal structure, risk profile, size and/or complexity of business operations. Market indicators
Article 11
A credit institution shall establish a framework of qualitative and quantitative market indicators based on the following indicators:
Macroeconomic indicators
Article 12
(1) A credit institution shall establish macroeconomic indicators on measurements that affect the credit institution's performance in certain geographical areas or business sectors that are relevant to the credit institution. (2) Macroeconomic indicators referred to in paragraph (1) of this Article include:
(5) A credit institution shall examine the efficiency of selected indicators and the selected level of their values at least annually. Monitoring of indicators in the recovery plan
Article 14
(1) A credit institution shall establish an adequate system of regular monitoring of selected indicators and adopt an internal act containing the dynamics and the manner of monitoring, as well as the procedure for reporting on indicators. (2) For the purposes of paragraph (1) of this Article, a credit institution shall consider using progressive metrics ("traffic light approach") in order to inform the management board of that such indicators could potentially be reached. (3) If a credit institution, through regular monitoring, determines that the selected indicators have reached the level determined for taking measures from the recovery plan, the management board of the credit institution shall make a decision on taking or refraining from taking measures from the recovery plan within five working days, and notify the Central Bank of that decision without delay. (4) If the management board of a credit institution makes a decision referred to in paragraph (3) of this Article to refrain from taking measures from the recovery plan, the credit institution shall explain such decision in detail in the notification to the Central Bank. (5) The management board of a credit institution may make a decision on undertaking the options from the recovery plan even if the established indicators have not reached the level determined for taking measures. (6) A credit institution shall notify the Central Bank without delay of the decision referred to in paragraph (5) of this Article. Strategic analysis
Article 15
(1) In a strategic analysis, a credit institution shall determine core business lines and critical functions and determine the procedures necessary to maintain their functioning in situations of a severe financial distress. (2) A credit institution shall determine the key functions and lines of business at the appropriate level of granularity (e.g.: retail deposits, retail loans, corporate deposits, and the like). (3) When determining key functions, a credit institution shall perform an analysis of:
the impact of the termination of the provision of that service on third parties and
the financial system as a whole;
market concentrations in relation to the termination of the provision of that service;
and
the possibility for the provision of the service in question to be taken by another
service provider in a comparable scope and quality, at an acceptable cost for the client and within an appropriate period. (4) The strategic analysis of a credit institution contained in the recovery plan shall include the following:
information on a credit institution and members of a group to which the recovery
plan relates, with the contents as established in Article 16 of this Decision; and
recovery options, with the contents as established in Article 17 of this Decision.
Information on credit institutions and group members
Article 16
(1) Information on a credit institution and members of a group to which recovery plans referred to in this Decision relate shall include the following:
general information on a credit institution and members of a group covered by the
recovery plan, including:
intervention phase.
Contents of recovery options
Article 18
(1) In the section of the plan relating to recovery options, a credit institution shall list all recovery options and provide a description and analysis of each option and define what level of the selected indicator envisages taking such options. (2) The recovery options shall contain, for individual option, an overview of the following envisaged activities, agreements, measures or strategies:
a significant credit institution may, when drawing up a recovery plan, leave out some of the listed activities, agreements or measures and provide a detailed explanation why these have been left out. (6)The recovery options shall contain an assessment of the impact or each individual recovery option, including the following:
an assessment of the financial and operational impact, indicating the expected
impact on solvency, liquidity, sources of financing, profitability and business of the credit institution or a member of a group for which a recovery plan is being drawn up, and which is affected by an option;
an assessment of the external impact and an assessment of systemic
consequences, indicating the expected impact on critical functions of a credit institution and members of a group covered by the recovery plan and their impact on shareholders, clients and in particular small depositors, other counterparties, and, where applicable, the rest of the group;
valuation assumptions and all other assumptions necessary for the assessment of
items 1) and 2) of this paragraph, including the assumption of asset marketability and behaviour of other entities on the financial market. (7) The assessment of the impact referred to in paragraph (6) of this Article shall include a detailed description of the procedures for determining the value and marketability of core business lines, the part of business operations and assets of a credit institution or members of a group covered by the recovery plan. (8)The recovery options shall contain an assessment of the feasibility of each individual recovery option, in particular:
an assessment of the risk associated with an individual recovery option, based on
experience in the implementation of such a recovery option or similar measures;
a detailed analysis and a description of material obstacles to an efficient and timely
implementation of the plan and a description of the manner in which such obstacles may be removed;
an analysis of the possible obstacles to efficient implementation of each individual
recovery option which arises from the structure of the group or intra-group agreements, including the existence of a material practical or legal obstacle to a prompt transfer of own funds, settlement of liabilities or realisation of assets within a group (in case of a group recovery plan) and the description of the manner in which these obstacles can be removed; and
an assessment of the manner of ensuring business continuity every time an
individual recovery option is used.
(9) The assessment of business continuity referred to in paragraph (8) item 4) of this
Article shall include an analysis of internal activities (e.g. information systems, human
resources, public procurement) and access of the credit institution or members of a group covered by a recovery plan to market infrastructure (such as access to clearing and settlement as well as to payment system), and the assessment of operational contingency shall take into account:
any arrangements and measures necessary to maintain continuous access to
relevant financial markets infrastructure;
any arrangements and measures necessary to maintain the continuous functioning
of the operational processes of the credit institution or group members covered by the recovery plan, including infrastructure and IT services;
necessary and expected timeframe for the implementation and effectiveness of
each recovery option; and
effectiveness of recovery options and adequacy of indicators in a range of
scenarios of financial stress which assesses the impact of each of these scenarios on the credit institution or group member, in particular on their capital, liquidity, profitability, risk profile and operations, potential impact of each individual option, feasibility of recovery options as well as potential impediments to their implementation. (10) The assessment of business continuity shall determine the recovery options of the credit institution and members of a group covered by the recovery plan that could be implemented in a certain scenario, possible impact of that recovery option, its feasibility, obstacles to its implementation and the time frame for its implementation in the conditions of a severe financial distress. (11) The group recovery plan shall include mechanisms which ensure coordination and consistent application of the recovery options on the level of the parent company, subsidiary level and, where appropriate, on the level of material branches. Communication and public disclosure plan
Article 19
(1) Communication and disclosure plan referred to in Article 4 paragraph (1) item 4 of this Decision, shall contain a detailed description of the manner how the credit institution shall resolve possible negative reactions of the market, and it shall contain:
an internal communication plan, in particular communication with employees,
unions, workers' councils or other employee representatives;
an external communication plan, in particular communication with shareholders
and other investors, Central Bank, counterparties, financial markets, financial markets infrastructure, depositors, and, where appropriate, with the public; and
effective proposals for managing any potential negative market reactions.
(2) The recovery plan shall also include an analysis of the manner of application of the communication and public disclosure plan in the case of implementation of one or more recovery plan measures or agreements. (3) The communication and public disclosure plan shall also provide for special communication needs associated with a particular recovery option.
Preparatory measures
Article 20
(1) The recovery plan shall include an analysis of the preparatory measures that a credit institution or a group for which a plan is being drawn up has taken, plans to take, or will need to take to facilitate implementation or improvement of the efficacy of the recovery plan, especially for measures that require a longer time period or larger number of activities for their implementation or which call for timely implementation in order to have efficient measure, such as the increase of own funds or sale of different forms of assets. (2) The recovery plan shall define a time frame for the implementation of the preparatory measures referred to in paragraph (1) of this Article. (3) In addition to preparatory measures referred to in paragraph (1) of this Article, the recovery plan shall contain measures for removing the obstacles identified in the recovery plan which are necessary for efficient implementation of the recovery options.
III. RECOVERY PLAN STRESS SCENARIOS
Stress scenarios
Article 21
(1) A credit institution shall, taking into account the nature, scope and complexity of its activities, prepare a range of stress scenarios of a severe macroeconomic and financial distress so as to determine various hypothetical events on which it will test the efficiency of recovery options as well as the adequacy of indicators and their levels determined by the recovery plan. (2) To test a recovery plan, a significant credit institution shall use as a minimum one scenario for each of the following types of events:
Stress testing requirements
Article 22
(1) When preparing the stress scenarios referred to in Article 21 of this Decision, a credit institution shall make sure they meet the following requirements:
Scenario covering events on overall system level
Article 24
(1) When preparing a stress scenario for events on overall system level, a significant credit institution shall take into account, as a minimum, the influence of the following events:
IV. SCOPE OF APPLICATION AND DRAWING UP THE RECOVERY PLAN
Recovery plan scope
Article 26
(1) A significant credit institution shall apply all the provisions of this Decision in their entirety. (2) A non-significant credit institution may reduce the number of stress scenarios in accordance with Article 21 paragraph (3) of this Decision, reduce the number of events when making stress scenarios in accordance with Articles 21 to 25 of this Decision and reduce the requirements in accordance with Article 27 paragraph (3) of this Decision. (3) By way of derogation from paragraph (2) of this Article, the Central Bank may issue a decision requiring a non-significant credit institution to apply the provisions of this Decision in an extended or full scope. Drawing up, adoption and review of recovery plans
Article 27
(1) The management board of a credit institution shall assess and adopt a recovery plan, subject to a prior approval from the supervisory board. (2) A significant credit institution shall ensure that the persons responsible for drawing up a recovery plan are not the persons responsible for conducting stress testing of the recovery plans. (3) The risk control function of a credit institution shall:
V. SUBMITTING RECOVERY PLANS TO THE CENTRAL BANK
Submitting recovery plans
Article 28
(1) A credit institution shall update as a minimum once a year the existing recovery plan or, where appropriate, draw up a new recovery plan and submit it to the Central Bank by 31 December of the current year at the latest. (2) A credit institution shall also update its recovery plan after each material change and submit it to the Central Bank without delay. (3) Together with the recovery plan submitted to the Central Bank, a credit institution shall submit a decision of the management board on the adoption, and/or updating of the recovery plan along with filled in forms from Annex 2, which forms an integral part to this Decision.
VI. AMENDMENTS TO THE CONTENTS OF THE RECOVERY PLAN
Obligation to revise the recovery plan
Article 29
(1) A credit institution shall revise the content of the recovery plan when the Central Bank, after assessing that there are material deficiencies in the recovery plan or material obstacles to its implementation, in accordance with Article 128 paragraph (1) of the Law orders the credit institution to submit the revised recovery plan to the Central Bank. (2) The Central Bank shall performed the assessment referred to in paragraph (1) of this
Article in accordance with Articles 30 to 35 of this Decision.
Completeness of recovery plans
Article 30
The Central Bank shall assess the extent to which the recovery plan of the credit institution meets the requirements of Articles 125 to 130 of the Law and reviews the completeness of the plan by assessing:
instruments and whether the plan specifies assets that would be expected to qualify as collateral;
4) whether the recovery plan has adequately considered a range of scenarios of
severe macroeconomic and financial stress that is relevant to the credit institution or group member covered by the plan, in accordance with Articles 21 to 25 of this Decision;
5) whether the recovery plan contains an appropriate framework of indicators for
determining the levels for undertaking appropriate activities envisaged by the plan, in accordance with Articles 6 to 14 of this Decision;
6) whether the information from items 1) to 5) of this paragraph are submitted for the
group as a whole;
7) whether, if applicable, the recovery plan includes arrangements for intra group
financial support that have been made on the basis of an agreement on intra group financial support in accordance with Articles 182 to 202 of the Law;
8) whether the recovery plan for each scenario of severe macroeconomic and
financial stress contained in the plan in accordance with Article 24 of this Decision states that there are:
whether there is internal consistency of the recovery plan, and individual recovery
plan and group recovery plan, that is, in case where the Central Bank requires that subsidiaries on an individual basis prepare recovery plans, that there is internal consistency between these plans and the group recovery plan. Implementation of the arrangements proposed in the recovery plans
Article 32
(1) When assessing the extent to which the recovery plan satisfies the criterion set out in
Article 127 paragraph (1) item 1) of the Law, the Central Bank shall review the following:
the level of integration and consistency of the recovery plan with the general
corporate governance and the internal processes of the credit institution or group member to which the recovery plan applies and its/their risk management framework;
whether the recovery plan contains a sufficient number of plausible and viable
recovery options which make it reasonably likely that the credit institution or group would be able to counter different scenarios of financial distress quickly and effectively;
whether recovery options included in the plan set out actions which effectively
address the scenarios of severe macroeconomic and financial stress reflected in accordance with Article 125 paragraph (6) of the Law;
whether the timeline for implementing the options is realistic and is taken into
account in the procedures designed to ensure implementation of recovery actions;
the level of the credit institution's or group's preparedness to redress the situation
of financial stress, as determined in particular by assessing whether the preparatory measures necessary have been adequately identified and, where appropriate, those measures have been implemented or a plan to implement them has been prepared;
the adequacy of the range of scenarios of severe macroeconomic and financial
stress against which the plan has been tested;
the adequacy of the processes for testing the plan against the scenarios referred
to in item 6) of this paragraph and the extent to which the analysis of recovery options and indicators in each scenario is verified by that testing;
whether the assumptions and valuations made within the plan and each recovery
option are realistic and plausible.
(2) The plausibility of each recovery option set out in the plan as referred to in paragraph (1) item 2) of this Article shall be assessed taking into account all of the following elements:
the extent to which its implementation is within the credit institution's or group's
control and the extent to which it would rely on action by third parties;
whether the plan includes a sufficiently wide range of recovery options and
appropriate indicators, conditions and procedures to ensure timely implementation of these options;
the extent to which the plan considers reasonably foreseeable impacts of the
implementation of the proposed recovery option on the credit institution or group;
whether the recovery plan and in particular the recovery options would be likely to
maintain the viability of the credit institution or group and restore its financial soundness;
if applicable, the extent to which the credit institution or group, or competitors with
similar characteristics, have managed a previous episode of financial stress with similar characteristics to the scenario being considered by using the recovery options described, in particular as regards timely implementation of recovery options and, in the case of a group recovery plan, the coordination of recovery options within the group. Assessment of recovery options
Article 33
When assessing the extent to which the recovery plan satisfies the criterion set out in Article 127 paragraph (1) item 2) of the Law, the Central Bank shall review the following:
whether it is reasonably likely that the plan and individual recovery options
can be implemented in a timely and effective manner even in situations of severe macroeconomic or financial stress;
whether it is reasonably likely that the plan and particular recovery options
can be implemented to an extent which sufficiently achieves their objectives without any significant adverse effect on the financial system;
whether the range of recovery options sufficiently reduces the risk that
obstacles to implementing those options or adverse systemic effects arise due to the recovery actions of other institutions or groups being taken at the same time;
the extent to which the recovery options may conflict with those of credit
institutions or groups which have similar vulnerabilities, for example due to their similar business models, strategies or scope of activity, if the options were implemented at the same time;
the extent to which the implementation of recovery options by several credit
institutions or groups at the same time is likely to negatively affect the impact and feasibility of those options. Assessment of specific requirements for group recovery plans
Article 34
When assessing the extent to which a group recovery plan satisfies the criteria set out in Articles 129 paragraph (2) and Article 130 paragraph (2) of the Law, the Central Bank shall review the following:
the extent to which the recovery plan can stabilise the group as a whole and any
credit institution of the group, in particular taking into account:
THE COUNCIL OF THE CENTRAL BANK OF MONTENEGRO
CHAIRMAN
Decision number 0101-7725-6/2020 G O V E R N O R, Podgorica, 28 December 2020 Radoje Žugić, m.p.
ANNEX 1
RECOVERY PLAN INDICATORS
Table 1: CATEGORIES OF RECOVERY PLAN INDICATORS
Table 2: RECOVERY PLAN INDICATORS1
Indicator name Level of early warning
Level of initiating recovery plan options
1 For each indicator, a credit institution may clarify that it is not adequate, in which case it is necessary to replace it with another indicator that is more adequate for the credit institution.
Table 3: EXAMPLE OF ADDITIONAL RECOVERY PLAN INDICATORS
Additional recovery plan indicators
ANNEX 2
FORMS SUBMITTED TO THE CENTRAL BANK WITH RECOVERY PLAN TEMPLATE 1: KEY FUNCTIONS Key functions Does the interruption of the provision of that service influences third parties and the financial system as a whole? Is the market of the service in question concentrated? Is it possible that another service provider adequately takes over the provision of the service in question? Is it a critical function? Critical services for providing critical functions TEMPLATE 2: CORE/SIGNIFICANT BUSINESS LINES Core/Significant business lines Explanation why a significant/core is considered significant
TEMPLATE 3: RECOVERY OPTIONS
Option name
Areas of measures Is it applied in early intervention phase Capital Liquidity Financial leverage Risk management Restructuring of liabilities Other
TEMPLATE 4: SCENARIOS
Scenario name
Type of scenario Fast-
/slowdevelopin g events
Stresses and their parameter s
Application of reverse stress testing
Level of indicators after stress testing
Measures that are applicable in the scenario
Level of indicators after the implementa tion of measures Specific Systemic Combined
Note from RegAlert. AI assistants can read this document in full, and search 70,000+ more, through the RegAlert MCP connector (https://mcp.regalert.today/mcp). Free with an account. How to connect ChatGPT, Claude or Cursor.
Source: Central Bank of Montenegro — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works
More like this from CBCG
CBCG published 8 documents in the last 30 days. We email you each new one the day it's published.