The European Securities and Markets Authority issued an opinion approving the Netherlands Authority for the Financial Markets' proposed position limits for ICE Endex German Power Financial Base futures and options. ESMA validated the AFM's methodology, which sets a spot month limit at 11% of deliverable supply and an other months' limit at 50% of open interest, finding both compliant with MiFID II and RTS 21. The regulator emphasized the need for careful monitoring of trading patterns and timely review of the spot month limit to prevent market abuse while supporting market liquidity.
ESMA • 201-203 rue de Bercy • CS 80910 • 75589 Paris Cedex 12 • France • Tel. +33 (0) 1 58 36 43 21 • www.esma.europa.eu OPINION on position limits on ICE Endex German Power Financial Base contracts I.Introduction and legal basis
III.Market description
3. The ICE Endex German Power Financial Based Futures contract refers to the trading of
electricity produced in Germany and received from the countries Germany is connected to.
The contracts are traded in lots for which 1 lot equals 1 MW (1,000,000 Watts). The minimum trading size is 1 lot for electronic futures, 1 lot for Exchange for Physical (EFP) and 1 lot for exchange for swaps (EFS). There are monthly, quarterly and yearly future contracts available and the contracts are cash-settled. Months, quarters and years and years are listed in parallel.
4. The ICE Endex German Power Financial Based Options contract is an option on the German
Power Financial Base Futures contract. At expiry, one lot of German Power Financial Base Options will exercise into one lot of German Power Financial Base Futures. German Power Financial Base Options are European-style, such that In-The-Money options, unless abandoned prior to expiry, are automatically exercised at expiry. The contracts are traded in lots for which 1 lot equals to 1 MW (1,000,000 Watts). The minimum trading size is 1 lot.
5. There is a high number of producers and their role in the market is very diverse. In Germany
about 700 companies are holding a license to supply electricity to retail clients. Germany is currently in a process of fundamental market design changes (‘Energiewende’). At the same time, more and more renewable energy generation facilities and new generation companies are entering the market. Germany's electrical grid is part of the Synchronous grid of Continental Europe.
6. In 2019, Germany produced 515,56 TWh of electricity of which 46.1% was from renewable
energy sources, 29.1% from coal, and 10.5% from natural gas. While nuclear power production increased only slightly from 2018 (13.3%) to 2019 (13.8%), electricity generated from brown coal and hard coal significantly decreased by 22.3% and 32.8%, respectively. The electricity production from gas-fired power plants increased by 21.4% in 2019, due to the low gas prices. Germany will phase-out nuclear power by 2022, and as of 2019, coal is scheduled to be phased out by 2038. Germany, the largest exporter of electricity with 6% of the overall export saw in 2019 its export decreasing strongly, falling from 48 TWh in 2018 to about 30 TWh in 2019. IV.Proposed limit and rationale Spot month position limit Deliverable supply
7. Deliverable supply amounts to 160,668,000 MWh.
Open interest
16. Open interest amounts to 9,177,483 MWh. There are overlapping contracts for the ICE
Endex German Power Financial Base market. The overlapping contracts are identified based on the contract specifications. To be aggregated, the contracts must have identical settlement and delivery terms for the same hub. As a consequence, related contracts with cash settlement and physical settlement cannot be aggregated and therefore have their daily open interest calculated separately. For the ICE Endex German Power Financial Base market, there are 8 related contracts that fit the aggregation criteria of identical settlement and delivery terms. The contracts for this Other Months limit are:
should be taken in consideration for classifying the market under the position limits regime and identifying the appropriate derogations. Other month’s position limit
19. The other months’ limit amounts to 4,588,742 MWh. The other month’s limit applies to
ICE Endex German Power Financial Base futures and options contracts. It includes monthly, quarterly and yearly contracts.
Other months’ position limit rationale
20. Considering the above-mentioned market developments, the fact that there are no investment firms active as market makers on the ICE Endex German Power Financial Base
market, a 25 percent base line limit should be applied, whereby Article 19(2)(b) of RTS 21 provides an extension of the upper limit from 40% to 50%.
21. AFM has considered the following factors to adjust the other month’s position limit upwards:
In considering the volatility in the contracts, as required by Article 21 of RTS 21, there
has been some variation in the price of the commodity derivative, but the AFM has not found evidence that this is excessive or that lower position limits would reduce volatility.
All other factors have been considered and were not regarded as material or relevant to
require additional adjustments, either up or down, from the baseline.
Given the characteristics of this contract, the AFM has decided to set a total upward adjustment of 25 percentage points resulted in an adjusted baseline of 50% of open interest.
This provides another months’ position limit of 4,588,742 MWh.
V. ESMA’s Assessment
This Opinion concerns positions held in ICE Endex German Power Financial Base contracts.
ESMA has performed the assessment based on the information provided by AFM.
ESMA notes that the ICE Endex German Power Financial Base futures and options
contract is a recently liquid contract for which bespoke position limits are established by the AFM for the first time.
For the purposes of this Opinion, ESMA has assessed the compatibility of the intended
position limits with the objectives of Article 57(1) of MiFID II and with the methodology for calculation of position limits established in RTS 21, in accordance with Article 57(3) of MiFID II. Compatibility with the methodology for calculation of position limits established in RTS 21 in accordance with Article 57(3) of MiFID II
AFM has set one position limit for the spot month and another position limit for the other
months.
Spot month position limit
The calculation of the deliverable supply is based on of the internal production and the
cross-border net transmission capacity for the year 2018. The source of data used to calculate deliverable supply (ENTSO-e statistics) ensures publicly available figures that are consistent at the European level.
ESMA considers that this methodology to calculate deliverable supply is consistent with
Article 10(1) of RTS 21 that sets out that deliverable supply shall be calculated “by identifying
the quantity of the underlying commodity that can be used to fulfil the delivery requirements of the commodity derivative.”
32. The monthly deliverable supply figure has been calculated by converting the capacity
(expressed in MW) to MWh per month.
33. This approach is consistent with Article 10(2) of RTS 21, which sets out that “Competent
authorities shall determine the deliverable supply […] by reference to the average monthly amount of the underlying commodity available for delivery over the one-year period immediately preceding the determination”.
34. Compared with the baseline figure of 25% of deliverable supply, the spot month position
limit has been adjusted downwards and set at 11% of deliverable supply.
35. ESMA considers that, since the deliverable supply (160,668,000 MWh) is significantly
larger that the open interest (9,177,483 MWh), a downward adjustment to the spot month limit can be made under Article 18(3) of RTS 21. Indeed, ESMA considers that the rationale underpinning Article 18(3) with respect to the other months’ limit enables the national competent authority to adjust the spot month limit downwards in case the deliverable supply is significantly higher than the open interest.
36. Taking into account all of the above, ESMA considers reasonable to adjust the spot
month limit downwards.
Other months’ position limit
37. The daily average open interest was calculated by adding the open interest from each
identified related contract that can be aggregated. The daily average open interest figures are extracted from the AFM position reporting system. The resulting figure is the daily open interest of the relevant contract for the selected publication date. A daily overview of the contract open interest was made by repeating this process for each publication date for February
2020. Then an average was calculated resulting in the February 2020 daily open interest figure. Positions in options have been delta-adjusted.
38. ESMA considers such an approach sensible because of the recent evolution of the open
interest which has been constantly rising.
39. Compared to the baseline figure of 25% of overall open interest, the other months’ position limit has been adjusted upward and set at 50% of open interest.
40. ESMA agrees that an upward adjustment of the other months’ position limit is justified in
accordance with Article 18(3) of RTS 21 given that the deliverable supply is significantly higher than the open interest. ESMA also agrees that an upward adjustment is justified by the fact that the ICE Endex German Power Financial Base contract has a large number of separate expiries (Article 16(2) of RTS 21).
Steven Maijoor
ESMA Chair
Note from RegAlert. AI assistants can read this document in full, and search 70,000+ more, through the RegAlert MCP connector (https://mcp.regalert.today/mcp). Free with an account. How to connect ChatGPT, Claude or Cursor.
More like this from ESMA
ESMA published 3 documents in the last 30 days. We email you each new one the day it's published.
Source: European Securities and Markets Authority — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works
In RegAlert: added · updated