Guidance · SAMA · 6 Jan 2020

Guidelines on Management of Problem Loans

Banks must implement an Early Warning Signal (EWS) process managed by a separate risk unit, requiring relationship managers to analyze triggers within 1-3 days and escalate to a watch list or Workout Unit within 6-10 days. Loans on the watch list must be reviewed fortnightly (material) or monthly (others), with a maximum duration before mandatory transfer to the Workout Unit. The strategy must include annual NPL reduction targets over a minimum 3-year period, with all actions recorded in an IT system and reported monthly to the Board.

Saudi ArabiaSaudi Central Bank
Annotations and obligations
282 obligations · 12 permissions · 98 definitions
  • Obligation 282
  • Permission 12
  • Definition / condition 98
  • background, boilerplate

More like this from SAMA

We email you every new SAMA publication the day it's published.

Source: Saudi Central Bank — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works

In RegAlert: added · updated