Rule · BB · 13 Mar 2018
The Operations Manual establishes the operational and administrative procedures for the IPFF II Project, including procurement, financial management, and eligibility criteria for Participating Financial Institutions (PFIs). It defines the roles of the Project Implementation Unit, PFIs, and Investment Sponsors, mandating compliance with Environmental and Social Risk Management guidelines and specific financing terms for infrastructure projects. The document outlines the selection process for PFIs, responsibilities for loan application and monitoring, and the governance structure involving the Project Steering Committee and Project Implementation Committee.
OPERATIONS MANUAL of
INVESTMENT PROMOTION AND FINANCING
FACILITY II (IPFF II) PROJECT
PROJECT IMPLEMENTATION UNIT
IPFF II PROJECT CELL
BANGLADESH BANK
MARCH 2018
ii
Table of Contents
Sl Contents Page
1 Introduction 1
2 Objectives of IPFF II Project 1
3 Background 3
4 Implementation Arrangement 3
5 Selection of PFIs 7
6 Responsibilities of PFIs 7
7 Eligible Sectors for IPFF II Financing 9
8 Requirements of Investment Sponsor 10
9 Terms and Conditions for Sanctioning Infrastructure Financing 10 10 Operational Procedure for Availing Facility Loan 13 11 Repayment Mechanism 14 12 Restructuring of Facility Loan 15 13 Master Facility Agreement 15 14 Facility Access Agreement 17 15 Infrastructure Financing Agreement 18 16 Procurement 19 17 Financial Management 27 18 Monitoring and Reporting 29 19 Environmental and Social Risk Management 30
Appendix : Definitions 32
Annexure 1: Eligibility Criteria for Enlistment as PFI 36 Annexure 2: Exclusion List 40 Annexure 3: List of Environmentally and Socially Sensitive Activities 41 Annexure 4: Loan Application for Availing Facility Loan 42 Annexure 5: Document Checklist 53 Annexure 6: Summary Details of Investment Project 56 Annexure 7: Undertaking by the PFI 58 Annexure 8: Quarterly Report of PFI on Infrastructure Financing 59 Annexure 9: Figure Showing IPFF II Project Implementation Arrangements 60 Annexure 10: Grievance Redress Mechanism 61
iii
ABBREVIATIONS AND ACRONYMS
A&BD Accounts and Budgeting Department
BB Bangladesh Bank
BDT Bangladeshi Taka
BIFFL Bangladesh Infrastructure Finance Fund Limited CAO Chief Accountant’s Office CIB Credit Information Bureau COD Commercial Operation Date CPTU Central Procurement Technical Unit DFI Development Finance Institution DoE Department of Environment DOSA Dollar Special Account ECAI External Credit Assessment Institutions ECC Environmental Clearance EFT Electronic Fund Transfer e-GP Electronic Government Procurement EHS Environment, Health and Safety EPC Engineering, Procurement and Construction ERD Economic Relations Division E & S Environmental and Social ESA Environmental and Social Audit ESAP Environmental and Social Action Plan ESIA Environmental and Social Impact Assessment ESMP Environmental and Social Management Plan ESMS Environmental and Social Management System ESPP Environmental and Social Policy and Procedures ESRM Environmental and Social Risk Management FAA Facility Access Agreement FAPAD Foreign Aided Project Audit Directorate FC Foreign Currency FD Finance Division FEPD Foreign Exchange Policy Department FID Financial Institutions Division FIDP Financial Institutions Development Project FM Financial Management FRTMD Forex Reserve and Treasury Management Department GED General Economic Division GoB Government of the People’s Republic of Bangladesh GPN General Procurement Notice ICB International Competitive Bidding ICT Information and Communication Technology IDA International Development Association IDCOL Infrastructure Development Company Limited IEE Initial Environmental Examination
iv
IFC International Finance Corporation
IM Information Memorandum
IMED Implementation Monitoring and Evaluation Division IPDP Indigenous People’s Development Plan IPFF Investment Promotion and Financing Facility IUFR Interim Unaudited Financial Report L/C Letter of Credit LLCR Loan Life Coverage Ratio LoI Letter of Intent M&E Monitoring and Evaluation MFA Master Facility Agreement MoF Ministry of Finance MoU Memorandum of Understanding MRR Materials Receipt Report MTD Model Tender Document NBFI Non-Bank Financial Institution NCT National Competitive Tender NPL Non-Performing Loan OM Operations Manual OTM Open Tendering Method PA Procuring Agency PAC Project Audit Committee PD Project Director PE Procuring Entity PFI Participating Financial Institution PFP Procurement Focal Person PIC Project Implementation Committee PIU Project Implementation Unit PMO Prime Minister’s Office PO Purchase Order PPA Public Procurement Act PPP Public Private Partnership PPPA Public Private Partnership Authority PPR Public Procurement Rules PPSD Project Procurement Strategy for Development PR Performance Rating PSC Project Steering Committee RAP Resettlement Action Plan SCC Site Clearance Certificate SEID Socio-Economic Infrastructure Division SFD Sustainable Finance Department STEP Systematic Tracking of Exchanges in Procurement TA Technical Assistance TAPP Technical Assistance Project Proposal
v
ToR Terms of Reference
TSA Technical Services Agreement
UNDB United Nations Development Business
USD United States Dollar
INVESTMENT PROMOTION AND FINANCING FACILITY II PROJECT OPERATIONS MANUAL
IPFF II is designed to achieve the above objective by way of following two broad components:
Component 1 (Long-Term Infrastructure Financing Component):
Long-term financing will be provided under the IPFF II Facility (the Facility) to PFIs for further onlending and investment support of long-term infrastructure investments by private sector investors/Investment Sponsor (hereinafter called Sponsor). In addition to conventional debt, the long-term financing component will support leveraging the market through innovative and diverse financial instruments. The instruments will include innovative debt instruments such as promoter/sponsor loans, mezzanine financing, takeout financing facilities, specialized project/infrastructure bonds etc. Moreover, equity and credit guarantees/credit enhancement1 will also be piloted. Bangladesh Infrastructure Finance Fund Limited (BIFFL) will take the lead in developing innovative instruments and piloting the same based on market response and the design will be agreed with BB and IDA. Regardless of the type of instrument and nature of claim (debt/equity) associated with the transaction, the financing to PFIs will be in the form of on-lending (debt).2 As such, at the BB to PFI level, treatment of financing parameters will be the same across regular debt financing and other financial instruments, including equity and guarantees. Tentatively USD 30 (Thirty) million is primarily earmarked for the innovative financing instruments; in case less than a full indicative amount is used for this purpose, the funds will be utilized for traditional on-lending and vice versa. As regards administration of equity, guarantees, and other eligible infrastructure finance instruments to be introduced in the project, the project funds will be disbursed to the PFIs as debt, on terms and conditions agreed for these instruments during project implementation. Component 2 (Technical Assistance Component):
This component will provide i) Technical assistance to Public Private Partnership Authority (PPPA) for the development of the infrastructure project pipeline, including PPPs. ii) Technical assistance for strengthening capacity of project stakeholders such as: government agencies, PFIs and Investment Sponsors in the area of environmental and social risk management in infrastructure project financing. iii) Technical assistance to BIFFL for the development of new long-term infrastructure finance instruments. iv) Support to BB for Project implementation activities.
1Utilizing the project funds for guarantee reserves to be created.
Such instruments could expand financing options to the borrowing companies and also allow traditional lenders—banks and nonbank financial institutions, institutional investors—to expand their provision of finance to the infrastructure projects on improved terms (lower interest rates, longer maturities, better currency, and structuring choices) and with more options for risk management.
Finance Division with consultation of IPFF II Project Cell may increase or decrease the member/ number of representative of the PIC.
meet periodically to decide on implementation aspects of the project. The PD will act as the Member Secretary of the PIC.
iv. A Project Steering Committee (PSC) headed by the Senior Secretary/Secretary, FD and
representatives4 from FD, FID and ERD of MoF, IMED and SEID of Ministry of Planning and PMO will meet periodically to decide on policy and major implementation aspects of the project. The PD will act as the Member Secretary of the PSC.
4.2 IPFF II Project Management Set-up:
Following diagram summarizes the project management set-up:
Finance Division may increase or decrease the member/number of representative of the PSC. Project Steering Committee Project Audit Committee Project Implementation Unit (IPFF II Project Cell) Project Director Project Implementation Committee Deputy Project Director Project Managers Deputy Project Managers Assistant Project Managers Support Staffs PFIs Technical Advisors and/or Consultants
4.3 Roles and Responsibilities of IPFF II Project Cell:
IPFF II Project Cell of BB will act as the PIU for IPFF II Project and be responsible for overseeing and management of IPFF II fund. This cell will coordinate with concerned ministries, IDA, PPPA, BIFFL, different departments and units of BB to ensure effective implementation of the Facility. Responsibilities of IPFF II Project Cell will be as follows:
i. Identifying and selecting eligible PFIs following the criteria delineated in this manual, and signing
separate Master Facility Agreement (MFA) with the selected PFIs. PFIs’ compliance with these eligibility criteria will be closely monitored and tracked on an on-going basis.
ii. Receiving loan applications for IPFF II facility loan from PFIs.
iii. Reviewing the loan applications to ensure that the loans are provided to the target group, and follow
proper procurement process and safeguard including environmental and social procedures.
iv. Processing withdrawal requests with IDA and GoB to make the fund available for onward
disbursement to PFIs and meeting expenses under TA.
v. Approving facility and disbursement of funds according to the policy guidelines and OM.
vi. Maintaining all disbursement records and accounts of each PFI along with supporting documents.
vii. Recovering installments (Principal and Interest) and other applicable charges from PFIs as per the
amortization schedule and OM.
viii. Conducting off-site monitoring supported by on-site inspection, if needed both, at the PFIs and the
ultimate borrower entities/Sponsors in order to ensure the effective utilization of the facility.
ix. Collecting periodic progress reports of implementation of the Subprojects from the PFIs and
forwarding the consolidated reports to the IDA.
x. Preparing and posting all transaction vouchers as per the procedures given in OM.
xi. Arranging workshops, seminars and training programs on different aspects of the project.
xii. Monitoring environmental and social safeguards compliance of the investment sponsor in line with
Environmental and Social Policy and Procedures (ESPP) of IPFF II Project.
xiii. Ensuring PFIs’ compliance with the Project’s safeguards and fiduciary framework.
xiv. Procuring goods and services as per procurement plan of IPFF II following Project Procurement
Strategy for Development (PPSD) of IPFF II Project.
xv. Performing other tasks and functions as are necessary to achieve the objective of the Project.
4.4 Organogram:
ORGANOGRAM OF IPFF II PROJECT CELL
PROJECT
DIRECTOR
DEPUTY PROJECT
DIRECTOR
PROJECT
MANAGER-1
DEPUTY PROJECT
MANAGER-1
ASSISTANT
PROJECT
MANAGER-1
DEPUTY PROJECT
MANAGER-2
ASSISTANT
PROJECT
MANAGER-2
PROJECT
MANAGER-2
DEPUTY PROJECT
MANAGER-3
ASSISTANT
PROJECT
MANAGER-3
PROJECT
MANAGER-4
DEPUTY PROJECT
MANAGER-5
ASSISTANT
PROJECT
MANAGER -5
PROJECT
MANAGER-3
DEPUTY PROJECT
MANAGER-4
ASSISTANT
PROJECT
MANAGER-4
4.5 Roles and Responsibilities of BIFFL and PPPA:
i. BIFFL and the PPPA will maintain organizational arrangements overseen by the respective heads
of the organizations to absorb TA successfully which will include monitoring and evaluation of internal performance and results that will feed into the overall project Monitoring and Evaluation (M&E) structure.
ii. Managing the steps in relevant consultancy services as per the approved procurement plan of IPFF
II, as shared by BB PIU.
iii. Provide monitoring reports to the BB PIU and the IDA in an agreed format and periodicity.
iv. Maintain financial accounts so as to ensure smooth financial reviews/audits of their TA allocations
as part of the overall Financial Management (FM) of the project.
v. Also embed appropriate Environmental and Social (E & S) considerations into their project related
activities, in line with the overall project E & S design.
vi. PFIs shall be permitted to finance Subprojects associated with high risk activities listed in the List
of Environmentally and Socially Sensitive Activities as mentioned in Annexure 3 provided IDA and IPFF II Project Cell are of the view that they have sufficient capacity to manage these risks.
vii. After necessary approval at their end, PFIs will send the loan application (Annexure 4) along with
document checklist (Annexure 5) and related documents (Annexure 6 & 7) to IPFF II Project Cell.
viii. Syndication amongst the PFIs and non-PFIs will be permitted. However, IPFF II Facility will be
provided to PFIs only. The lead PFI will be the focal point for operation of the financing facility and its repayment to BB. All the PFIs will be responsible for credit administration and recovery from the Sponsors.
ix. Before financial closure, the PFIs will have to arrange financial/credit syndication with other PFIs
and non-PFI partners in the market. Quality of the PFIs’ risk management process will have an impact on their selection of non-PFI syndication partners.
x. PFIs must ensure that standard commercial practices of the Subproject acceptable to the IDA and
BB, have been followed by the Sponsor in procuring the goods, services or works.
xi. PFIs must ensure proper utilization of the fund for the intended purpose.
xii. PFIs will coordinate with BB and IDA in off-site and on-site quality check of such financing.
xiii. PFIs will submit reports (as per Annexure 8) on disbursement of IPFF II facility quarterly and
utilization of fund to IPFF II Project Cell as required.
xiv. PFIs may seek necessary guidance from IPFF II Project Cell for capacity building regarding proper
implementation of Environmental and Social Management System (ESMS) and appraisal of Subproject.
xv. PFIs must ensure compliance with all regulatory and supervisory requirements of BB.
xvi. PFIs will co-invest (either alone or by syndication) assuming all credit risk and shall exercise its
rights in relation to each Investment Project in such manner as to (a) protect the interests of BB, the GoB, the IDA, and of the PFI; (b) comply with its obligations under the MFA; and (c) achieve the purposes of the credit as per terms mentioned in OM.
xvii. PFIs will not be associated with corrupt and unethical business activities or practices inconsistent
with the Investment Project pursuant to the OM.
xviii. After receiving approval to participate in the Facility, the PFIs must continue to satisfy the
eligibility criteria as per MFA.
xix. If the PFI is not in compliance with any of the eligibility criteria, IPFF II Project Cell will promptly
notify the PFI regarding the specific eligibility criteria which the PFI is not in compliance and seek appropriate response from the PFI to remedy the violation within a stated agreed upon time period.
xx. If the PFI fails to maintain its eligibility status under the Facility or fails to repay the outstanding
facility loan by a specific date with up to date interest, the IPFF II Project Cell with intimation to IDA, will have the right to suspend all infrastructure financing amortizations under the facility and recover the outstanding facility loan with up to date interest by debiting current account (local currency) and/or foreign currency (FC) clearing Account of the PFI with BB.
xxi. IPFF II may re-establish the eligibility status of the PFI upon demonstrated compliance by the PFI
that the specific eligibility violations have been removed, mitigated or no longer exists.
xxii. PFI will ensure that, within three days of occurrence, Sponsors notify the PFI, and the PFI in turn,
notifies IPFF II Project Cell, of any social, labor, health and safety, security or environmental incident, accident or circumstance having, or which could reasonably be expected to have, any material impact on compliance of the Subproject with the agreed Environmental and Social Management Plan (ESMP).
xxiii. PFI will follow all the instructions issued/given by IPFF II Project Cell regarding investment
facilities.
7. Eligible Sectors for IPFF II Financing
Long-Term Infrastructure Financing facility will be extended through the PFIs against government approved/endorsed (by appropriate authority/licensed by competent authority in applicable case) infrastructure projects in eligible sectors mentioned as follows:
i. Power generation, transmission, distribution, renewable energy and services;
ii. Port development (sea, river and land) including inland container terminals, inland container
depot and other services;
iii. Environmental, industrial and solid waste management projects;
iv. Highways and expressways including mass-transit, bridges, tunnels, flyovers, interchanges, city
roads, bus terminals, commercial car parking, etc;
v. Airports, terminals and related aviation facilities;
vi. Water supply and distribution, sewerage and drainage;
vii. Industrial estates, economic zones, eco parks, theme parks and parks development;
viii. Social sector including infrastructure in health and education;
ix. Information and communication technology (ICT, including wi-max, internet backbone and elearning facilities);
iv. Financing facility will be extended either in USD or in BDT, or in a combination of both USD
and BDT, at fixed or variable rates, depending on request by the PFIs and business need of the Subproject.
v. Facility Loan in USD financing will be provided only to the PFIs who are authorized by BB to
deal in foreign exchange. PFIs will have to obtain permission/approval from Foreign Exchange Policy Department (FEPD) of BB for such financing, if necessary.
vi. The interest rate of facility loans for PFIs shall be as follows:
Currency Fixed Variable
USD USD 10-year swap rate + 50 Basis
Point (bp)
USD 12-month Libor
(Potentially also USD 6-month
Libor + 30 bp and USD 3-month
Libor + 60 bp)
BDT GoB T-Bill 364-day yield + 100 bp GoB T-Bill 364-day yield
vii. The interest rate on the Facility Loans shall be standardized across PFIs. The grace period and
amortization schedule shall match that of infrastructure financing extended by PFIs, subject to the maximum terms indicated below. It may be noted that the grace period offered to the Sponsor by a PFI can be longer but cannot be shorter than the grace period the PFI receives from IPFF II. Maturity of loans to the PFIs will aim to mirror maturity of financing from the PFIs to project Sponsors. Financing for the private sector Sponsors may be made for working capital and investment purposes. The list of applicable reference interest rates of facility loans will be continuously maintained by IPFF II Project Cell.
viii. Facility Loans to the PFIs will have at least 8 (Eight) years (or 96 months) of maturity and can be
provided up to 20 (Twenty) years (or 240 months), including grace period of maximum 3 (Three) years. Grace period may be extended in exceptional cases, subject to concurrence of IDA.
ix. Facility Loans shall be disbursed to PFIs against Infrastructure Financing made or to be made by
PFIs to finance Subprojects and shall be completed before the closing date of the IPFF II Project.
x. PFIs shall disburse Infrastructure Financing to Sponsors immediately after getting funds from
IPFF II Project.
xi. The interest rate on facility loans to the investment Sponsor shall be determined by the respective
PFI in accordance with its usual lending practices. The cost of financing by PFIs to investment sponsor will include, at a minimum, the cost of the project fund plus an on-lending margin reflecting: (i) the PFI’s administrative costs and (ii) a credit risk margin.
xii. When presenting the infrastructure financing proposal (submitted by the PFI & reviewed by the
technical advisor/consultant) to the IDA for approval, IPFF II Project Cell will include:
a. a description of the Investment Sponsor and an appraisal of the Investment Project, including a description of the expenditures proposed to be financed out of the proceeds of the credit; Environmental and Social Impact Assessment (ESIA) or Environmental and Social Audit (ESA), as applicable, and any environmental and social risk management
plans, such as Resettlement Action Plan (RAP) that might have been prepared by sponsor by that time as well as Environmental and Social Action Plan (ESAP) that will list actions to be taken by sponsor to ensure compliance with Bangladesh regulations and World Bank Performance Standards. b. the proposed terms and conditions of the Infrastructure Financing, including the schedule of amortization of the Infrastructure Financing; and such other information as the IDA shall reasonably request.
xiii. All Infrastructure Financing by a PFI shall be subject to prior concurrence by the IDA. Selection
of Subprojects shall be based on the principles of value for money, economy, integrity, fit-forpurpose, efficiency, transparency, fairness, and innovativeness.
xiv. The Infrastructure Financing shall be made on terms whereby the PFI shall obtain, by written
contract with the Investment Sponsor or by other appropriate legal means, rights adequate to protect the interests of the GoB, the IDA and the PFI, including right to a) require the investment sponsor to (i) carry out and operate the Investment Project with due diligence and efficiency, in accordance with the provisions of Anti-Corruption Guidelines, and in accordance with sound technical, financial, managerial, social and environmental standards and practices acceptable to the IDA; (ii) maintain adequate records and (iii) provide, promptly as needed, the resources and labor required for carrying out the Investment Project. b) require that: (i) the goods and services to be financed out of the proceeds of the credit shall be procured in accordance with established commercial practices and procedures satisfactory to the BB and IDA; and (ii) such goods and services shall be used exclusively in the carrying out of the Investment Project; c) require the Investment Sponsor to carry out the ESMPs and ESMS in a manner satisfactory to the PFI, IPFF II Project Cell, GoB and the IDA d) require the Sponsor to annually carry out the audit of the Investment Project under terms of reference satisfactory to the PFI; e) inspect, by the PFI itself or jointly with representatives of the BB/IDA if the BB/IDA shall so request, such goods and the sites, works, plants and construction included in the Investment Project, the operation thereof, and any relevant records and documents; f) require that: (i) the Investment Sponsor shall take out and maintain with responsible insurers such insurance, against such risks and in such amounts, as shall be consistent with sound business practice; and (ii) without any limitation upon the foregoing, such insurance shall cover hazards incident to the acquisition, transportation and delivery of goods financed out of the proceeds of the Credit to the place of use or installation, any indemnity there under to be made payable in a currency freely usable by the Investment Sponsor to replace or repair such goods. g) obtain all such information as the GoB, BB, IDA or the PFI shall reasonably request relating to the foregoing and to the administration, operation and financial condition of the Sponsor and to the benefits to be derived from the Investment Project; and
h) suspend or terminate the right of the Sponsor to the use of the proceeds of the Credit upon failure by such Sponsor to perform its obligations under its contract with the PFI
xv. The PFI shall enter into an Infrastructure Financing Agreement with each Sponsor to finance the
implementation of Investment Projects/Subprojects.
10. Operational Procedure for Availing Facility Loan
i. The Sponsors, after being selected to undertake a government approved/endorsed (by
appropriate authority/licensed (by competent authority in applicable case) infrastructure projects in eligible sectors mentioned in Section Seven (7) of this OM, will approach to a PFI.
ii. The Sponsor will request PFIs for financing the subproject along with a project profile
completed with financial appraisal and technical studies, documents and papers required by the PFI, IPFF II Project Cell and IDA. Investment Projects will also be required to submit their procurement plan along with the proposal. A checklist (not exhaustive) for the documents required by IPFF II Project Cell and the IDA is given in Annexure 5.
iii. The PFI, having received the proposal, if agreeable to invest in the Subproject, conducts due
diligence to assess the credit worthiness of the investment sponsors and viability, credit risks and environmental and social risks of the investment project.
iv. A PFI intending to finance a Subproject may approach IPFF II Project Cell with request for
getting facility from IPFF II.
v. IPFF II Project Cell will do the initial scrutiny as per the checklist and will forward the
proposal to the Technical Advisors/Consultants.
vi. The Technical Advisors, Environment & Social Consultants/Technical Committee and other
consultants (if any) appointed by IPFF II Project Cell will review the proposed investment project and provide their advice/recommendation.
vii. IPFF II Project Cell will not take commercial/credit decisions when reviewing the proposals;
rather IPFF II Project Cell, with support from Technical Consultants and E & S qualified consultants as needed, reviews whether the investment projects to be financed meet predefined criteria e.g., acceptable procurement, sufficient equity participation, Subprojects conform with E & S applicable requirements including adequate E & S impact assessment and management plans prepared or under preparation etc.
viii. Based on the assessment and recommendation, if the Subproject is found to adhere to IPFF II
objectives, OM, and GoB policies, IPFF II Project Cell will request IDA to accord concurrence for funding the Subproject.
ix. IDA will review the proposal and, if considers acceptable, provides its concurrence for funding
the Subproject. IDA review will be based on the following Review of technical specifications of investment project Review of adequacy of procurement process and compliance of procurement process with commercial practices acceptable to the IDA
Review of compliance of investment project to environmental and social management policy and procedure
x. If required, IPFF II Project Cell/PFIs will send the Subproject proposal to FEPD of BB for
their concurrence/permission for financing in USD from IPFF II Project Cell.
xi. Upon receiving concurrence for financing the Subproject proposal from IDA, facility loans will
be extended against that Subproject through the PFIs.
xii. Repayment by PFIs will be made in BDT and/or USD as per Facility Access Agreement
(FAA). In case of USD financing, repayment will have to be made in USD and for BDT financing the repayment will have to be made in BDT.
xiii. Repayment of the loan will start after a certain grace period and to be repaid on quarterly/half
yearly instalments. The grace period will be determined by the PFIs based on the projected timing of the cash inflows of Subproject. However, the grace period will not be more than 3 (three) years.
xiv. An indicative amortization schedule for the repayment will be prepared by the PFIs in
consultation with IPFF II Project Cell during the signing of FAA. However, final amortization
schedule will have to be submitted to IPFF II Project Cell in due course. In case of multiple
instalments of disbursements, this amortization schedule may be revised at the closing of the financing to reflect the actual disbursement.
xv. Eligible investment projects are considered for financing by IPFF II Project Cell on a firstcome-first-served basis. Applications incomplete in any respect will fall back in the queue and
will be overtaken by other complete applications in the disbursement process.
xvi. Other terms and conditions related to facility loans described in OM are also applicable for
Subproject financing.
The above implementation arrangement is shown in a diagram in Annexure 9.
11. Repayment Mechanism
i. As per amortization schedule, each PFI is required to pay the full amount by Cheque/Demand
Draft/Electronic Fund Transfer (EFT) or any other means instructed by IPFF II Project Cell on due date.
ii. IPFF II Project Cell and PFI will monitor the total repayment system.
iii. Value date for repayment received is the date (before noon) the cheque or demand draft is handed
over to IPFF II Project Cell. In case of EFT, the date provided by the debit authority will be the value date.
iv. At the close of repayment day, if there are any non-payments, the PFI will contact and
communicate with IPFF II Project Cell that the repayment has been missed out. IPFF II Project Cell may also contact and remind them.
v. Late payments are subject to penalties at the prevailing interest rate applicable for the Subproject.
vi. If the repayment date happens to be a holiday, the repayment will then be payable on the next
working day without penalties.
vii. Each PFI should maintain a database regarding their repayment due dates and monitor properly.
viii. Pre-payments are allowed without penal interest. But commitment charge @ ½ (Half) of 1.00%
(One Percent) is payable for premature adjustment of the entire amount of loan outstanding.
ix. In case of partial pre-payment, repayment schedules are redrawn, and the new repayment
schedule is entered into the system.
12. Restructuring of Facility Loan
Restructuring of facility extended to PFIs may be allowed in very exceptional cases, subject to concurrence of IDA.
13. Master Facility Agreement
Private Sector Scheduled Commercial Banks and NBFIs that meet the eligibility criteria for enlistment and continuity as PFI will be enlisted with the IPFF II as PFIs. A PFI, to be eligible for IPFF II credits, shall enter into a MFA with BB, the terms and conditions of which, inter alia, provide that:
i. The PFI shall conduct its operations and affairs in accordance with sound financial standards and
accounting and auditing practices, compliance with BB prudential norms as minimum capital adequacy ratio, maximum foreign currency exposure limits, positive return on equity in the last three years; adequate organization, management, staff and other resources, application of appropriate procedures for appraisal, supervision, and monitoring (including procurement, E & S risk management), satisfactory to the IDA.
ii. The PFI shall establish and maintain procedures and operational policies, satisfactory to BB, for
the appraisal, supervision and monitoring of infrastructure financing.
iii. The PFI shall ensure that infrastructure financing will be made in accordance with the procedures
and on the terms and conditions set forth in the OM of IPFF II Project.
iv. The PFI shall exercise its rights in relation to each Subproject in such manner as to: (i) protect the
interests of BB, the GoB, IDA, and the PFI; (ii) comply with its obligations under the MFA; and (iii) achieve the purpose of the Credit.
v. The PFI shall duly perform all its obligations under the MFA, including those referred to in
Section 1. H, of Schedule 2 of Financing Agreement of IPFF II Project signed between GoB and
IDA (Environmental and Social (E & S) Risk Management). Except as the BB, GoB and IDA shall otherwise agree, the PFI shall not take or concur in any action which would have the effect of assigning, amending, abrogating or waiving the MFA or any provision thereof.
vi. The PFI shall, at the request of BB, exchange views with BB with regard to the performance of its
obligations under the MFA and other matters relating to the purposes of the Credit.
vii. The PFI shall promptly inform the GoB, BB and IDA of any condition which interferes or
threatens to interfere with the accomplishment of the purposes of the Credit or the performance by the PFI of its obligations under the MFA.
viii. The PFI shall maintain procedures and records adequate to monitor and record the progress of
each Subproject (including its cost and the benefits to be derived from it) and to reflect in accordance with consistently maintained sound accounting and auditing practices the operations and financial condition of the PFI.
ix. The PFI shall enter into FAA with BB for receiving Facility Loans.
x. The PFI shall carry out the Project in accordance with the provision of the Anti-Corruption
Guidelines.
xi. Facility Loans shall be disbursed to PFIs against Infrastructure Financing made or to be made by
PFIs to finance Subprojects and shall be completed before the closing date of the IPFF II Project.
xii. BB shall make available Facility Loans in accordance with; inter alia, the provisions of the FAA.
xiii. The terms and conditions of Facility Loans shall be as set out in this OM and Part C of Schedule 4
of Financing Agreement of IPFF II Project signed between GoB and IDA.
xiv. The right of PFIs to use the proceeds of Facility Loans shall be suspended or terminated upon the
suspension or termination of the related Infrastructure Financing for the relevant Subproject.
xv. The PFIs to ensure their due diligence with respect to ESRM, including, inter alia:
(a) internalizing Applicable E & S Requirements, as well as due diligence and monitoring processes for IPFF II and making them an integral part of the PFI’s institutional ESMS; (b) ensuring adequate implementation of the ESMS at the PFI’s level to enable design, construction, and operation of Subprojects in compliance with relevant GoB’s regulations and requirements and the IDA’s applicable E & S Requirements, including, inter-alia:
developing and maintaining adequate organizational structure, budget, and capacity for identifying, managing, monitoring, and reporting on risks and impacts of Subprojects; (c) ensuring fulfilment by Investment Sponsors of their respective obligations with regard to environmental and social due diligence and monitoring for Subprojects, including formal clearances and timely disclosure of environmental and social instruments for Subprojects (such as ESIAs, ESMPs, ESAPs are completed in accordance with the ESMS and applicable GoB’s regulations and requirements; (d) inclusion of adequate provisions in Subproject contract documentation between PFIs and Sponsors to ensure compliance of Subprojects with Applicable E & S Requirements; (e) Disclosure of elements of the PFIs’ ESMS and, after review by BB, summaries of the ESIA that is required for any Subproject considered high risk in accordance with the ESMS; and (f) Providing BB, GoB and IDA with annual reporting of environmental and social performance of all Subprojects in accordance with any environmental or social commitments included in ESMPs and ESAPs that have been incorporated in investment contracts with Sponsors.
(i) “corrupt practice” is the offering, giving, receiving or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party; (ii) “fraudulent practice” is any act or omission, including a misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain a financial or other benefit or to avoid an obligation; (iii)“collusive practice” is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party; (iv)“coercive practice” is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party; (v) “obstructive practice” is (aa) deliberately destroying, falsifying, altering or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, coercive or collusive practice; and /or threatening, harassing or intimidating any party to prevent it from disclosing its knowledge of matters relevant to the investigation or from pursuing the investigation, or (bb) acts intended to materially impede the exercise of the World Bank’s inspection and audit rights. (b) The IDA and IPFF II Project Cell will reject a proposal for award if it determines that the investor has, directly or through an agent, engaged in corrupt, fraudulent, collusive, coercive or obstructive practices in competing for the contract in question; (c) The IDA and IPFF II Project Cell will cancel the portion of the loan allocated to a contract if it determines at any time that the sponsors, as beneficiary of the facility engaged in corrupt, fraudulent, collusive, or coercive practices during the procurement or the execution of the contract, the World Bank will take appropriate action to remedy the situation; (d) The IDA will sanction a firm or an individual, at any time, in accordance with prevailing World Bank’s sanction procedure, including by publicly declaring such firm or individual ineligible, either indefinitely or for a stated period of time: (i) to be awarded a World Bank financed contract; and (ii) to be nominated sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a World Bank financed contract.
II. The PFI and the sponsor shall permit the IDA and IPFF II Project Cell to inspect sponsors accounts
and records pertaining to debt financing of the plant and to have them audited by auditors appointed by the World Bank, if so required by the World Bank
15. Infrastructure Financing Agreement
The PFI shall enter into an Infrastructure Financing Agreement with each Sponsor to finance the implementation of Investment Projects/Subprojects, under specific terms and conditions corresponding to each type of debt instrument or guarantees, or equity and/or any other financing instrument appropriately developed, assessed and approved; all in accordance with criteria, requirements, and procedures set out in the FAA and OM.
i. Needs Identification: The respective department of an investment sponsor requiring something/a
particular object will identify the requirement of it and a purchase requisition is placed accordingly to the head of the respective department. The department in need of the items has to undertake an initial search for availability of the goods and make a price estimate that will be reflected in the standard requisition form. The purchase requisition should incorporate specifications and other information of the required goods along with the estimated price, as collected from the technical experts. After all necessary judgment, the head of the department has to approve the requisition and will forward it to the purchase department within a stipulated time. Before, submitting the requisition, estimated cost of the goods should be checked against the available budget. Afterwards, the purchase department will conduct purchase activities based on purchase requisition submitted by the concerned department. The department will be liable for identifying the items required and preparing the requisition. Whereas, the purchase department will be responsible for preparing request for quotation, placing purchase order, opening of Letter of Credit (L/C), release of goods, customs clearance and conducting other procurement aspects of the company. Besides, purchase department has to keep a master list of the approved suppliers, profile of the suppliers, purchase requisition, material receipt reports and quality check records etc.
ii. Preparation of Request for Quotation and Distribution among Suppliers: After receiving a
requisition, the purchase department would determine the procedure and available sources of procurement. The department will have to perform an initial search for existing stocks within the company, call off from existing supply agreements or order from other sources on approval. Based on the outcomes/performance, a list of suppliers needs to be developed to whom the request for quotation of the goods will be provided. Sources of Suppliers The purchase department will prepare a request for quotation for the items to be procured that will include among other things technical specification, required quantities, delivery schedule and place, payment procedures etc. The request for quotation has to distribute among the selected suppliers by letter, Master list of Approved suppliers Suppliers of the Proven market players in the Industry Expert Reviews as Provided in Internet Suppliers Recommended by the inhouse Purchase Department Suppliers Recommended by Technical Consultant of the Project if hired
fax or electronic mail, indicating the last date by which the quotations will be submitted. At this stage the purchase department will also form a procurement committee incorporating members from different departments or other/external sources as required for the procurement.
iii. Collection and Evaluation of Quotations: Whenever a company receives responses against the
request for quotation, an assessment of offers has to be conducted for identifying the best evaluated quotation/supplier. The evaluation can be performed depending on several criteria such as proximity to the specification, offered price, delivery time, previous exposure in the field, supplier’s performance record etc. Evaluation Criteria The procurement committee will prepare a comparative analysis statement of the offers and recommend the most appropriate supplier. However, the final selection of the supplier will be determined subject to the approval of head of the company. After receiving approval, purchase department starts to negotiate with the selected supplier on offered price, quality and other different components.
iv. Contract Management: Purchase department is responsible for overall contract management with
assistance of finance department. After settling the issues and mutual consent from both sides, purchase department would issue a Purchase Order (PO) in favor of the company/best evaluated supplier providing final price, delivery schedule and place, and standard specification. Thereafter, the supplier would confirm the order issuing an invoice in favor of the company. Purchase department will be responsible for collecting all necessary documents against dispatched goods. The quality check of the received goods also needs to be conducted by the appropriate technical persons. Purchase department will be responsible for collecting all necessary documents against dispatched goods.
Offered Price
Proximity to Specification
Delivery Time
Reputation in Market
Previous Performance Record
Issues in Contract Management:
After receiving the goods, store department would issue Materials Receipt Report (MRR). The weight and quantity check of the goods needs to be performed by the store. In case of any damage, loss or unsuitability, an immediate report has to be sent to the purchase department providing the details. Purchase department will submit MRR along with other necessary documents to head of finance department for releasing the payment.
16.2 Procurement under Technical Assistance:
The procurement activities under IPFF II project would mostly concentrate on hiring consultancy services and procuring some goods including computer hardware and accessories, office equipment, and stationary under its TA Component. The consultancy service procurement would include hiring few firms and some individual consultants.
I. Procurement Objectives:
i. Ensure that purchased goods, works, non-consultancy services and consultancy services are fit for
purpose.
ii. Keep implementation delays low through appropriately planned and monitored procurement.
iii. Procure products at competitive market prices.
iv. Ensure that right quantities of required products, conforming to specified quality levels, are
delivered to intended locations in a timely manner.
v. Protect legitimate business interests of suppliers, contractors, and consultants with a view to
creating and maintaining confidence of the market in the purchaser which is necessary in the longterm interests of the purchaser.
II. Procurement Responsibility:
For procurement responsibility, the PIU will be responsible for all procurements under TA component. For the consultancy packages necessary for PPPA and BIFFL, IPFF II Project Cell will delegate Issuance and Confirmation of PO Confirmed Receipt Document against Dispatched Goods Issuance of Material Receipt Report (MRR) Ensure Records of Goods Ensure Approval of Record
procurement and contract management responsibility to PPPA and BIFFL. However, all such contracts shall be signed by PIU and payment will also be made by PIU. PPPA and BIFFL will provide all necessary technical supports to IPFF II Project Cell through signing Memoranda of Understanding (MoU). They have to ensure the procurement in compliance with applicable regulations and guidelines. For effective procurement management, these two organizations have to carry out the following roles:
i. Maintain organizational arrangements overseen by the heads of the organizations.
ii. Provide monitoring reports in connection with procurement to the PIU and IDA in an agreed
format.
iii. Maintain documentation for audit and other purposes as needed by the PIU and IDA.
In all applicable cases, PPPA and BIFFL will seek necessary concurrence from the appropriate authority (BB /IDA/FD/Cabinet Committee on Government Purchase (CCGP etc.) through IPFF II Project Cell. Upon confirmation of receipt of service/goods from PPPA and BIFFL with recommendation to pay bill, the PD will be responsible for payment from the project account.
III. Procurement Risks:
The main drivers to the risks are associated to capacity constraint of the agencies and delay in performing procurement contract management related activities. IV.Managing Procurement Risks:
In order to minimize the procurement associated risks, the following measures have been agreed upon with IDA (as referred in the PPSD of IPFF II Project). (i) PPSD and Procurement Plan: A PPSD has been developed by the IPFF II Project Cell, in agreement with the IDA, taking into account the volume of items to be procured, prevailing market conditions, activity level risks etc. The PPSD spells out the appropriate procurement strategy for this project. PPSD is a live document and it is to be updated at least annually. As an output of the PPSD exercise, initial Procurement Plan has been prepared. For each contract to be financed under the project, the different selection methods for procurement, market approach, contracting arrangement, estimated costs, prior review requirements and time frame were also agreed between IPFF II Project Cell and IDA in the Procurement Plan; (ii) Introducing Systematic Tracking of Exchanges in Procurement (STEP) System: STEP is introduced to prepare and manage procurement plan and procurement transactions under the project. The procurement plan will be updated semi-annually (or as required) using STEP system; (iii) Bid/Proposal Evaluation Committee: All procuring agencies shall ensure that the bid/proposal evaluation committees are formed in a manner acceptable to the IDA, and IDA’s no objection shall be required on the formation, as well as alteration in the composition or membership, of
the bid/proposal evaluation committees. Procurement consultant(s) of the project will be mandatory member(s) of the bid/proposal evaluation committee; (iv) Electronic Government Procurement (e-GP): Request for Bids (Open-National) contracts under the project will incrementally use the e-GP system of the country. National e-Government Procurement (e-GP) portal (i.e. http://eprocure.gov.bd ) of the GoB is developed, owned and being operated by the Central Procurement Technical Unit (CPTU), IMED of Ministry of Planning. The e-GP system provides an on-line platform to carry out the procurement activities by the Public Agencies - Procuring Agencies (PAs) and Procuring Entities (PEs). The e-GP system is a single web portal from where and through which PAs and PEs will be able to perform their procurement related activities using a dedicated secured web based dashboard. The e-GP system is hosted in e-GP Data Center at CPTU, and the e-GP web portal is accessible by the PAs and PEs through internet for their use. This online platform also helps them ensuring equal access to the Bidders/Tenderers and also ensuring efficiency, transparency and accountability in the public procurement process in Bangladesh; (v) Procurement Focal Person (PFP): BB shall nominate a procurement focal person. The appointed focal person will take necessary training in procurement, if required. The PFP will help BB in day-to-day procurement follow-up and preparation of periodic procurement reports; (vi) Local Procurement Consultant: BB will hire local procurement consultant. The consultant will lead and support all procurement related activities that need to be carried out as part of the preparation and implementation of the Project. The consultant will be a core member of the BB PIU and work closely with the focal persons of procuring agencies, especially BB PIU and all members of the PIU team; (vii) Other Due-diligence Measures: The following measures will be adopted as part of procurement and implementation arrangements: (i) all bid evaluation reports will include verification of recommended bidders’ post-qualification information; (ii) make bidders generally aware about fraud and corruption issues; (iii) preserve records and all documents regarding procurement (including correspondences with the potential bidders as well as complaints/clarification requests etc.), in accordance with the World Bank’s Procurement Regulations and Public Procurement Rules, to facilitate smooth procurement audit or postreview; and (e) publish contract award information on Central CPTU and BB’s website (and in United Nations Development Business (UNDB) online for international contracts).
V. Procurement Plan:
For each contract to be financed under the project, the different procurement methods or consultant selection methods, the need for pre-qualification, estimated costs, prior review requirements and time frame were agreed between the implementing agencies and the IDA in the Procurement Plan through
STEP system. All expected major procurements will be announced in the General Procurement Notice (GPN), published in the World Bank external website and UNDB. The procurement plan will be updated at least semi-annually (or as required) using STEP system of the World Bank. The procurement Plan, including its updates, shall include:
i. A brief description of the activities/contracts;
ii. The selection methods to be applied;
iii. Cost estimates;
iv. Time schedules;
v. The World Bank’s review requirements; and
vi. Any other relevant procurement information.
VI.Particular Methods of Procurement of Goods, Works and Non-consultancy Services:
Except as otherwise agreed in the Procurement Plan, goods and non-consulting services may be procured on the basis of Request for Bids (Open-International) procurement method. As allowed under the World Bank’s ‘Procurement Regulations’, July 1, 2016, other selection methods, market approach, and contract arrangement as agreed in the Procurement Plan on a case-by-case basis can also be used. Request for Bids (Open-National) [i.e. National Competitive Tender (NCT)], if allowed in the procurement plan will be carried out under the Bank’s Procurement Regulations following procedures for Open Tendering Method (OTM) of GoB (PPA, 2006) using standard/model bidding documents satisfactory to the Bank. For the purpose of Request for Bids (Open-National) the following shall apply:
i. Post bidding negotiations shall not be allowed with the lowest evaluated or any other bidder;
ii. Bids should be submitted and opened in public in one location immediately after the deadline
for submission;
iii. Lottery in award of contracts shall not be allowed;
iv. Bidders’ qualification/experience requirement shall be mandatory;
v. Bids shall not be invited or rejected on the basis of percentage above or below the estimated
cost.
VI. Methods of Procurement of Consultants’ Services:
The Procurement Plan will specify the selection method, market approach (International/National, Open/Limited/Direct) and contract modality for each of the selection of consultant following the World Bank’s “Procurement Regulations – July 1, 2016” or any other method, market approach agreed with the World Bank through the STEP system of the Bank.
VII. Use of Standard Procurement Documents:
For all procurements under the project, the Bank’s Standard Procurement Documents shall be used. In case of unavailability of a particular procurement document, the procuring agencies will use Model Tender Documents (MTD) agreed with IDA.
VIII. Prior Review:
The Procurement Plan shall set forth those contracts which shall be subject to IDA’s prior review. All other contracts shall be subject to Post Review by the IDA. Initial Procurement plan on prior review thresholds will be updated annually based on the review of the capacity and performance of the procuring entities and will be reflected in the updated procurement plan as appropriate. The prior review thresholds for different types of procurements under the project as per the Procurement Framework are as follows:
Procurement Prior Review Thresholds (USD millions) Type of procurement High risk Substantial risk Moderate risk Low risk Works (including turnkey, supply & installation of plant and equipment, and PPP) 5 10 15 20 Goods, information technology and non-consulting services
1.5 2 4 6
Consultants:
firms 0.5 1 2 4
Consultants:
individual 0.2 0.3 0.4 0.5
Notes:
Irrespective of the contract value, the following procurement activities are subject to the World Bank’s procurement prior review:
Procurement processes involving contract negotiations as, described in paragraphs 6.34-6.36 of
section VI of the Procurement Regulation for Borrowers;
Competitive dialogue;
Sustainable procurement; and
Best and final offer.
IX. Post Review/Integrated Fiduciary Review:
For compliance with the IDA’s procurement procedures, IDA will carry out sample post review of contracts that are below the prior review threshold. Procurement post-reviews will be done on annual basis depending on the number of post-review contracts.
IDA may use a third-party consultant to carry out post reviews. Any such third party shall carryout the reviews in accordance with the Terms of References (ToRs) provided to it by the IDA. Whether procurement is subject to prior or post review is determined on the basis of the project and contractspecific procurement risks. These risks are assessed by the IDA during project preparation. The requirement for a prior or post review shall be specified in the Procurement Plan.
X. Handling Procurement Complaints:
Complaints related to procurement under the TA component will be handled in accordance with Procurement Regulations of the World Bank. Complaints associated with procurement under on-lending components/ to sub-projects will be handled by the concerned private sponsor.
17. Financial Management
17.1 Accounting Policies and Procedures:
The accounting policies and procedures of IPFF II Project will be governed by the existing Project Accounting Manual of the MoF. All project-related transactions from all sources (IDA and GoB) will be accounted for separately on cash basis following double-entry bookkeeping principles.
17.2 Maintenance of Books of Accounts and Records:
BB will consolidate financial information and enter them into appropriate books of accounts/register and maintain supporting papers. BB and PFIs will preserve all procurement records and documents in accordance with provisions of the PPA 2006, PPR 2008 and the OM of IPFF II Project as applicable. These records will be available on request for audit/investigation/review by the Government and IDA. Furthermore, BB, PPPA, BIFFL and PFIs will retain their respective records of all project-related transactions for 5 years after completion of IPFF II Project or until the audit objections are resolved whichever comes later.
17.3 Accounting and Reporting:
i. Interim Un-audited Financial Report (IUFR):
BB will prepare IUFR and submit it to the IDA no later than 45 days after the end of each calendar quarter. The IUFR will include: (i) sources and uses of funds, (ii) uses of funds by project activity, (iii) designated account reconciliation statement, and (iv)other statements as advised by IDA. Reporting of expenditure under long- term infrastructure financing component in the IUFR will be based on PFIs’ disbursement of loans and other financing instruments (e.g. equity or guarantees) to project sponsors. As such BB will accumulate information of utilization towards funding private developers from the PFIs quarterly
ii. Annual Financial Statements:
BB will prepare the project’s annual financial statements after the end of a fiscal year as per the prescribed format of Foreign Aided Project Audit Directorate (FAPAD) or Project Accounting Manual and furnish to FAPAD. The annual financial statements include (i) Project Financial Statement; (ii) Designated Account Reconciliation Statement; (iii) Bank Account Information; (iv) Summary of Withdrawal Application (Special Account Replenishment) (v) Summary GoB Contribution and other statements as requested.
17.4 Audit and Financial Control System:
i. Internal Audit: Internal Audit Department of BB may carry out audit of IPFF II Project.
Moreover, independent audit firm may be appointed to conduct internal audit of IPFF II Project, if necessary. The observations and recommendations of internal audit will be reviewed and followed up upon receiving the internal audit report.
ii. External Audit: FAPAD will conduct external audit of IPFF II Project within six months
after the end of a fiscal year. IPFF II Project Cell will keep in touch with FAPAD to resolve audit observations/objections upon receipt of the external audit report. PD will be responsible for audit follow-up and for taking remedial actions.
iii. Project Audit Committee: To ensure that the observations and recommendations from
internal and external audits are reviewed and adequately followed up, a Project Audit Committee (PAC) will be constituted, if necessary. The PSC of IPFF II Project may decide on formation and Terms of Reference (ToR) of the PAC.
17.5 Bank Accounts Management:
For receiving and utilizing IDA fund, a Dollar Special Account (DOSA) will be opened with Forex Reserve & Treasury Management Department (FRTMD) of BB and for receiving and utilizing GoB counterpart fund, a local currency account will be opened with Accounts and Budgeting Department (A&BD) of BB. Furthermore, an operating account (non-interest generating) may be opened with a
schedule commercial bank selected by IPFF II Project Cell, if deemed necessary. On the other hand, for
receiving the repayment of Facility Loan made by the PFIs and depositing momentarily, two repayment accounts (one in USD and the other in BDT) will be opened and maintained with the FRTMD of BB. The designated PD and in his/her absence an alternative official will be the authorized for operating these accounts. The operation of DOSA will be governed by the directives of FD. On the other hand, the operation of TAKA Account and Operating Account will be governed by applicable rules and procedures. However, policy for transferring the balance with the repayment accounts to government treasury will be formulated by PSC of IPFF II Project or FD of MoF. The operating account, DOSA & TAKA account, so maintained for the fund management will be closed as per rules with the approval of competent authority at the end of IPFF II Project. On the other hand, repayment accounts will be closed with the approval of competent authority after all Facility Loans are fully repaid by PFIs and repayments are transferred to Government Treasury.
17.6 Fund Management:
Report based disbursement procedures are applicable for withdrawal of IDA funds. As such for eligible expenditures to be financed by IDA, IPFF II Project Cell will submit withdrawal application, in accordance with World Bank’s Disbursement Guidelines, to the World Bank based on the forecast for two quarters. IPFF II Project Cell will ensure that project funds routed through the Designated Account is reflected in the GoB accounts as well as in the consolidated FM Report. As for GoB’s share of eligible expenditure, IPFF II Project Cell will make necessary arrangements for withdrawal of fund from Chief Accountant’s Office (CAO) of FD subject to necessary budget allocation following prevailing procedures. IPFF II Project Cell will apprise FD and Office of CAO regarding the use of IDA and GoB funds complying with the Project Accounting Manual. The contribution to the Subproject to be made under IPFF II Project (out of IDA and GoB fund) will solely be used in line with the Project Development Objectives. IPFF II Project Cell will ensure that the on-lending fund is routed to the approved private investors through eligible PFIs. The TA fund will be used by IPFF II Project Cell for hiring consultants, procuring goods, arranging training and workshops, and conducting day to day operations as per Technical Assistance Project Proposal (TAPP). All expenses including advance for travel and operating expenses will be paid through banking system. Government’s existing rules and procedures outlined in the Project Accounting Manual with respect to authority and payment responsibility as well as prevailing delegation of financial powers will be applicable for using TA fund. However, delegation of financial power will not be applicable during extending any facility to the PFIs against specific Subproject. Rather the rules and procedures outlined in this manual will be applicable for disbursement of on-lending fund. Upon closure of IPFF II Project, IPFF II Project Cell will refund unspent funds, if any, lying with the DOSA and TAKA Accounts to the IDA and the GoB respectively after documenting all eligible expenditures. In doing so, IPFF II Project Cell will have to get concurrence/approval of MoF and IDA.
18. Monitoring and Reporting
IPFF II Project Cell will monitor the outcomes from the utilization of fund under the facility periodically through the quarterly reports submitted by the PFIs. In addition to the off-site supervision, the IPFF II Project Cell, may conduct surprise onsite inspection of the PFIs and the Subproject to ensure the effective end-use of the fund. Necessary formats of reports will be given to the PFIs for Subproject report. A format of the quarterly reports to be submitted by the PFIs to BB is attached in Annexure 8 IPFF II Project Cell will be required to ensure that the PFIs will:
i. Comply with the reporting and monitoring requirements as prescribed by BB/IPFF II Project
Cell/IDA
ii. Verify the status of investment projects supported under the IPFF by on-site inspection, as
required for effective use of resources during and after construction.
iii. Prepare investment loan portfolio management and progress reports covering outstanding loans
under the Credit to be submitted to IPFF II Project Cell and IDA as and when required.
iv. PFIs will submit annual audit reports to IPFF II Project Cell and IDA within four months of the
end of the year.
v. Each PFI will maintain a separate database system with adequate backups regarding IPFF II
facility loans.
19. Environmental and Social Risk Management
i. Environmental and Social Management System: Environmental and social risk management
approach for IPFF II is described in IPFF II E & S Policy and Procedures that have been prepared by BB and are expected to evolve over time based on the principle of continuous improvement. BB will work with PFIs to assist them with establishing sound ESMS, to ensure PFIs meet minimum eligibility criteria for accessing IPFF II funding and continue to improve their systems thereafter.
ii. Stakeholder Engagement and Grievance Redress Mechanisms: Grievance redress
mechanisms are an integral part of stakeholder engagement process. IPFF II Project will have a multi-level process for addressing grievances from project-affected communities. IPFF II Project Cell and the PFIs will ensure that information about accessing available grievance redress mechanisms at IPFF II Project Cell and PFI levels (as part of the PFIs’ ESMS) is made available by project sponsors as part of the overall stakeholder engagement process. These mechanisms are complementary to the Subproject-level grievance mechanisms to be established by project sponsors as part of Performance Standards requirements. Grievance redress mechanism of IPFF II Project has been prepared and attached as Annexure 10.
iii. E&S Capacity Building: Following the positive experience of Financial Institutions
Development Project (FIDP) and IPFF, capacity building will also be provided under IPFF II Project. The Project’s TA component will have allocations for retaining qualified technical, financial, and E & S risk assessment and management expertise to support the build up of capacity and skills across the ecosystem, including the Government authorities responsible for preparation and approval of infrastructure projects, including PPPs; financial institutions involved in financing the projects; and private sector sponsors investing in the projects. IPFF II Project Cell, jointly with other public sector agencies, will organize workshops (with inputs/participation of local and international consultants) on pertinent issues related to infrastructure project finance and implementation. IPFF II Project Cell will also provide opportunities for training abroad or incountry to the PFIs. Detailed E&S capacity building plan is incused in IPFF II E&S Policy and Procedures.
iv. IPFF II Environmental and Social Due Diligence and Supervision Process:
Implementation support, incl. post-review (WB) Feedback and revisions DoE clearance and Obtaining ECC IPFF II E&S Eligibility Criteria met Subproject approval by IPFF II is communicated to the PFI and Project Sponsor PFI includes E&S conditions in subproject documentation with private sponsor (including ESAP) Subproject implementation (monitoring by project sponsors, PFIs, IPFF II Project Cell with assistance of E & S performance monitoring implementation partner) Annual renewal of ECC (project sponsors)
APPENDIX
Definitions
which financing will be sought from the PFI from the proceeds of the Credit; such ESIA must include ESMPs as commensurate with the outcomes of the environmental and social risks and impacts identification process for the Subproject, and an ESAP as needed.
9. “ESMPs” means, collectively, the Environmental and Social Management Plans, prepared and to be
prepared in accordance with the ESMS and pursuant to the requirements of the World Bank Performance Standards, providing for detailed measures to mitigate adverse environmental and social risks and impact of Investment Projects/Subprojects.
10. “ESAP” means, collectively, the Environmental and Social Action Plan (or, Action Plan) to be
prepared by Investment Sponsors included in the contract documentation between such Investment Sponsor and the PFI in relation to a Subproject, which said Action Plan shall include, inter-alia: (i) description of the necessary actions to implement mitigation measures or corrective actions to be undertaken; (ii) prioritization of said actions; (iii) timeline for actions’ implementation; (iv) disclosure to the affected communities; and (v) schedule and mechanism for external reporting on the Action Plan’s implementation.
11. “Facility” or “Investment Promotion and Financing Facility II” or ‘`IPFF II’’ means the facility to be
created within BB following approval of IPFF II Project for the purposes of providing Facility Loans to PFIs to be utilized for financing infrastructure Investment Projects/Subprojects through the provision of Infrastructure Financing.
12. “Facility Access Agreement” or “FAA” means each agreement to be entered into between BB and
each PFI setting out the terms and conditions of the Facility Loan to be made to such PFI in accordance with the requirements of the Operations Manual and Part C of Schedule 4 to the FA of IPFF II Project.
13. “Facility Loan” means any loan provided by BB to PFIs under FAA for the purpose of providing
Infrastructure Financing.
14. “Fiscal Year” means the GoB’s Fiscal Year commencing on July 1 and ending on June 30 of the
following year.
15. “General Conditions” means the “International Development Association General Conditions for
Credits and Grants”, dated July 31, 2010, with the modifications set forth in Section II of the
Appendix of FA of IPFF II Project
16. “Investment Sponsor” means a private enterprise or an enterprise in which private shareholders have
majority ownership, and to which a PFI proposes to make or has made an Infrastructure Financing.
17. “Infrastructure Financing” means either: loans, or guarantees, or equity and/or any other financing
instrument appropriately developed, assessed and approved and made available by a PFI out of the proceeds of the Facility for financing Subprojects, each in accordance with criteria, requirements, and procedures set out in the OM.
banking system; (b) costs associated with rental of training and workshop facilities, preparation and reproduction of training and workshop materials, costs of academic degree studies, and other costs directly related to training course, workshop or study tour preparation and implementation, but excluding salaries of civil servants and honorarium of any other nature.
29. “World Bank Performance Standards” mean the eight IFC Performance Standards that have been
adopted by the World Bank as the World Bank Performance Standards for Projects Supported by the Private Sector for application to World Bank support for projects (or components thereof) that are designed, owned, constructed and/or operated by a private entity, in lieu of the World Bank’s safeguard policies.
Annexure 1
Eligibility Criteria for Enlistment as PFI
Notes:
The portfolio amount, on which the provision calculations are based, should be consistent with the portfolio amount used elsewhere. If there is a difference among the portfolio figures used in another criterion, explanation and supporting calculations should be provided. Portfolio Calculation:
The total portfolio amount should include the following (if applicable) – Lease receivables (including the current portion and not net of provision amount) Term finance (including the current portion and not net of provision amount) Short-term finances Equity investments Receivables against bill discounting Advances against lease finance and term finance Others Criterion 3: Positive rate of real return PFIs must have a positive rate of real return which will be calculated as following:
(net earnings after tax for the period / average stockholders’ equity) x 100 1 + the inflation rate [in decimal form] Noted Points:
The average stockholders’ equity calculation should exclude any dividend amount paid or proposed to be paid within 6 months of year-end. This criterion needs to show the real rate of return. The year-end inflation rate to be used is provided in BB publications, such as Economic Trend. Criterion 4: Capital adequacy ratio PFIs must meet the minimum regulatory capital adequacy requirement as instructed by BB. PFIs must show the detailed calculation of risk-weighted assets and breakdown of total capital. Criterion 5: Leverage ratio PFIs must meet the minimum leverage ratio as instructed by BB. Leverage ratio will be calculated as Tier 1 Capital (after related deduction) Total Exposure (after related deduction) Criterion 6: Foreign currency net open position PFIs dealing in foreign currency must meet regulatory requirement on foreign currency net open position as instructed by BB.
Criterion 7: Non-performing loan (NPL) ratio
PFIs must have an acceptable level of non-performing loan not more than 10 % (ten percent). Criterion 8: Single or Business group borrower exposure PFIs must meet single or business group borrower exposure limit as per BB regulation. Noted Points:
The PFI would have to provide the top-ten list of exposures.
Exposure is defined to include both on and off-balance sheet exposure.
The definition of Single or Business Group shall be consistent with BB regulations Criterion 9: Insider lending ratio PFIs must meet minimum insider lending ratio as instructed by BB. Noted Points:
The auditors will have to certify that BB definition of ‘insider lending’ has been followed. The PFI will provide the list of clients under ‘insider lending’. The PFI would have to confirm that the loans / leases are on a standard commercial basis. This means they are not on concessionary terms e.g. in relation to interest rates, fees, tenors, amortization & repayment, collateral requirements, etc. If the loans / leases are not on a standard commercial basis, the FI would have to specify the concessionary terms and explain the reason. Criterion 10: External credit rating PFIs must have minimum external credit rating of BB Rating Grade 3 or equivalent rating by external credit assessment institutions (ECAIs) recognized by BB Criterion 11: Three years’ financial accounts with clean auditor’s opinion without implied / hidden qualifications “Hidden or implicit” qualifications are comments in the notes to the financial statements, which are material and would have a significantly adverse impact on the financial performance and or financial position, if fully considered, but are not explicitly mentioned in the official opinion of the auditors. Criterion 12: Policy documents to establish professional and sound management
i. PFIs must have adequate policies and procedures related to core risk management as prescribed
by BB. They must ensure the compliance and submit the documents as asked by IPFF II.
ii. PFIs must have qualified and experienced management, adequate organization and institutional
capacity for its specific risk profile. They must comment on appropriate capacity, including
staffing, for carrying out appraisal (including environmental and social assessment) of infrastructure financing/loans to sponsors and for supervising implementation thereof.
iii. PFIs must inform an incident of misconduct or reputational crisis, if any, in written form.
Criterion 13: Environmental and social risk management (ESRM) requirement PFIs shall have adequate systems and capacity for environmental and social risk management in accordance with Bangladesh regulations and World Bank5 Performance Standards. Based on the E&S systems and capacity assessment, as conducted by BB, PFIs shall meet the following minimum eligibility criteria in order to be considered for financing under IPFF II (these shall be in place before disbursement of financing by BB): PFIs must meet the following requirements:
i. Written E& S policy and procedures are in place and approved by the PFI’s senior management.
ii. PFI designates staff with clearly defined responsibilities for E&S risk management.
iii. PFI expresses commitment to taking part in E&S training and capacity building activities of BB.
iv. PFI has read and understood the ESPP document for IPFF II and demonstrates willingness to
comply with it.
Criterion 14: Annual external auditors’ certification as to compliance with quantitative eligibility criteria PFIs must submit their eligibility assessment based on the current year-end accounts every year within the period specified by IPFF II Project Cell.
5 Environmental and Social Performance Standards refer to the “World Bank Performance Standards”, which are IFC Performance Standards on Environmental and Social Sustainability adopted as the “World Bank Performance Standards” in 2013 pursuant WB Operational Policy 4.03. IFC Performance Standards were first introduced in 2006 and updated in 2012.
Annexure 2
Exclusion List
The Project shall not fund any of the following activities:
Production or trade in any product or activity deemed illegal under host country laws or regulations or international conventions and agreements, or subject to international bans, such as pharmaceuticals, pesticides/herbicides, ozone depleting substances, PCBs, wildlife or products regulated under CITES. Production or trade in weapons and munitions.1 Production or trade in alcoholic beverages (excluding beer and wine).1 Production or trade in tobacco.1 Gambling, casinos and equivalent enterprises.1 Production or trade in radioactive materials. This does not apply to the purchase of medical equipment, quality control (measurement) equipment and any equipment where the Association considers the radioactive source to be trivial and/or adequately shielded. Production or trade in un-bonded asbestos fibers. This does not apply to purchase and use of bonded asbestos cement sheeting where the asbestos content is less than 20%. Drift net fishing in the marine environment using nets in excess of 2.5 km. in length. Any activities involving international waterway (as defined in the Association’s Operational Policy 7.50), or disputed territories (as defined in the Association’s Operational Policy 7.60) A reasonableness test will be applied when the activities of the project company would have a significant development impact but circumstances of the country require adjustment to the Exclusion List. All PFIs, except those engaged in activities specified below, must apply the following exclusions, in addition to the above described Exclusion List:
Production or activities involving harmful or exploitative forms of forced labor2 /harmful child labor.3 Commercial logging operations for use in primary tropical moist forest. Production or trade in wood or other forestry products other than from sustainably managed forests. Footnotes:
1This does not apply to Investment Sponsors who are not substantially involved in these activities. "Not substantially involved" means that the activity concerned is ancillary to an Investment Sponsor's primary operations. Forced labor means all work or service, not voluntarily performed, that is extracted from an individual under threat of force or penalty. 3Harmful child labor means the employment of children that is economically exploitive, or is likely to be hazardous to, or to interfere with, the child's education, or to be harmful to the child's health, or physical, mental, spiritual, moral, or social development.
Annexure 3
List of Environmentally and Socially Sensitive Activities PFIs will not be permitted to finance Subprojects associated with activities listed in (a)-(d) below where they, following an assessment process of the PFI’s systems and capacity for environmental and social risk management conducted by Bangladesh Bank, have been found to lack adequate capacity to assess, manage, and monitor environmental and social risks associated with Subprojects for which financing will be sought from the PFI from the proceeds of the Credit. (a) Activities involving large-scale physical and/ or economic displacement1 resulting from landrelated transactions2 (b) Activities in or near critical habitats3 and /or legally protected areas. (c) Activities involving adverse impacts on tribes minor races, ethnic sects and communities.4 (d) Activities involving significant adverse impacts on critical cultural heritage5 areas. Footnotes:
In the context of this project, activities involving large-scale physical and/or economic displacement are those that are expected to affect 200 people or more. 2 As defined in the Performance Standard 5 (paragraph 5). 3 Critical habitat is a subset of both natural and modified habitat that deserves particular attention. Critical habitat includes areas with high biodiversity value that meet the criteria of the World Conservation Union (IUCN) classification, including habitats of significant importance for required for critically endangered or endangered species as defined by the IUCN Red List of Threatened Species; habitats of significant importance for endemic or restricted-range species; habitats supporting globally significant concentrations of migratory species and /or congregatory species; areas with unique assemblages of species or which are associated with key evolutionary processes. Primary Forests or forests of High Conservation Value shall be considered Critical Habitats. 4 The term “tribes minor races, ethnic sects and communities” is used in a generic sense to refer to a distinct social and cultural group possessing the following characteristics in varying degrees:
Self-identification as members of a distinct cultural group and recognition of this identity by others; Collective attachment to geographically distinct habitats or ancestral territories in the project area and to the natural resources in these habitats and territories; Customary cultural, economic, social, or political institutions that are separate from those of the mainstream society or culture; or A distinct language or dialect, often different from the official language or languages of the country or region in which they reside. 5Critical cultural heritage consists of (i) the internationally recognized heritage of communities who use, or have used within living memory the cultural heritage for long-standing cultural purposes; and (ii) legally protected cultural heritage areas, including those proposed by host governments for such designation.
Annexure 4
Loan Application for Availing Facility Loan
Name and address of the lead/lone PFI with contact person: -----------------------------------------
Name of the contact person with phone number: --------------------------------------------------------
Name and address of other syndication members:
i. ----------------------------------------------------------------------------------------------------------------
ii. -----------------------------------------------------------------------------------------------------------------
iii. -----------------------------------------------------------------------------------------------------------------
Section A: Particulars of the Infrastructure Project
Name of the infrastructure project: -------------------------------------------------------------------------
Sector: ----------------------------------------------------------------------------------------------------------
Location of plant/ site of the project: -------------------------------------------------------------------
Name of the ministry/division/ executive agency of GoB/regulator: ------------------------------
Letter of intent/ license issue date: -------------------------------------------------------------------------
Concession and other relevant agreements signing date: ------------------------------------------------
Description of the project:
i. Rated capacity of the plant or maximum capacity of the project: ----------------------------------
ii. Budgeted (expected utilization) capacity (in percent): ------------------------------------------------
iii. Break even capacity (in percent): ----------------------------------------------------------------------
iv. Expected economic life of the project: -------------------------------------------------------------------
v. Purpose of the loan: ----------------------------------------------------------------------------------------
vi. Provide a brief description of the project and its development history: ----------------------------
Attached a copy of the agreement, if any, between the PFI and the investment sponsor: -----------
If the loan already sanctioned to the investment enterprise/Subproject, please provide a copy of
sanction letter of the PFI. Approved the loan by i) MD/CEO, ii) Board iii) Credit Committee or iv) others: ------------------------------------------------------------------------------------------------------
Required financial closure deadline: ---------------------------------------------------------------------
Required commercial operations date: -----------------------------------------------------------
Provide a breakdown of the project cost:
Cost Components Amount in Million (in BDT or USD ) In Percent Total fixed cost of the project Initial working capital Total cost of the project Assessment of working capital required should be attached.
Description of land of the subproject
i. Where applicable, if land of the project is owned or leased or rented or held otherwise by the
Investment enterprise and provide evidence: ---------------------------------------------------------------
ii. Where the project/ the investment enterprise owns the land and building: Valuation of land and
building assessed by: Credit risk manager / Credit officer of PFI/ Enlisted surveyor of PFI: --------
------------------------------------------------------------------------------------------------------------------- Please mention and attach copy of the assessment report.
iii. Where land and building, if any, of the project is leased or rented, is there any covenant in the
lease agreement for premature or short notice termination of the agreement: Yes/ No ------------ If Yes, please mention the condition(s) below: ----------------------------------------------------------
17. If any security/ collateral taken from the Investment Sponsor or the promoters: Yes/ No---------
If Yes, i. Description of the collateral: ---------------------------------------------------------------------
ii. Realizable market value: BDT (in million) --------------------------------------------------------
iii. Value assessed by PFI’s Credit Risk Manager/ Officer/ Enlisted surveyor: BDT (in million) -
Section B: Particulars of the Investment Sponsor6
18. Name of the investment sponsor: ---------------------------------------------------------------------
Investment Sponsor means a private enterprise or an enterprise in which private shareholders have majority ownership, and to which a PFI proposes to make or has made an Infrastructure Financing.
Description of investment sponsor’s business----------------------------------------------------- Address, telephone, fax and e-mail of the main office: -----------------------------------------
19. Address, telephone, fax and e-mail of registered office ---------------------------------------
20. Mailing address: --------------------------------------------------------------------------------------------
21. Name and address of company secretary: ------------------------------------------------------------
22. Date of incorporation: -------------------------------------------------------------------------------------
23. Please enter the shareholding and management structure of the investment sponsor in the table
below:
(a) Board of Directors/Partners/Sole proprietor Name & address Age Nationality % Ownership Position in the Company Personal net worth (million BDT/USD) (b) Management Name Position Numbers of years with the company Year started in position Previous employers & with years (if present position is less than 3 years)
24. Please provide the names and specimen signatures of two representatives (one authorized and one
alternate) authorized to deal on behalf of the investment sponsor with IPFF II Project with respect to this facility:
Name Position Signature
Section C: Particulars of the Promoters7
25. Name of the promoters : -----------------------------------------------------------------------------------
Please provide a brief description of the nature of the promoters’ business: -----------------------
7The Promoter may be a proprietor, partnership or a company or a joint venture, who applied to the government for award of the project and to whom the LOI has been awarded.
Please provide name and address including telephone and e-mail of auditors appointed/to be
appointed by the promoters: ---------------------------------------------------------------------------------- Is there any legal action pending for or against any of the promoters/directors, officers or directors of any of affiliates of the investment promoters: Yes / No --------------------------------------------- a. If yes, please describe below in detail: ------------------------------------------------------------------ b. Please provide opinion of PFI’s lawyer/legal advisor on any possible legal risk that may arise out of the pending legal proceedings and the likely bearing on the business of the promoters:
Particulars of all affiliated companies: BDT (in million)
Company
Name
Year
Established
Nature of
Business
Nature of
Affiliation
Sales Net
Worth
Return on
Investment
(percent)
Banker(s) Total outstanding
Loans and
Advances
Total
Classified
Loan
Classified
Loan in percent
1 2 3 4 5 6 7 8 9 10 11=10/9x100
Is credit information bureau (CIB) report of the investment sponsor and its group members clean:
Yes/ No ----------
If Yes, please enter print date and provide a copy of the CIB Report: ----------------------------------
Section D: Financing Plan
Equity participation by all the sponsors:
Name of the sponsors Amount in million (BDT or USD) 2.
Total
List the amount to be financed by the PFI and other lenders:
Name of the PFI or other Lenders
Loan Type Interest
Rate
Tenure Grace
Period
Amount in million
(BDT or USD)
Status (approved
/ under process)
IPFF II Facility
Sub Total
Non-IPFF part
Amount of facility loan (loan requested from IPFF II) : ----------------------------------------------
Particulars of facility loan (loan from IPFF II):
a. Indicative schedule of loan disbursements required from IPFF II and PFIs:
Milestone Date Amount Source b. Indicative schedule of loan repayment dates (IPFF II to PFI and PFI to Sponsors):
Date Amount
Section E: Feasibility of the Project:
Ratio analysis: Provide a copy of financial modelling of the investment project:
( The ratios should be calculated taking into account total loans including IPFF II loan facility requested for) Industry Average* YR-2 YR-4 YR-6 YR-8 YR-10 YR-12 YR-15 Liquidity Ratios Current ratio 2:1 Quick ratio 1:1 Leverage Ratios Debt Equity Ratio 75:25 Debt Service Coverage Ratio(DSCR) 1.2~1.6 Interest Coverage Ratio Greater than 1 Profitability Ratios Gross Profit Margin Net Profit Margin Operating ratio Return on Asset Ratio Greater than cost of fund Sub Total Grand total
Return on equity Ratio Greater than cost of
Equity*
Activity
Ratios
Total Asset Turnover Ratio
Fixed Asset Turnover Ratio
*Averages mentioned are usual and indicative and vary from Industry to Industry. Cost of fund= Weighted cost of equity and borrowed fund. *Cost of Equity= Opportunity cost of equity.
34. Cost of fund:
Year 2 Year 4 Year 6 Year 8 Year 10 Year 12 Year 15 Please also furnish the following activity ratios, if the condition stated there against holds good:
Condition Industry average
YR-2 YR-4 YR-6 YR-8 YR-10 YR-12 YR-15
When sales not captive and/ or payment not guaranteed Average Collection Period (days) When supply of fuel, raw material etc not captive and/ or payment not guaranteed Average payment Period (days)
35. Loan life coverage ratio (LLCR):
(NPV of available cash for debt service up to the maturity of the loan divided by principal outstanding) Year-2 Year-4 Year-6 Year-8 Year-10 Year-12 Year-15
36. Cash flow analysis:
Pay Back Period of the project (number of years) Internal Rate of Return(IRR)
37. Risk factors:
Please tick if YES or NO for the followings: YES NO N/A (Please mention Why Not Applicable) a. If spare parts guaranteed b. If technical know how provided or guaranteed
c. If uninterrupted supply of raw material guaranteed
d. If uninterrupted supply of fuel and power guaranteed e. If sales captive or guaranteed f. Is the management experienced in similar business
38. Technical viability of site of the plant/ project:
Please tick Yes or No if site of the project is viable in respect of the followings:
Yes No N/A (Please mention Why
Not Applicable) a. Proximity of supplies (raw material, fuel, power, spare parts, technical know how etc) b. Proximity of customers/market
c. Availability of local and associated infrastructure, including
utilities, transportation, communication and off take capabilities. d. Availability of access rights, local consent, license etc e. Suitability of ground and local climate conditions f. Availability of local technical and suitable management staff and skilled labor for operation. g. Availability of local equipment, material, spare parts and sub contractors for construction. h. Minimizing cost of land, construction and operations
i. Scope for setting out of the works and expansion
j. If located above flood level
If site of the project is not viable in respect of any of the above factors, please mention below how the problem will be mitigated ------------------------------------------------------------------------------------------------------------------------------
39. Provide the project appraisal report and/or information memorandum(IM) prepared by the PFI: ----
40. Provide a copy of feasibility study report by ministry/division/investment sponsor: ---------------------
Section F: Procurement Aspects
41. Provide a copy of best/standard commercial practices for procurement activities undertaken by the
subprojects as per OM of IPFF II Project
42. Tick the method of selection of the promoter : Whether:
The executing agency selected the promoter competitively following international competitive bidding (ICB) The executing agency selected the promoter through competitive bidding other than ICB Selection of the promoter through competition is not possible, e.g. expansion by an existing concessionaire or captive power plants Selection of the promoter, not through public tender (no concession), but through an open licensing process For projects awarded on the basis of competition, please provide:
1. A copy of the advertisement for expressions of interest in the project
2. A copy of the request for proposal (RFP)
3. A copy of the proposal submitted by the Company which was the basis for selection and
issuance of the Letter of Intent
4. Other relevant information
43. Please provide the plan of procurement of major plant and equipment by the promoter8
. In case of existing plant, please provide the name and process of major equipments procurement including documents:
Name of the machine
Country of Origin Model Number of
Machines
Total Rated
Capacity
Value in Million BDT
Section G: Environmental and Social Compliance
44.IPFF II requires that the project:
i. be screened for potential environmental and social impacts
ii. meet national environmental, labor, and social requirements
iii. avoid any excluded activities
iv. comply with World Bank Performance Standards9
45. Please enter the current phase and progress of development of the project in the table:
Phase Percentage
Accomplished
Preconstruction
Construction
Operation
46. Environmental and Social Risk Rating
a. Please indicate the environmental category of the project as per Department of Environment (DoE): Green/Orange A/Orange B/ Red:__________________________________________ b. Date DoE category was assigned : ________________________________________________
c. Please indicate E&S risk rating as per Bangladesh Bank ESRM Guidelines and IPFF II E&S
Policy (on the basis of E&S risk screening or ESIA, as available):
High Risk
Medium Risk
including L/Cs, if any
9 Environmental and Social Performance Standards refer to the “World Bank Performance Standards”, which are IFC Performance Standards on Environmental and Social Sustainability adopted as the “World Bank Performance Standards” in 2013 pursuant WB Operational Policy 4.03. IFC Performance Standards were first introduced in 2006 and updated in 2012.
10 The term “tribes minor races, ethnic sects and communities” is used in a generic sense to refer to a distinct social and cultural group possessing the following characteristics in varying degrees:
Self-identification as members of a distinct cultural group and recognition of this identity by others; Collective attachment to geographically distinct habitats or ancestral territories in the project area and to the natural resources in these habitats and territories; Customary cultural, economic, social, or political institutions that are separate from those of the mainstream society or culture; or A distinct language or dialect, often different from the official language or languages of the country or region in which they reside. 11 Critical habitat is a subset of both natural and modified habitat that deserves particular attention. Critical habitat includes areas with high biodiversity value that meet the criteria of the World Conservation Union (IUCN) classification, including habitats of significant importance for required for critically endangered or endangered species as defined by the IUCN Red List of Threatened Species; habitats of significant importance for endemic or restricted-range species; habitats supporting globally significant concentrations of migratory species and /or congregatory species; areas with unique assemblages of species or which are associated with key evolutionary processes. Primary Forests or forests of High Conservation Value shall be considered Critical Habitats.
g. Documents to be submitted:
Date of Environmental and Social Impact Assessment or Environmental and Social Audit, as available (please attach) ___________________________________________________ Please furnish a copy of SCC/ESIA/ECC, if obtained from DOE List E&S risk management plans available from Investment Sponsor__________________ _________________________________________________________________________ Resettlement Action Plan (if applicable) ________________________________________ Please furnish Environmental and Social Action Plan (ESAP) prepared by the financial institution and agreed with the Investment Sponsor to ensure compliance with World Bank Performance Standards
49. Environmental and Social Management System (ESMS)
a. IPFF II requires that PFIs shall meet the following minimum eligibility criteria in order to be considered for financing under IPFF II (these shall be in place before disbursement of financing by BB):
Minimum ESRM Eligibility Criteria Remarks
(Yes/No)
1 Written E&S policy and procedures are in place and approved by the PFI’s CEO/MD/ Board of Directors 2 PFI designates staff with clearly defined responsibilities for E&S risk management senior management are in place 3 PFI expression commitment to taking part in E&S training and capacity building activities of BB b. Please state if the financial institution has an E&S policy approved by senior management (is yes, attach a copy)
c. Please indicate if there is staff formally responsible for E&S risk management
d. Please describe E&S monitoring arrangements for the investment e. Current E&S performance rating as per IPFF II E&S Policy (if one is assigned) ____________
50. DoE Clearance to be obtained depending on the category of the project is given below:
Please tick YES or NO and, if NO, enter the expected date of delivery for the applicable category only Category of the Project DoE Certificate Obtained or Not YES NO If ‘NO’, expected date of receiving Certificate Green Environmental Clearance Certificate (ECC) Orange-A/ Orange-B Site Clearance Certificate (SCC) ECC Red SCC Approval of TOR for EIA/ESIA Approval of EIA/ESIA ECC
12 5Critical cultural heritage consists of (i) the internationally recognized heritage of communities who use, or have used within living memory the cultural heritage for long-standing cultural purposes; and (ii) legally protected cultural heritage areas, including those proposed by host governments for such designation.
Annexure 5
Document Checklist
(Please tick (√), if Yes. If No, write the appropriate Status /reason in the Remarks column) Documents Check Comment General Aspects
Documents Check Comment
Sponsors/ Promotors
12. Experience of Sponsors in implementing similar Project
13. Sponsor Details:
a) Profile/ Corporate Background and Experience b) Last three years audited balance sheet and income statement c) Clean, current Credit Information Bureau Report (no more than 90 days old from submission of the proposal), all local shareholder directors and associated companies. Lender's/ Financial Aspects
14. Proposed Financing Arrangement of the project confirms IPFF II
requirement
15. Arrangement of utilization of equity (amount and in percentage) by the
sponsors
16. Arrangement of sharing the rest of the financing (excluding IPFF II and
sponsor’s equity)by PFI’s own resources and/or other institutions
17. Investment Project Payment/Amortization Schedule along with terms and
condition (indicative) a) Repayment from PFI to BB b) Repayment from Investment Project to PFI
18. Financial Model including debt service coverage ratio and other financial
ratios / statements
19. Independent Engineer’s Report, if any
Procurement Aspects
20. Details of Sponsor’s Procurement Process with evidence including
submitted tender documents, RFQ, RFP, newspaper clippings etc.
21. Procurement Plan of the Sponsor’s for major machineries and equipment
with current status.
22. Standard commercial practices followed in procurement
23. Undertaking of PFI and Sponsor that the assets will be procured as per
procedures described in the OM under the proposed financing.
Commercial Aspects
24. Copy of Concession Agreement(s)
25. License from relevant Regulatory Authority
26. Consent/permit from Local Administrative Authority.
27. Arrangement of Insurance policy for usual risks
28. Copy(ies) of EPC contract / Turnkey contract / Spare parts supply contract
/ O &M contract / Equipment supply contract / Civil construction contract / Land development contract / any other relevant contracts
Documents Check Comment
Environmental and Social Aspects
29. Compliance with environmental and social aspects as per DoE
requirements, and ESPP requirements of IPFF II Project.
30. Initial Environmental Examination (IEE) report
31. Environmental and Social Impact Assessment (ESIA) report
32. Feedback from Consultation with Stakeholders (if not included in ESIA
report)
33. PFI’s own Environmental and Social Assessment report (if any)
34. Resettlement Action Plan(RAP) (in case of Involuntary Resettlement), if
required
35. Indigenous peoples development plan (IPDP) if required
36. Clearance certificate of DoE enclosed (SCC, ECC etc.)
Annexure 6
Summary Details of Investment Project
Name of the PFI:
i) Profile and Appraisal of the Infrastructure Investment Project 01 Name of Investment Sponsor 02 Legal Status 03 Nature of business 04 Sub-sector 05 Location of the plant/project 06 Group Name 07 Cost of the project 08 Expected life of the project 09 Objective of the project. 10 Scope and strategy of the project. 11 Projected financials (BDT in milllion) : Average Revenue:
: Average Net Income:
: Average cash flow
: Average Equity
: Average Repayment
Yr 1-3 Yr 4-6 Yr 7-9 Yr 10-12 Yr-13-15
12 Technical feasibility of site of the project 13 Loan or Lease 14 Loan/Lease amount 15 Total group exposure of the Sponsor
If the Project was not awarded on the basis of Competition, description of the best commercial procurement practice used or will be used 17 Main Machinery and equipment to be procured, with value and country of origin (Attach detail list) Mach & Eqpt. Origin (BDT Value) 18 Sponsors repayment record 19 i) PFI’s appraisal report on the Investment project (enclose). ii)If the project already started operation, PFI’s appraisal report on viability and feasibility of the project on the basis of the latest audited/ unaudited Financial Statements, performance reports and compliance status of ESMP. 20 Financial plan (Equity and debt) 21 Description of assets to be financed 22 Sponsor-PFI relationship (new or existing) 23 Insurance status 24 Environmental Category of the project DoE:______ WB:_______
ii) Terms and conditions of the Infrastructure Financing 1 Purpose of the loan 2 Amount of the loan in BDT/USD 3 Period of Loan/Lease( max. 20 years as required) 4 Grace period 5 Maturity date 6 Interest rate( as per PFI’s lending practice) 7 Disbursement Schedule ( and amount disbursed, if any) Milestone, Date, Amount(Sch). Amount(Disb) 8 i) Repayment /Amortisation schedule ii) Does the Repayment /Amortisation schedule conform to amortisation schedule for Facility loan (Essentially, it must conform):
Enter/
Enclose
Yes/No
09 Description of Security
(Authorised signature of the PFI)
Annexure 7
Undertaking by the PFI
Annexure 8
Quarterly Report of PFI on Infrastructure Financing As on--------------- SL. Name of the Investment Sponsor Sector Loan No Sanction Date Sanction amount Disbursed amount as of--- Outstanding amount as of- -- Overdue Instalment amount Recovery during the quarter Cumulative recovery as of
Remarks
Annexure 9
Figure showing IPFF II Project Implementation Arrangements
IDA
GoB
BB PIU
(IPFF II Project Cell)
PFIs
TA Component
Advisory Services to
PPPA and BIFFL
PPPA BIFFL
IDA Credit:
USD 100 million Scale Up Facility
(SUF) + USD 256.70 million IDA
GoB Credit:
USD 60.00 million equivalent BDT
Project implementation services under the Administration Agreement with the GoB. Covered by the TA component BIFFL also a PFI and will deploy innovative infrastructure finance instruments Financing Component - BB loans to PFIs - under the Master Facility Agreement. Lending in USD and BDT, at fixed and variable rates for 8-20 years maturities. Private Infrastructure Projects Implemented by private sponsors. Government approved/endorsed (by appropriate authority/licensed by competent authority in applicable case). Complaint with all applicable country legislation, especially on E&S as confirmed by a relevant authority. Expected 25% sponsor’s equity. Key agreements governing IPFF II Between the GoB and IDA: Financing Agreement Between the GoB and BB: Administration Agreement Between BB and advisors: Technical Service Agreement Between BB and the PFIs: Master Facility Agreement (MFA, umbrella agreement for the PFIs’ participation in the project) and Facility Access Agreements (FAA, for individual loans to PFIs) PFI loans to infra projects. Lending at PFI rates for 8-20 years maturities. Max 20% of total Component 1 allocation per infrastructure project. Up to 50% of project cost can be financed by IPFF II Technical Advisors/ Consultants The TA component
Annexure 10
Grievance Redress Mechanism
Introduction:
The purpose of this document is to define the procedure for managing Subproject affected community’s concerns and complaints (referred to as “grievances”) in a planned, timely, and respectful manner. This grievance redress mechanisms has been prepared to fulfill the obligation of IDA for funding IPFF II project. The main purpose of this grievance redress mechanism is to effectively and proactively manage a community’s feedback, grievances or concerns with a Subproject about its operations. By facilitating a two way communication, a grievance mechanism can enhance outcomes by giving people satisfaction that their voices are being heard and that the authority of the Subproject would take necessary steps to resolve the issues. Objectives:
The objectives of the grievance redress mechanisms are to:
Provide accessible avenues for the project affected communities for those infrastructure projects that have been financed under IPFF, or are in the process of seeking financing, to contact IPFF II Project in order to lodge complaints; Provide a mechanism for addressing grievances of project affected communities in a timely and effective manner. Scope:
The grievance redress mechanism will manage grievances from project affected communities where IPFF II Project finance will be involved. It applies to all grievances that arise as a consequence of any related activity for projects financed through IPFF II (this includes any concerns or complaints about actions or impacts of any project contractors). This grievance redress mechanisms does not impede access to other judicial or administrative remedies that might be available under domestic law or through existing arbitration procedures. It should also be noted that each infrastructure project financed through IPFF II Project Cell will be requested to have in place a project-level grievance redress mechanisms that affected communities may use to raise their concerns with project developers. Sponsors will also be requested to make communities aware of the IPFF II grievance redress mechanisms. All complaints received under this procedure shall be tracked until close out. IPFF II will provide a timely response to every concern or complaint submitted, however reserves the right not to engage in a resolution process for a complaint which it reasonably considers no more than general, unspecified, and therefore un-actionable or concerns a matter for which IPFF II has no formal responsibility (for example, a matter that the government controls).
Submission of a Complaint to IPFF II Project Cell:
A complaint can be submitted by one or more individuals or groups who believe they are directly and adversely affected by an active IPFF II financed Subproject. The complainant can request to keep their identity confidential. In that case the personal details of complainants would only be made available to those involved in the resolution of the grievance in question. Unfortunately, anonymous complaints cannot be responded to by the IPFF II Project. However, if an anonymous complaint contains relevant information about specific IPFF II financed project related issues, IPFF II Project Cell will also forward it to the concerned Participating Financial Institution that financed that project for information and follow-up, where appropriate. Complaint(s) to IPFF II could be submitted directly by affected people in one of the ways outlinedbelow:
Via email: bb.ipff@bb.org.bd
Via fax: +88-02-9530193
Via mail:
Project Director
IPFF II Project Cell (24th Floor)
Bangladesh Bank, Head Office
Motijheel, Dhaka-1000
Grievance redress mechanisms process:
The grievance redress mechanisms process could be outlined as below:
Receive and Register
Grievance
Acknowledge Screen Investigate
Respond
Resolved Successfully Appeal
Follow up and close out
Registering Grievances:
Grievances will be logged in the Grievance Register within two days of receiving the grievance. Project Director of IPFF II Project will assign an IPFF II Project Cell official (grievance officer) to deal with the grievances. The concerned official will be responsible for:
Note from RegAlert. AI assistants can read this document in full, and search 70,000+ more, through the RegAlert MCP connector (https://mcp.regalert.today/mcp). Free with an account. How to connect ChatGPT, Claude or Cursor.
More like this from BB
We email you every new BB publication the day it's published.
Source: Bangladesh Bank — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works
In RegAlert: added · updated