Rule · BB · 9 Jul 2025

SMEDP-2 Circular Letter No. 01: Regarding the compliance with the guidelines of the master circular issued by SMESPD on March 17, 2025, concerning the refinancing from the revolving fund established under the SMEDP-2 project.

Type
Rule
Effective
On issue, as stated in the document
Captured
6 Aug 2026 from bb.org.bd
Applies to: All regulated firms

Scheduled banks and financial institutions operating in Bangladesh must report newly defined enterprise categories—specifically 'informal/preliminary enterprises' and 'trading/business' within the 'medium' category—in the online verification system when applying for refinancing from the SMEDP-2 revolving fund. Applicants are required to submit a certificate confirming that the relevant customer institution has not received refinancing benefits from any other fund or through another Project Financing Institution (PFI) besides the SMEDP-2 revolving fund. These requirements apply alongside existing instructions from the September 5, 2024, SMEDP-2 Circular No. 1, which remain unchanged.

Regulator's original
BangladeshBangladesh Bank

Lineage: No known changes

RegAlert holds no document that amends or replaces this one. This is not a check that it is in force: confirm with the regulator.

আর্থিক প্রতিষ্ঠান আইন, ১৯৯৩(Financial Institutions Act, 1993)1993 · BD-LAWআর্থিক প্রতিষ্ঠান আইন, ১৯৯৩ (Financial Institutions Act, 1993) (1993-09-30)SMEDP-2 Circular No. 01: RevolvingFund for CMSMEs under Second Smal…2024 · BBSMEDP-2 Circular No. 01: Revolving Fund for CMSMEs under Second Small and Medium Sized Enterprise Development Project (SMEDP-2) (2024-09-05)Bank Companies Act, 1991Not in RegAlertBank Companies Act, 1991 — Not in RegAlertSMESPD Circular No.-1 dated March17, 2025, of the SMENot in RegAlertSMESPD Circular No.-1 dated March 17, 2025, of the SME — Not in RegAlertSMEDP-2 Circular Letter No.01: Regarding the compliance …2025-07-09 · this documentSMEDP-2 Circular Letter No. 01: Regarding the compliance with the guidelines of the master circular issued by SMESPD on March 17, 2025, concerning the refinancing from the revolving fund established under the SMEDP-2 project. (2025-07-09)
amendssupersedesissued underrefers todashed card: not in RegAlert (or proposed)arrows run from the older text to the one that changes it
The links and the sentences they come from (4)
Issued under

More like this from BB

We email you every new BB publication the day it's published.

Source: Bangladesh Bank — original document · Summary generated with machine assistance and checked by an AI reviewer before publication; the authoritative text is the regulator's original document. How RegAlert works

In RegAlert: added · updated