Rule · CBTT · 12 Sep 2017 · 29564
The Central Bank of Trinidad and Tobago requires all financial institutions licensed under the Financial Institutions Act, 2008, to review, revise, and re-submit their Basel II implementation project plans by January 31, 2016. These revised plans must be board-approved, identify a Senior Manager as project champion, and detail specific steps for data collection, IT architectural design, data mapping, and validation, along with resource requirements and timelines. The "Go Live" reporting date for Basel II is extended from January 2017 to July 2017, with institutions failing to meet this new deadline potentially facing higher capital charges.
CENTRAL BANK OF TRINIDAD & TOBAGO
Eric Williams Plaza, Independence Square, Port-of-Spain, Trinidad, Trinidad and Tobago Postal Address: P.O. Box 1250 Telephone: (868) 625-4835; 4921; 5028; Fax: (868) 627-4696 E-Mail Address: info@central-bank.org.tt Website: www.central-bank.org.tt
December 10, 2015
CIRCULAR LETTER TO ALL FINANCIAL INSTITUTIONS
LICENSED UNDER THE FINANCIAL INSTITUTIONS ACT, 2008
REF: CB-OIFI-2867/2015
BASEL II IMPLEMENTATION PROJECT
The Central Bank of Trinidad and Tobago (‘Central Bank/Bank’) issued a Draft Capital Adequacy Reporting Template (‘Template’) together with Guidance Notes for the Completion of the Capital Adequacy Return on September 30 2015, and requested that institutions submit project plans outlining how they intended to implement the requirements.
The Bank conducted desk reviews of the submissions received from institutions and is deeply concerned that project plans were very ‘high level’ and did not demonstrate a comprehensive understanding of the undertaking required to implement Basel II. For example, project plans generally failed to document the key actions necessary for the implementation of the reporting requirements.
As a consequence, the Central Bank met with several institutions and the Technical Working Group during the period November 30 to December 3, 2015 to (a) ascertain institutions had more detailed action plans; and (b) provide feedback on the key actions needed for proper implementation of Basel II capital requirements. These meetings confirmed that institutions are not making adequate preparations to meet the milestones of the Basel II project.
We advise that successful and timely implementation of Basel II requirements is critical and therefore it is essential that institutions commit sufficient and appropriate resources to the project. In view of the foregoing, the Central Bank requests institutions to review, revise and re-submit all project plans by January 31, 2016. Revised project plans must be approved by the board of directors and institutions must clearly identify the Senior Manager who will champion the project.
To assist with the revision of project plans, the Central Bank has presented the details of the required steps in Appendix 1 which include the following:-
i. Data Collection and Classification;
ii. Information Technology Architectural Design;
iii. Data Mapping; and
iv. Validation (Institutions are encouraged to use the Template and validation rules provided to assist in this area).
Project plans must also clearly stipulate the resource requirements. Therefore the information technology, people and other requirements needed to implement the Template and transition seamlessly from manual to automated reporting must be determined and specified. Any foreseen challenges to implementation and steps that are to be adopted to address them, as well as specific timelines must be clearly documented on project plans.
Given the foregoing, the Central Bank will extend the “Go Live” reporting date to July 2017 compared to the previous timeline of January 2017. However, institutions are strongly urged to carefully revisit their plans and ensure that sufficient resources are allocated to the project in order to achieve compliance with the revised deadline. We advise that institutions that do not meet the new timeframe may be subject to higher capital charges.
*
2
Queries and comments on this Circular or other Basel documents may be submitted by electronic mail to Baselconsultation@central-bank.org.tt.
The Central Bank reiterates the importance of this project and the need for the institutions’ board and senior management to be fully engaged in this initiative.
Yours sincerely
[Signature]
Carl Hiralal
INSPECTOR OF FINANCIAL INSTITUTIONS
*
3
APPENDIX I
BASEL II/III IMPLEMENTATION PROJECT – 5 KEY STEPS TOWARDS IMPLEMENTATION
FIVE (5) STEPS IMPLEMENTATION
There are five (5) key steps that institutions are required to conduct in preparing for the completion of the revised Cap Ad returns. The steps are summarized below:
1. DATA COLLECTION AND CLASSIFICATION
A. Identify the data
Find the data needed for the reporting from internal and external source systems. This may be achieved by using the policy proposal document and the instructions to the completion of the capital adequacy report template (‘Template’) bearing in mind that the data may be sourced from the ledger system or any other source (for example an excel file).
B. Gap analysis
Identify the missing data in the source system for reporting purposes.
C. Data quality analysis
Identify the data that does not have the quality required for reporting purposes. For example, the value of the collateral for residential mortgages should be revised on an annual basis.
D. Classify the data by Basel asset class (as outlined in the Policy Proposal Document and Instructions for the Completion of the Capital Adequacy Return). A Basel asset class should be assigned to all the wholesale and retail credit exposures. For example:
a. in the case of wholesale exposures, classification by the nature of the counterparty, if it is sovereign, bank or corporate, the institution could use the SIC code (industry sector). b. in the case of retail classification according to the 4 criteria outlined in the guidance notes.
E. Documentation
Document the data to be used from the source system and the Basel asset class classification. For example, the institution should document:- a. All the addresses/names of the respective data components needed from the source system to be inputted on the Template. b. The criteria used to assign a Basel asset class for all the exposures required for reporting purposes.
2. INFORMATION TECHNOLOGY ARCHITECTURAL DESIGN
Decision and documentation of the IT solution by the bank (manual, semi-automated or fully automated):
a. Document the solution used to address missing data; b. Develop/ document inbuilt IT controls for each step of the process to ensure a high level of data integrity.
Controls - used to ensure the quality of the data as it passes from one source system to another, for example controls should be implemented for total amounts or the total number of lines of information required.
c. To obtain a high level of data integrity regardless of the option chosen the data process must incorporate business materiality thresholds, including monetary and numerical thresholds.
Thresholds - the level of tolerance regarding flawed data should be benchmarked with the materiality of the bank portfolio. In the case of data that is flawed, the system should reject it and the institution should make efforts to make corrections.
*
4
(The diagram in Appendix II is a suggested system that is provided for illustration purposes only and is not intended to dictate the IT design of the respective institutions). d. Consideration should be given to ensuring the IT solution has significant data storage capacity to ensure that the report could be replicated (requiring historical data, historical business rules and historical report results).
3. MAPPING
Ensure that all exposures are placed in the correct schedule in the reporting template by mapping the data to conform to the Basel II classification criteria (as outlined in the Policy proposal document/instructions) with the data point in the report.
For example, a drawn amount for a sovereign loan exposure that is AAA+ rated is assigned to the 20% bucket on the Sovereign schedule and should be reported in the drawn portion of the report (i.e. Schedule 5). In this case, the data point of the cell is S05.DP0002 (See example below).
Schedule 5 - Standardized Approach –
credit risk-weighted assets
| Return to Schedule Listing |
|---|
| For Banking Book - Sovereign |
| (TT$ 000) |
| Before CRM | |||
|---|---|---|---|
| Risk weight | Notional Principal Amount | Gross exposure (credit-equiv. amount for off B/S)* | Net exposure (credit-equiv. amount for off B/S)* |
| (a) | (b) | ||
| Drawn | |||
| 0% | S05.DP0001 | S05.DP0007 | |
| 20% | S05.DP0002 | S05.DP0008 |
There should be clear documentation of the specific data in the source systems and from external systems that are to be mapped to specific data points in the reporting template.
4. VALIDATION
Validation would be initiated after the completion of all relevant data points on the reporting template. Validation rules (provided by the Central Bank) should therefore be built in to allow for in-schedule and cross schedule validation of the report.
5. GENERATION OF THE REPORT FOR SUBMISSION TO THE CENTRAL BANK
The file should be converted to a flat file to facilitate submission to the Central Bank.
*
5
APPENDIX II
CBTT Regulatory Filing System
Filing Institution High Level Suggested Data Flow
[Flowchart Description]
Scope of Basel 2 implementation
(*) Reference Data from Regulator and/or BIS (e.g. Risk weights, add-on factors ...)
Created by: Alain Ayotte
Last updated: 2015-12-05
Note from RegAlert. AI assistants can read this document in full, and search 70,000+ more, through the RegAlert MCP connector (https://mcp.regalert.today/mcp). Free with an account. How to connect ChatGPT, Claude or Cursor.
More like this from CBTT
CBTT published 1 document in the last 30 days. We email you each new one the day it's published.
Source: Central Bank of Trinidad and Tobago — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works
In RegAlert: added · updated