Rule · CVM · 28 Sep 2001

CVM/SNC Circular Letter 03/01: External Quality Control Program

All independent auditors registered with the CVM as individuals or legal entities, excluding those listed in Circular Letters CVM/01/01 and 02/01, must undergo their first external quality review by October 31, 2002. The reviewing auditor must submit a copy of the quality control review report to the CVM by October 31 of the year the review is conducted. Failure to meet these deadlines results in a penalty fine under CVM Instruction No. 273/98.

BrazilComissão de Valores Mobiliários
Annotations and obligations
7 obligations · 1 definition
  • Obligation 7
  • Definition / condition 1
  • background, boilerplate

Lineage: In force

CVM Instruction No. 308 of May …1999CVM Instruction No. 308 of May 14, 1999 (Revoked) (1999-05-14)CVM Instruction No. 273 of Marc…1998CVM Instruction No. 273 of March 12, 1998 (1998-03-12)CVM/SNC Circular Letter 03/01:External Quality Control Prog…2001-09-28 · this documentCVM/SNC Circular Letter 03/01: External Quality Control Program (2001-09-28)
amendssupersedesissued underrefers toproposed or not in RegAlertarrows run from the older text to the one that changes it

More like this from CVM

CVM published 2 documents in the last 30 days. We email you each new one the day it's published.

Source: Comissão de Valores Mobiliários — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works

In RegAlert: added · updated