Rule · EBA · 19 Dec 2014
This regulation specifies the content of resolution plans and the criteria for assessing the resolvability of institutions and groups under Directive 2014/59/EU. Resolution plans must contain eight categories of information, including a summary, resolution strategy, information arrangements, operational continuity, financing, communication, resolvability conclusions, and responses from the institution. The assessment of resolvability requires a staged approach where authorities first evaluate the feasibility and credibility of liquidation under normal insolvency procedures before identifying a preferred resolution strategy. If liquidation is not feasible, authorities must assess the strategy's feasibility and credibility based on criteria related to structure, financial resources, information, cross-border issues, and legal matters.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY EBA/RTS/2014/15 19 December 2014 EBA FINAL Draft Regulatory Technical Standards on the content of resolution plans and the assessment of resolvability
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY Contents
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
2. Background and rationale
Bank resolution can be a complex process. Resolution authorities are therefore more likely to be successful in achieving their objectives during a resolution if they have carried out a robust resolution planning process in advance. The planning process should include a rigorous assessment of the resolution plans which are developed and whether, given those plans, the bank is resolvable in a manner which meets the resolution objectives. Furthermore, where more than one resolution authority would play a role in a resolution, resolution planning also enables them to agree in advance mechanisms for cooperation and coordination that would be difficult to establish under the pressure of time in a crisis. The Financial Stability Board (FSB) has established standards for resolution planning for Globally Systemically Important Banks, and a process for resolvability assessment of these banks is underway. These complement more broadly applicable national standards which have been introduced by reforms to national bank resolution laws. Harmonised requirements for resolution authorities to draw up or update resolution plans and assess the resolvability of institutions and groups on at least an annual basis within the European Union have been introduced by the Bank Recovery and Resolution Directive (BRRD). These requirements are an essential precondition for the effective repair of the single market in financial services, and require further specification in order to serve as a useful tool for resolution authorities. The EBA is mandated in Articles 10 and 12 of the BRRD to produce regulatory technical standards specifying the content of resolution plans, and in Article 15 of the BRRD to produce regulatory technical standards which specify matters and criteria for the assessment of resolvability of institutions or groups. In approaching these mandates the EBA has considered the experience of resolution authorities to date in assessing the resolvability of institutions on the basis of both national frameworks and as part of FSB-led exercises. That experience indicates that the resolvability of an institution can only coherently be assessed on the basis of a clearly identified resolution strategy. A staged process in which the resolution strategy is identified first and then its feasibility and credibility is assessed in greater detail on the basis of supplementary information requests also helps to ensure the proportionality of demands on the resources of both the institution or group being assessed and the resolution authority. For these reasons the EBA is also proposing that the Regulatory Technical Standards provide for harmonisation of the process for the assessment of resolvability. Experience also suggests that discussions between more than one resolution authority for the purpose of identifying the resolution strategy to be applied to a group are more productive if carried out on the basis of common terminology and criteria for the characterisation of
broad types of resolution strategy. The FSB has issued guidance on the identification of resolution
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY strategies as either single-point-of entry or multiple-point-of-entry for globally systemically important banks, which have been influential in promoting a more concrete debate on the appropriate resolution strategy for particular institutions. The draft RTS proposes that for groups resolution authorities should where possible follow this classification.
2.1 Contents of resolution plans
Article 10 (paragraphs 4 & 7) of the BRRD establishes requirements for the contents of resolution
plans of institutions, and Article 12 (paragraph 3) expands these requirements to groups. These requirements are compatible with the breakdown of the contents of resolution strategies and operational resolution plans suggested by the Financial Stability Board1 . The approach adopted by these draft technical standards is therefore to provide a categorisation of the content of a resolution plan which is consistent with both the BRRD and the FSB approach. Within each category, a general requirement is proposed for resolution authorities to include any information which is necessary to enable the delivery of their chosen resolution strategy. Specific content which should be included in each category in all cases is listed, but this is not intended to be an exhaustive list or to prevent resolution authorities from adding additional information which is relevant to particular institutions or groups. The principle of proportionality is respected in two distinct ways: first, the amount of information required from less complex institutions or groups in each category will inherently be lower; and second, member states may opt to apply simplified obligations under Article 4 of the BRRD to certain categories of institutions. The categories of information required are:
a) A summary of the resolution plan including a description of the institution or group. The key elements and judgements in the plan should be capable of being expressed in a concise way to facilitate discussion about these issues. b) A description of the resolution strategy considered in the plan, including arrangements for decision-making and information sharing necessary to the execution of the strategy. Resolution authorities should clearly identify a single preferred resolution strategy, but may also need to include here variant strategies to be applied in circumstances in which implementation of the preferred strategy is not feasible. c) Arrangements for ensuring information required to execute the strategy and undertake preparatory steps such as valuation is available. See FSB document: “Recovery and Resolution planning: making the key attributes operational” http://www.financialstabilityboard.org/publications/r_121102.pdf
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY d) Arrangements to ensure operational continuity during resolution. e) Financing arrangements for resolution. This should consider the needs for financing during resolution and identify the sources of finance which are available to meet those needs, including private sources of finance, access to central bank facilities (respecting the requirement of the BRRD that resolution plans should not assume any access to central bank facilities on non-standard terms), and use of resolution financing arrangements f) Plans for communication with critical stakeholder groups g) Conclusions of the assessment of resolvability. This should include a quantified assessment of any changes needed to the minimum requirement for eligible liabilities to ensure resolvability. h) Responses from the institution or group itself. The table below shows how these categories map to the requirements of the directive and the categories of information identified by the FSB. RTS BRRD provisions FSB categories (RS: part of the Resolution Strategy; ORP: part of the operational resolution plan a) Summary Art 10.7 (a), (b) RS b) Resolution strategy Art 10.7 (c), (d), (j); Art 12.3 (a), (b), (c) RS; ORP processes, powers, critical functions, conditions for activation, scope c) Information Art 10.7 (g), (h) ORP Information requirements d) Continuity Art 10.7 (k), (l), (q); ORP payments, moratoria, maintenance of contracts e) Financing Art 10.4, 10.7 (i); Art 12.3 (f) ORP sources of funding f) Communication Art 10.7 (m), (n); ORP Regulatory approvals, advisors, communications g) Resolvability Art 10.7 (e), (f), (o), (p); Art
12.3 (d), (e)
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY h) Response Art 10.7 (r)
2.2 Assessment of resolvability
The resolvability assessment process required by the BRRD serves three purposes. First, it provides assurance of the quality of resolution plans and strategies, and ensures that resolution authorities assess whether their strategies are feasible and credible. Second, the requirement for assessments at least annually informs the development and updating of the resolution strategy. And third, the assessment identifies impediments to the implementation of resolution strategies which should be addressed through the procedure provided in Article 14 of the BRRD. Under the BRRD resolution actions should only be taken if resolution is necessary in the public interest. If it is not, resolution tools are not available and the institution should be considered resolvable through liquidation in accordance with normal insolvency procedures. The draft RTS therefore proposes that resolution authorities should begin the resolvability assessment by evaluating whether the liquidation of the institution or group is feasible and credible in a manner which is consistent with the public interest. This evaluation may be conducted on the basis of general criteria to ensure proportionality in the case of institutions or groups for which liquidation is clearly not feasible or credible.
Article 4 of the draft RTS proposes criteria on the basis of which this assessment of feasibility and
credibility should be conducted. As regards feasibility, It proposes that the main pillar of the assessment should be to assess whether it would be feasible for deposit guarantee schemes to fulfill their obligations under Directive 2014/49/EU to ensure the timely repayment of covered deposits. This will require resolution authorities to form a view of whether the systems and operations of the institution or group are capable of providing any necessary support to the operations of the DGS. As regards credibility, the draft RTS proposes that the main pillar of the assessment should be an assessment of the likely systemic impact of a counterfactual liquidation. This assessment should distinguish the impacts on financial market functioning, on financial market infrastructures, on
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY other financial institutions, and on the real economy (in particular through the availability of critical financial services. If liquidation is not feasible or credible, and resolution action would be in the public interest, the draft RTS proposes that resolution authorities should proceed to identify a preferred resolution strategy. The preferred strategy should be appropriate for the structure and business model of the institution or group, and Article 5 of the RTS proposes criteria on the basis of which the appropriateness of a proposed resolution strategy may be assessed. It also proposes, for groups, how those criteria should apply to identifying whether a single point of entry or multiple point of entry resolution strategy is more likely to be appropriate. Resolution authorities may also identify variants of the preferred strategy that would be applied in circumstances in which it is not feasible or credible to implement the strategy. These variant strategies must seek to achieve the same resolution objectives and should be assessed against the same criteria. As a second stage, the draft RTS proposes that resolution authorities should proceed to a detailed assessment to identify impediments the feasibility or credibility of the resolution of the institution or group. The BRRD requires that the assessment of resolvability should take into account the matters specified in Annex C to the Directive. The draft RTS provides a categorization of these matters as pertaining either to the assessment of feasibility or the assessment of credibility. Within the assessment of feasibility they are further broken down into matters related to impediments to one of:
a) structure and operations; b) financial resources ; c) information; d) cross-border issues; e) legal issues The draft RTS requires resolution authorities to conduct a rounded assessment of whether impediments to resolution exist within each of these categories, not limited to the matters specified in Annex C. Within each category particular additional issues are identified which are likely to be applicable to most institutions or groups.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY The RTS also requires resolution authorities to assess whether impediments exist to either the short-term stabilisation of the institution or group in the period immediately following resolution, or to the longer term restructuring of the business which is likely to be required to address the causes of failure. However, the EBA recognizes that the range of possible longer term restructuring actions which may be required in particular cases is extremely broad and the RTS therefore provides less detail in this area. In case of application of the bail-in tool, where a business reorganization plan is explicitly required by the BRRD, further detail will be provided by the Guidelines which the EBA is required to develop under Article 52 of the BRRD.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
3. Draft Regulatory Technical Standards
on the contents of resolution plans and the assessment of resolvability COMMISSION DELEGATED REGULATION (EU) No …/.. of XXX supplementing Directive 2014/59/EU of the European Parliament and of the Council with regard to regulatory technical standards for the content of resolution plans and assessment of resolvability (Text with EEA relevance) THE EUROPEAN COMMISSION, Having regard to the Treaty on the Functioning of the European Union, Having regard to Directive 2014/59/EU of the European Parliament and of the Council establishing a framework for the recovery and resolution of credit institutions and investment firms and amending Council Directives 77/91/EEC and 82/891/EC, Directives 2001/24/EC, 2002/47/EC, 2004/25/EC, 2005/56/EC, 2007/36/EC and 2011/35/EC and Regulation (EU) No 1093/20102 , and in particular Articles [10(9), 12(6), and 15(4)] thereof, Whereas:
(1) Requirements for the content of resolution plans should take account of ongoing work to coordinate these developments at a global level through the Financial Stability Board. (2) Standards for the content of resolution plans and the assessment of resolvability should be sufficiently flexible to take account of the circumstances of the institution or group being considered, to ensure that plans are targeted and useful for the implementation of resolution strategies. 2 OJ L […], […], p. […].
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY (3) Resolution authorities should assess whether liquidation under normal insolvency procedures can credibly and feasibly achieve the resolution objectives. To do this they may need to draw on the expertise in this area of deposit guarantee schemes. (4) Assessment of resolvability is an iterative process and is only possible on the basis of an identified preferred resolution strategy. Resolution authorities may conclude at the end of the process that an amended or wholly different strategy is more appropriate. (5) Variants of the preferred strategy should also be considered to take account of circumstances which prevent implementation of the preferred resolution strategy. For example, a single point of entry strategy using the bail-in tool may no longer be feasible if losses exceed the eligible liabilities issued by the parent entity. (6) In respect of some institutions or groups simplified obligations pursuant to Article 4 of Directive 2014/59/EU may apply, or it may be clear that winding up under normal insolvency proceedings either would or would not be feasible and credible. (7) Standards for group resolution plans and assessment of resolvability should permit a resolution strategy based on either of the stylised approaches outlined by the Financial Stability Board and referred to in recital (80) of Directive 2014/59/EU. Namely, resolution strategies may (a) involve a single resolution authority applying resolution tools at the holding or parent company level of a group (single point of entry), (b) involve more than one resolution authority applying resolution tools in respect of more than one regional or functional sub-group or entity in a crossborder group by more than one resolution authority (multiple point of entry), or (c) may combine aspects of both. (8) In either case resolution planning and assessment should take account of any supporting action required from resolution authorities other than those taking resolution action, for instance through provision of information, continued provision of critical shared services, or decisions to refrain from taking resolution action, taking into account the right of other resolution authorities to act on their own initiative if necessary to achieve domestic financial stability in the absence of effective action by lead resolution authorities. (9) Section C of the Annex to Directive 2014/59/EU specifies a number of matters which must be considered in assessing the resolvability of an institution or group, but is not exhaustive and requires further specification. (10) The provisions in this Regulation are closely linked, since they deal with the development of resolution plans and the assessment of resolvability. In accordance with Articles 10 and 15 of Directive 2014/59/EU resolution plans are required to identify material impediments to resolvability, the assessment of resolvability is required to take place and be
updated at the same time as drawing up or updating the resolution plan, and the conclusions of the assessment should form part of the plan. To ensure coherence between those provisions, which should enter into force at the same time, it is desirable to include certain regulatory technical standards required by that Directive in a single Regulation. (11) Pursuant to Article 32 of Directive 2014/59/EU resolution action may only be taken when winding up of an institution or group under normal insolvency proceedings would not be in the public interest, and therefore the assessment of resolvability should consider such winding up as an alternative to resolution action. (12) This Regulation is based on the draft regulatory technical standards submitted by the European Supervisory Authority (European Banking Authority) (EBA) to the Commission. (13) The EBA has consulted the European Systemic Risk Board and has conducted open public consultations on the draft regulatory technical standards on which this Regulation is based, analysed the potential related costs and benefits, and requested the opinion of the Banking
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY Stakeholder Group established in accordance with Article 37 of Regulation (EU) No 1093/2010 of the European Parliament and of the Council 3 , HAS ADOPTED THIS REGULATION:
Title 1: Subject matter and definitions
Article 1
Subject matter
This regulation specifies the matters and criteria to be examined for the assessment of the resolvability of institutions or groups provided for in Article 15, paragraph 4 and Article 16, paragraph 2 of the Directive 2014/59/EU and the contents of resolution plans required for institutions that are not part of a group subject to consolidated supervision pursuant to Articles 111 and 112 od Directive 2013/36/EU4 and groups under Articles 10 and 13 of Directive 2014/59/EU [BRRD] . Simplified obligations may be applied for certain institutions if the conditions of Article 4 of Directive 2014/59/EU are met.
Article 2
Definitions
For the purpose of this Regulation, the following definitions apply:
a) ‘resolution strategy’ means a set of resolution actions provided for in a resolution plan or group resolution plan; b) ‘preferred resolution strategy’ a resolution strategy capable of best achieving the resolution objectives set out in Article 31 of Directive 2014/59/EU given the structure and the business model of the institution or group, and the resolution regimes applicable to legal entities in a group. c) ‘qualifying eligible liabilities’ means eligible liabilities which satisfy the conditions set forth in Article 45(4) of Directive 2014/59/EU in order to be included in the amount of own funds and eligible liabilities referred to in Article 45(1). 3 Regulation (EU) No 1093/2010 of the European Parliament and of the Council of 24 November 2010 establishing a European Supervisory Authority (European Banking Authority), amending Decision No 716/2009/EC and repealing Commission Decision 2009/78/EC (OJ L 331, 15.12.2010, p. 12). 4 Directive 2013/36/EU of the European Parliament and Council of 26 June 2013 on access to the activity of credit institutions and the prudential supervision of credit institutions and investment firms, amending Directive 2002/87/EC and repealing Directives 2006/48/EC and 2006/49/EC (OJ L 176, 27.06.2013, p338).
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY d) ‘single point of entry (SPE)’ means a resolution strategy involving the application of resolution powers by a single resolution authority at the level of a single parent undertaking or of a single institution subject to consolidated supervision. e) ‘multiple point of entry (MPE)’ means a resolution strategy involving the application of resolution powers by two or more resolution authorities to regional or functional subgroups or entities of a group. Title 2: Content of resolution plans
Article 3
Categories of information to be included in resolution plans A resolution plan shall contain at least the elements laid down in letters (a) to (h) of this Article, including all information required under Articles 10 and 12 of Directive 2014/59/EU and any additional information necessary to enable the delivery of the resolution strategy:
a) A summary of the plan, including a description of the institution or group and a summary of items specified in letters (b) to (h) under this Article; b) A description of the resolution strategy considered in the plan, including:
i. Identification of the different resolution actions foreseen under the plan;
ii. Identification of the legal entity or entities to which resolution actions would be
applied;
iii. Identification of any critical functions or core business lines which will be
maintained and any which are expected to be separated from other functions;
iv. An estimation of the timeframe for executing each material aspect of the plan, as
required pursuant to Article 10 (7) letter (d) of Directive 2014/59/EU;
v. A detailed description of any variants of the preferred resolution strategy
considered to address circumstances in which the preferred strategy cannot be implemented;
vi. A description of the decision-making process for implementing the resolution
strategy, including the timeframe required for decisions;
vii. For group resolution plans, arrangements for cooperation and coordination
between resolution and other relevant authorities of Member States in which group entities are located or have significant branches and relevant authorities of third countries in which group entities are located, in lines with the written arrangements and procedure as set out in any Regulatory Technical Standards on the operational functioning of resolution colleges pursuant to Article 88(7) of Directive 2014/59/EU; c) A description of the information, and the arrangements for the provision of this information, necessary in order to effectively implement the resolution strategy, including at least:
i. A description of the information, and processes for ensuring availability in an
appropriate timescale of that information required for the purposes of valuation, in particular pursuant to Articles 36 and 49 of Directive 2014/59/EU, and
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY marketability, in particular pursuant to the marketing requirements for the sale of business and bridge bank tools.
ii. A mapping of critical functions and core business lines to legal entities which
identifies in particular a) the critical functions and core business lines carried out by entities subject to resolution actions and b) the critical functions or core business lines spread across legal entities which would be separated by implementation of the resolution strategy;
iii. A description of the arrangements for the sharing of information between
resolution authorities and other relevant authorities, including where relevant authorities in other Member States or in third countries, in accordance with Article 90 of Directive 2014/59/EU;
iv. A detailed description of arrangements for ensuring that information pursuant to
Article 11 of Directive 2014/59/EU is up to date and available to resolution
authorities when required; d) A description of arrangements to ensure operational continuity of access to critical functions during resolution, including at least:
i. A description of critical shared systems and operations which need to be continued
to maintain continuity of critical functions and arrangements for ensuring the contractual and operational robustness of their provision in resolution;
ii. A description of internal and external interdependencies which are critical to the
maintenance of operational continuity;
iii. A description of arrangements for ensuring any access to payment systems or other
financial infrastructures necessary to maintain critical functions, including an assessment of the portability of client positions; e) A description of the financing requirements and financing sources necessary for the implementation of the resolution strategy foreseen in the plan, including at least:
i. A description of financing, funding and liquidity requirements implied by the
resolution strategy;
ii. A description of potential sources of resolution funding, including the terms of
financing, preconditions for their use, the timing of their availability, the entities to which they may provide financing, and any collateral requirements;
iii. Where relevant, a description and analysis of how and when an institution or group
may apply, in the conditions addressed by the resolution plan, for the use of central bank facilities (other than emergency liquidity assistance or other assistance on non-standard terms) in resolution, including identification of available collateral;
iv. For groups, a description of any principles agreed for sharing responsibility for
financing between sources of funding in different jurisdictions, including between sources of funding in different member states pursuant to Article 12(3) (f) of Directive 2014/59/EU; f) Plans for communication with critical stakeholder groups, including at least with:
i. the management, owners ,and staff of the institution or group including procedures
for consultation with staff and, where applicable, dialogue with social partners in the resolution process, and an assessment of the impact of the plan on employees;
ii. customers, media and the general public;
iii. depositors, shareholders, bondholders, counterparties, financial market
infrastructures, and other affected market participants;
iv. any administrative or judicial bodies from whom approval or authorisation critical
to implementing the resolution strategy is required; a. any advisors required to implement the resolution strategy;
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY g) The conclusions of the assessment of resolvability, including at least:
i. Whether or not the institution or group is currently resolvable;
ii. A summary of the conclusions of the liquidation assessment required under Article
4(1) letter (a)
iii. A detailed description of any impediments to resolvability identified, and of any
measures proposed by the institution or group or required by the resolution authority to address or remove those impediments;
iv. A quantified assessment of any change to minimum requirements for eligible
liabilities, or the appropriate location of eligible liabilities, that is required to remove or address impediments to resolvability, taking into account the criteria specified in Article 45 (6) of Directive 2014/59/EU and further specified in the EBA Regulatory Technical Standards mandated in Article 45 (2) of Directive 2014/59/EU; h) Any opinion expressed by the institution or group in relation to the resolution plan. Title 3: Assessment of resolvability
Article 4
Stages of assessment
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY by the institution or group pursuant to Article 11 of Directive 2014/59/EU and the criteria set out in this Regulation. To the extent necessary, they shall also identify variant strategies to address circumstances in which the strategy would not be feasible or credible.
4. The assessments of the feasibility and credibility of the preferred resolution strategy referred
to in paragraph 3 shall include assessment of any variant strategies proposed as part of that strategy. Resolution authorities shall request from the institution or group in accordance with
Article 11 of Directive 2014/59/EU such additional information as is necessary to carry out
those assessments of the preferred and variant strategies.
5. Where appropriate, a resolution authority shall revise the preferred resolution strategy or
consider alternative strategies on the basis of a completed assessment of feasibility and of the credibility of a preferred resolution strategy referred to in paragraph 4.
6. Where a resolution authority revises the preferred resolution strategy it shall assess the
feasibility and the credibility of that revised preferred resolution strategy in accordance with Articles 7 and 8 respectively.
Article 5
Feasibility and credibility of liquidation under normal insolvency proceedings
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
3. If the resolution authority concludes that liquidation is credible, it shall assess the feasibility of
liquidation. For this purpose resolution authorities shall consider whether the institution’s or group’s systems are able to provide the information required by the relevant deposit guarantee schemes for the purposes of providing payment to covered deposits in the amounts and timeframes specified in Directive 2014/49/EU 5 , or where relevant in accordance with equivalent third country deposit guarantee schemes, including on covered deposit balances. Resolution authorities shall also assess whether the institution or entity has the capability required to support the deposit guarantee schemes’ operations, in particular by distinguishing between covered and non-covered balances on deposit accounts.
Article 6
Identification of a resolution strategy
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY one entity or regional or functional sub-group in the group which would be resolved. c) The contractual or other arrangements in place for losses to be transferred between legal entities in a group. d) The operational structure and business model of the institution or group, and in particular whether it is highly integrated or has a decentralised structure with a high degree of separation between different parts of the institution or group, taking into account that:
i. Single point of entry is more likely to be appropriate if a group operates in a
highly integrated manner, including by having centralised liquidity management, risk management, treasury functions, or IT and other critical shared services.
ii. Multiple point of entry is more likely to be appropriate if a group’s operations
are divided into two or more clearly identifiable subgroups, each of which is to a significant extent independent (financially, legally or operationally) from other parts of the group, and any critical operational dependencies on other parts of the group are based on robust arrangements that ensure their continued operation in the event of resolution. e) The enforceability of resolution tools which would be applied, in particular in third countries. f) Whether the resolution strategy requires supporting action by other authorities, in particular in third countries, or requires such authorities to refrain from independent resolution actions; and whether any such actions are feasible and credible for those authorities.
4. Resolution authorities shall also assess whether variants of the resolution strategy are
necessary to address scenarios or circumstances where the resolution strategy cannot be feasibly and credibly implemented. Resolution authorities shall consider the extent to which any variant strategy is likely to achieve the resolution objectives and in particular ensure the continuity of critical functions. Measures to remove impediments to variants of the resolution strategy shall only be implemented if they do not impair the feasible and credible implementation of the preferred resolution strategy.
Article 7
Assessment of feasibility of a resolution strategy
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
3. Impediments shall be identified in at least the following categories:
a) structure and operations; b) financial resources; c) information; d) cross-border issues; e) legal issues
Article 8
Assessment of feasibility: structure and operations
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
v. other factors creating risk that the liabilities would be exempted from
absorbing losses in resolution. c) The amount and issuing legal entities of qualifying eligible liabilities or other liabilities which would absorb losses d) The size of funding needs in the run-up to and during resolution, the availability of sources of funding, and impediments to the transfer of funds as required within the institution or group. e) Whether appropriate arrangements are specified for losses to be transferred to legal entities to which resolution tools would be applied from other group companies, including where relevant an assessment of the amount and loss-absorbency of intragroup funding.
Article 10
Assessment of feasibility: information
3. Resolution authorities shall consider at least the following issues in assessing whether there
are potential impediments to resolution related to information:
a) Matters addressed in clauses 8 to 12 of Section C of the Annex to Directive 2014/59/EU b) The capability of the institution or group to provide information on the amount and location within the group assets which would be expected to qualify as collateral for central bank facilities; c) The capability of the institution or group to provide information to carry out a valuation to determine the amount of write-down or recapitalisation required.
Article 11
Assessment of feasibility: cross-border issues
4. Resolution authorities shall consider at least the following issues in assessing whether there
are potential impediments to resolution related to cross-border issues:
a) Matters addressed in clauses 20 of Section C of the Annex to Directive 2014/59/EU b) Existence of adequate processes for coordination and communication and assurances on actions to be taken between home and host authorities, including in third countries, to enable delivery of the resolution strategy. c) Whether law in relevant home and host jurisdictions overrides contractual termination rights in financial contracts that are triggered solely by the failure and resolution of an affiliated company.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
Article 12
Assessment of feasibility: other
5. The following issues shall be considered in assessing whether there are potential
impediments to resolution related to legal issues not already mentioned in other categories:
a) Whether requirements for regulatory approvals or authorisations necessary to deliver the resolution strategy can be met in a timely manner. b) Whether significant contractual documentation permits termination of contracts on entry into resolution. c) Whether contractual obligations which cannot be disapplied by the resolution authority prohibit any transfer of assets and/or liabilities envisaged in the resolution strategy.
Article 13
Assessment of credibility of a resolution strategy
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
4. Accompanying documents
4.1 Cost- Benefit Analysis / Impact Assessment
4.1.1 Introduction
Article 10-12 of the BRRD requires the EBA to develop draft Regulatory Technical Standards (RTS)
that specify the content of the resolution plans and Article 15 of the BRRD requires the EBA to develop RTS that specify matters and criteria for the assessment of resolvability of institutions or groups. As per Article 10(1) of the EBA regulation (Regulation (EU) No 1093/2010 of the European Parliament and of the Council), any draft regulatory technical standards developed by the EBA – when submitted to the EU Commission for adoption - shall be accompanied by an Impact Assessment (IA) annex which analyses ‘the potential related costs and benefits’. Such annex shall provide the reader with an overview of the findings as regards the problem identification, the options identified to remove the problem and their potential impacts. This annex presents the impact assessment with cost-benefit analysis of the provisions included in the RTS. Given the nature of the study, the IA is high level and mostly qualitative.
4.1.2 Problem definition
Resolution authorities are required to produce plans for resolving credit institutions and investment firms on information provided by these institutions and firms. The core problem that the RTS aim to address is asymmetric information between authorities (both national competent authorities (NCAs) and resolution authorities) in different EU Member States (MS) and the moral hazard associated with the prospect of future bail-outs for systemically important financial institutions. The lack of common standards for the preparation of resolution plans and the assessment of resolvability reduces the capacity of national competent authorities and resolution authorities to react in a timely manner when confronted with resolution. This is true particularly in the EU banking framework with large cross-border elements. High level of coordination between authorities and among jurisdictions is crucial for effective and efficient regulatory intervention. A common set of information is a first step to devise a coordinated strategy.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY A divergence of practices at the EU level could create uncertainty about the capacity of resolution authorities to detect barriers and define actions to remove impediments to the resolution of institutions under their own or joint responsibilities. Differences in implementation may also result in an uneven level playing field. Precisely, similar institutions could be assessed differently and thus required to carry out different actions with different associated costs. In particular, institutions located in different jurisdictions that may generate similar externalities in case of a disorderly failure can be subject to different requirements if the information that is available to the relevant authorities is not consistent among jurisdictions. The lack of harmonised rules may also give rise to difficulties in addressing resolution in cross border groups as no common terminology and criteria are in place.
4.1.3 Objectives
The current RTS aim to promote among national authorities the use of similar criteria and methods to assess the resolvability of institutions and of a similar content for the resolution plan. It will also help institutions and groups identify and prepare the evidence for such an assessment in a timely manner. In the case of cross border groups, the harmonisation of practices will facilitate the assessment by the resolution colleges.
4.1.4 Baseline scenario
The IA aims to capture the incremental change from the baseline, i.e. from the current situation to the situation that will arise if the proposal is implemented. Currently, EU MS do not have in place banking sector specific resolution mechanism that requires the development of resolution plans and the assessment of resolvability. The exceptions are Denmark, Germany, Sweden and the UK. European Commission’s (EC) IA for the BRRD6 states that only these Member States operate special resolution systems. The baseline scenario for the IA will be different for the EU MS depending on whether a jurisdiction has regulation requiring resolution plans and resolvability assessment or has not developed any such requirements. For the first group of countries the baseline is defined by the 6 SWD(2012) 166 final (6.6.2012)
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY existence of these plans. The impact will depend on the incremental requirements implied by the RTS, including:
institutional coverage for which a resolution plan needs to be drawn, content of such resolution plan, and process and criteria for the assessment of resolvability. If the content of the RTS does not imply any change on a particular jurisdiction then the impact of the policy intervention on that particular jurisdiction is expected to be zero. The focus of the IA will therefore be those jurisdictions that have not started the development of such plans. As far as possible, the impact on both the resolution authorities and financial institutions will be assessed. The scope of the RTS and guidance is on the contents of resolution plans, and criteria and procedure for the assessment of resolvability. Therefore, the analysis below discusses the impact associated with the production of resolution plans and assessment framework. It does not cover any changes in business operations, business structure or any other effects derived from the conclusions of plans, i.e. plans may require taking action to improve a firm’s resolvability or the likely increase in the cost of funding to firms as a result of the changed market expectations of future taxpayer support. Such indirect costs had already been considered under BRRD. Moreover, it will be difficult to disentangle the contribution to costs and benefits of resolution planning from those stemming from other legislative initiatives such as the proposal on structural reform of EU banks, the revision of the large exposures regime or the new liquidity requirements that may impact the resolvability of a firm.
4.1.5 Assessment of the technical options
Resolution plans aim at a rapid, efficient and effective execution of potential measures that can substantially decrease the social cost of bank failure. If resolution authorities are fully aware of the options they have to resolve a failing bank or group, the likelihood of a successful resolution is substantially higher. Resolution plans are regarded as contingency plans devised to mitigate potential impacts of exceptional risk of disorderly failures. The current section analyses major technical options that are considered under the RTS.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
4.1.6 Options related to the content of resolution plans
Different options were considered as far as the contents of the resolution plan:
a. Level of detail in the definition of content of resolution plans.
Option 1: detailed approach.
Option 2: categorised approach.
A detailed approach (Option 1) would aim at making all the provisions contained in resolution plans identical or very similar. It would facilitate the production and the comparison of the plans across Member States.. However, financial institutions and their complex structure vary. A set of elements may be relevant for one institution but not for another, so the homogeneity in the presentation of the plan is not necessarily an asset. In fact, Financial Stability Board (FSB) guidance on the contents of operational resolution plans focuses primarily on resolution strategies for global systemically important financial institutions (G-SIIs), while the scope of the current RTS is broader, so that there is a need to account for the heterogeneity of the institutions within and across Member States. The resolution plan that the current RTS propose include provisions related to the resolution strategy, the information, operational and financial arrangements, and the communication with critical stakeholders groups. These are the aspects that are also covered in the FBS guidance document. In addition to these elements, the current RTS also cover a quantified assessment of any changes to minimum requirements for eligible liabilities required to address resolvability and the views expressed by the firm. The additional items are believed to increase the credibility of the resolution plan. The terms of the discussion with the institution whose resolution plan has been defined reinforces the authorities’ commitment and provide a better understanding of the issues that may arise in resolution from the way a firm organises its operations. The need to harmonise the contents of resolution plans so as to ensure a consistent and effective approach to resolvability in EU MS needs to be aligned with Article 4 of the BRRD. Article 4 of the BRRD states the possibility of simplified obligations for certain institutions, in particular, as regards the contents and detail of recovery and resolution plans. A categorisation of the content of the plan (Option 2) has the advantage that it can accommodate any needs arising from the different characteristics of financial sectors and institutions in EU MS, ensuring that the principle of proportionality is respected. Specifically, it allows for the demand on resources for the
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY production of such plan to be proportionate to the size, complexity and systemic nature of financial firms. Such flexibility has the drawback that institutions in different jurisdictions may have to provide different detailed specific information to facilitate resolution planning. Moreover, it does not provide any guidance to institutions as regards the specific format and information that they will be required to provide to national resolution authorities, thus slowing down the production of such plans. The proportionality principle has supported the choice of a categorised approach (Option 2) as it can accommodate the different needs arising from different firm complexities and structures, while providing a common background.
4.1.7 Options related to the matters and criteria for the assessment of resolvability
of institutions or groups
Several options have been considered in relation to the assessment of resolvability. a. Content of assessment of resolvability Option 1: exclusively develop the matters specified in Annex C of BRRD. Option 2: categorisation of matters specified in Annex C of BBRD in relation to feasibility and credibility. The first question in relation to the criteria to assess resolvability has been whether to limit the contents of the assessment to developing in detail the matters specified in Section C of the Annex (Option 1). A detailed specification would not necessarily ensure homogeneity in the content of the assessment as for that to happen, all contingencies would need to be covered. The progress made in the FSB in defining some of the relevant areas has suggested the need to expand beyond this initial setting. A categorisation (Option 2) in terms of the impediments to structure and operations, financial resources, information, cross-border issues and legal issues should provide a solid basis on which to build the assessment and should enable the assessment of impediments to resolution in a more consistent way, thus easing their removal. As a result, option 2 is the preferred option. b. Process of assessment of resolvability Option 1: No process is suggested.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY Option 2: Guidance on process is proposed. The option of doing nothing as regards the process to carry out the resolution plan was considered (Option 1).The BRRD does not specify a process that needs to be followed when assessing resolvability. However, it establishes that resolution should be carried out only when winding down of an institution or group under normal insolvency proceedings would not be in the public interest. Level 1 text seems to be setting a certain order in which the resolvability assessment needs to be carried out. Without being prescriptive, proposing a sequence for the resolvability assessment can provide a first step of a common framework through which the assessment process is taken place. In particular, guidance formulated within the current RTS (Option 2) proposes that the stages include:
assessing the feasibility and credibility of liquidation, the selection of the preferred resolution strategy and variants, the assessment of the feasibility of the assessment, and the assessment of the credibility of the selected strategy. The choice of guidance should assist authorities in the process and would result in a more homogeneous approach as following alternative steps could lead to different assessments. It also contributes to minimising costs as the defined steps imply that complementary information and the associated analysis is only requested if needed, reinforcing proportionality. Therefore, Option 2 is the preferred option.
c. Assessment of resolvability depending on number of points of entry:
Option 1: different criteria and different elements to be considered depending on whether an SPE or a MPE approach has been chosen. Option 2: identical approach independently on whether an SPE or a MPE strategy has been followed. The Directive does not explicitly recognise in the assessment of resolvability the need to distinguish between ‘single-point-of-entry’ (SPE) or ‘top down’ resolution, whereby resolution actions (including bail-in) are triggered by home resolution authorities and “multiple-point-of29
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY entry” (MPE) resolution, whereby resolution action can also be triggered by one or more host regulators. The FSB guidance (July 2013) favours such distinction in the assessment as regards the appropriateness of the resolution strategy. So, following this guidance, Option 1 proposes that different criteria and different elements be considered depending on whether an SPE or a MPE approach has been chosen. However, the possibility that a combination of both strategies might be needed to accommodate the structure of a firm could make such distinction not extremely likely to effectively being implemented. The current RTS do not propose strategy specific (whether an SPE or a MPE) matters and criteria for the assessment of the feasibility and credibility of the resolution strategy (Option 2), but it proposes assessing the appropriateness of these strategies. The logic behind this approach is the following: the final objective of the assessment is to ensure that the firms are effectively resolvable but the nature of the problems that might need to be addressed to establish an effective framework for resolvability may be diverse across institutions and jurisdictions. Similar requirements could then result under both strategies which in this case is not desirable. Therefore, Option 2 seems more appropriate. d. Fall-back resolution options in the resolvability assessment Option 1: Carry out the assessment only for the preferred strategy and variants. Option 2: Carry out the assessment including fall-back options. The resolution plan should take into consideration the fact that the event of failure may be idiosyncratic or may occur at a time of broader financial instability or system wide events. The resolvability assessment could address all these possibilities (Option 2), setting a fall-back option or could only refer to a preferred strategy, with the possibility to introduce variants of that strategy to address circumstances in which it is not feasible (Option 1). The resolution tools that the resolutions authorities will use depend on the specific circumstances at the time of resolution. Therefore, it is not possible to determine the exact tools at disposal. An appropriate plan would however ensure that the objectives of protecting critical functions, government funds and systemic stability are met. A fall-back option plan has the advantage of addressing resolution in relation to other possible scenarios that may arise. A drawback of the fall-back option is that it will never be able to cover
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY all potential scenarios. Therefore, the fall-back plan may be very costly (and even more than the benefits) for the policy makers in terms of reduced credibility. Moreover, the availability of alternatives may lead confusion in the policy choice hence action may not be taken in a timely manner. A preferred strategy has the advantage of being consistent with the resolvability assessment which is carried out under such an approach. The preferred strategy is also aligned with the approach suggested by the FSB for resolution planning for global systemically important financial institutions. FSB argues that “experience has indicated that resolvability could only coherently be assessed on the basis of a clearly identified resolution strategy”. Its main drawback is that there may be cases where the strategy cannot be effectively applied due to deteriorating macroeconomic and financial conditions in the economy. The RTS includes an assessment option that is focussed on a preferred strategy, with the possibility to introduce variants of that strategy to address circumstances in which it is not feasible. As a result, Option 1 is selected as the preferred option.
4.1.8 Costs and benefits of chosen options
Extended resolution plans will need to be drawn up for all institutions or groups which are not feasibly and credibly resolvable through liquidation in accordance with normal insolvency procedures. Those that can be liquidated will have a resolution plan limited to the assessment of resolvability and in accordance with proportionality. Defining, analysing and maintaining resolvability plans would entail costs for both national authorities and institutions. Costs There are currently over 6000 credit institutions and over 3000 investment firms and about 600 foreign (EEA and non-EEA) branches operating in the EU7 . Before the introduction of the BRRD, only a few Member States (DE, DK, SE, and UK)8 operated special bank resolution systems. It is reasonable to expect that the impact of the current regulation in terms of costs will be higher for the institutions and firms that are not covered by these resolution systems. When the entities in these Member States are excluded then there are approximately 4000 credit institutions, 1000 investment firms and 500 (EEA and non-EEA) branches operating in the EU that do not have in 7 EBA, Aggregate Statistical Data: Data on national banking sector (2012). 8 BRRD IA, SWD(2012) 166 final (06.06.2012)
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY place a resolution framework that includes a resolution plan and assessment criteria for resolvability. In addition, the application of proportionality as defined in Article 4 of BRRD could substantially reduce these figures. It is reasonable to assume that at least all other systemically important domestic financial institutions (O-SIIs) will be subject to the regulation on resolution plan in accordance with the current RTS which will involve the description of a resolution strategy that is other than liquidation. It is assumed that at least 10% of these institutions, i.e. 420 credit institutions and 110 investment firms will be subject to the full development of a resolution plan and thus to the costs arising from the production of such plan. These RTS will generate direct costs among national competent authorities and/or resolution authorities that would have conducted less extensive or different assessments than those proposed by the RTS. These costs for the competent authorities will be mainly driven by the need to train existing staff or hire additional staff members that would need to carry out required assessments and to change some of their IT or system framework. According to the data published for Recovery and Resolution Plans in Germany 9 , the cost of developing a resolution plan for the resolution authority or other relevant authority in charge of resolution planning is estimated to be over €34,000 per firm. The same source also estimates the per-firm-cost for the authorities associated with the ex-ante resolvability assessment and annual ex-post resolvability assessment as €3,500 and €11,000 respectively. Also, the average cost associated with the colleges’ activities for an institution is about €6,500. Compliance costs of contributing to the production of resolution plan once a year will be incurred by banking groups. Institutions may incur further compliance costs if they have to commit additional resources to facilitate the analysis of the authority and reduce the probability of being assessed as non-resolvable. These costs for the institutions that are subject to resolution planning will be mainly driven by the need to provide data and information on a timely manner, to train existing staff or hire additional staff members that would need to provide the additional 9 Gesetzentwurf der Bundesregierung. “Entwurf eines Gesetzes zur Abschirmung von Risiken und zur Planung der Sanierung und Abwicklung von Kreditinstituten und Finanzgruppen” Drucksache 17/12601. 04. 03. 2013.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY information required. Additionally, the resulting measures to remove barriers to resolvability will certainly imply additional costs. The analysis uses the data from the UK FSA consultation paper10 to estimate cost figures for the EU Member States with some insights from the statistics in German industry11. The approach has some caveats but relies on most recent available data. The analysis is based on an application of the UK cost figures for other EU Member States. The UK figures present aggregate cost for recovery and resolution therefore statistics from German documentation which provide disaggregate data are used to isolate the figures for resolution plan. The estimated ongoing cost range per annum of producing a resolution plan for the EU is between €50 million and €114 million for the institutions. Table 1 presents the findings. 10 FSA, Consultation Paper 11/16. August 2011 “Recovery and Resolution plans”. 11 Gesetzentwurf der Bundesregierung. “Entwurf eines Gesetzes zur Abschirmung von Risiken und zur Planung der Sanierung und Abwicklung von Kreditinstituten und Finanzgruppen” Drucksache 17/12601. 04.03.2013.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
Table 1 Estimated ongoing annual cost for developing a resolution plans for the institutions in EU Member States*
MS Total assets Total assets of large institutions Asset share of large institutions Total assets of medium-size institutions Asset share of mediumsize institutions Total assets of small institutions Asset share of small institutions Cost range for developing a resolution plan - total institutions Cost range for developing a resolution plan - large institutions Cost range for developing a resolution plan - medium-size institutions Cost range for developing a resolution plan - small institutions [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] AT 847,589,865 722,603,000 85% 124,986,865 15% 1,205 2,717 1,027 2,316 178 401 BE 520,302,800 224,824,163 43% 293,268,264 56% 2,210,373 0% 740 1,668 320 721 417 940 3 7 BG 11,127,105 11,127,105 100% 16 36 16 36 CY 75,064,383 73,267,361 98% 1,797,022 2% 107 241 104 235 3 6 CZ 13,028,832 10,829,868 83% 2,198,964 17% 19 42 15 35 3 7 DK 806,734,468 662,137,382 82% 117,046,702 15% 27,550,384 3% 1,147 2,586 941 2,122 166 375 39 88 EE 742,004 742,004 100% 1 2 1 2 FI 148,519,348 133,114,285 90% 15,405,063 10% 211 476 189 427 22 49 FR 6,583,470,345 6,313,586,933 96% 268,440,760 4% 1,442,652 0% 9,361 21,100 8,977 20,235 382 860 2 5 DE 7,257,126,818 4,103,443,106 57% 2,394,760,315 33% 758,923,397 10% 10,319 23,259 5,835 13,152 3,405 7,675 1,079 2,432 EL 346,003,175 343,819,191 99% 2,183,984 1% 492 1,109 489 1,102 3 7 HU 44,955,564 36,649,394 82% 8,306,170 18% 64 144 52 117 12 27 IE 351,617,924 0 0% 351,617,924 100% 0 0% 500 1,127 0 0 500 1,127 0 0 IT 2,602,741,896 1,750,459,712 67% 834,803,378 32% 17,478,806 1% 3,701 8,342 2,489 5,610 1,187 2,676 25 56 LV 10,714,603 7,631,730 71% 3,082,873 29% 15 34 11 24 4 10 LI 1,214,208 1,214,208 100% 2 4 2 4 LU 90,445,068 84,048,497 93% 6,396,571 7% 129 290 120 269 9 21 MT 11,574,699 0 0% 11,574,699 100% 16 37 0 0 16 37 NL 2,414,614,785 1,982,356,783 82% 429,127,265 18% 3,130,737 0% 3,433 7,739 2,819 6,353 610 1,375 4 10 PL 127,570,437 0 0% 101,758,965 80% 25,811,472 20% 181 409 0 0 145 326 37 83 PT 384,519,349 0 0% 379,631,230 99% 4,888,119 1% 547 1,232 0 0 540 1,217 7 16 RO 8,457,913 6,070,269 72% 2,387,644 28% 12 27 9 19 3 8 SK 6,466,296 6,466,296 100% 9 21 9 21 SI 34,577,817 29,802,221 86% 4,775,596 14% 49 111 42 96 7 15 ES 3,594,895,539 2,552,047,564 71% 1,013,470,726 28% 29,377,249 1% 5,111 11,522 3,629 8,179 1,441 3,248 42 94 SE 1,626,385,155 1,450,905,203 89% 161,136,263 10% 14,343,689 1% 2,312 5,213 2,063 4,650 229 516 20 46 UK 7,551,021,992 7,249,000,076 96% 269,516,755 4% 32,505,161 0% 10,736 24,201 10,307 23,233 383 864 46 104 EU 35,471,482,388 26,288,760,922 8,062,414,363 1,120,307,103 15% 50,435 113,686 37,379 84,256 11,464 25,840 1,593 3,591 *Source and notes: - ECB Statistical Data Warehouse: Consolidated banking data. - Assets are expressed in monetary values, in thousands of Euros.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY The UK FSA consultation paper provides an estimated range of cost for producing a recovery and resolution plan for the entire industry. In the approach, the analysis team first expressed the cost of producing a recovery and resolution plan in per asset terms, i.e. cost range for the entire industry over total assets. It is then assumed that the share of developing a resolution plan for an institution in total costs of producing a recovery and resolution plan in the UK is the same as in Germany, i.e. 10.4%. The cost range for producing a resolution plan per asset is then calculated. Columns [I] – [L] in Table 1 present the ongoing cost ranges (calculated as asset value times cost per asset) by the size category of the institutions in each Member States. The estimated cost falls within a range of €37 million to €84 million for large institutions, €11 million to €26 million for medium-size institutions and €1.6 million to €3.6 million for small institutions. The figures are estimation only and a caveat of the approach is that it assumes a linear relation between the asset size and the cost for preparing a resolution plan, i.e. the higher the asset value of an institution the more costly preparing a resolution plan will be. Similarly, Table 2 presents the range for potential on-off cost estimates that can the institutions may bear in producing resolution plans. One-off costs are defined as costs that are incurred only once e.g. IT and systems costs, staff training costs or similar.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY
Table 2 Estimated one-off cost for developing resolution plans for the institutions in EU Member States*
MS Total assets Total assets of large institutions Asset share of large institutions Total assets of medium-size institutions Asset share of mediumsize institutions Total assets of small institutions Asset share of small institutions Cost range for developing a resolution plan - total institutions Cost range for developing a resolution plan - large institutions Cost range for developing a resolution plan - medium-size institutions Cost range for developing a resolution plan - small institutions [A] [B] [C] [D] [E] [F] [G] [H] [I] [J] [K] [L] AT 847,589,865 722,603,000 85% 124,986,865 15% 120 9,908 102 8,447 18 1,461 BE 520,302,800 224,824,163 43% 293,268,264 56% 2,210,373 0% 74 6,082 32 2,628 42 3,428 0 26 BG 11,127,105 11,127,105 100% 2 130 2 130 CY 75,064,383 73,267,361 98% 1,797,022 2% 11 877 10 856 0 21 CZ 13,028,832 10,829,868 83% 2,198,964 17% 2 152 2 127 0 26 DK 806,734,468 662,137,382 82% 117,046,702 15% 27,550,384 3% 114 9,430 94 7,740 17 1,368 4 322 EE 742,004 742,004 100% 0 9 0 9 FI 148,519,348 133,114,285 90% 15,405,063 10% 21 1,736 19 1,556 2 180 FR 6,583,470,345 6,313,586,933 96% 268,440,760 4% 1,442,652 0% 933 76,956 895 73,801 38 3,138 0 17 DE 7,257,126,818 4,103,443,106 57% 2,394,760,315 33% 758,923,397 10% 1,028 84,831 581 47,966 339 27,993 108 8,871 EL 346,003,175 343,819,191 99% 2,183,984 1% 49 4,045 49 4,019 0 26 HU 44,955,564 36,649,394 82% 8,306,170 18% 6 525 5 428 1 97 IE 351,617,924 0 0% 351,617,924 100% 0 0% 50 4,110 50 4,110 IT 2,602,741,896 1,750,459,712 67% 834,803,378 32% 17,478,806 1% 369 30,424 248 20,462 118 9,758 2 204 LV 10,714,603 7,631,730 71% 3,082,873 29% 2 125 1 89 0 36 LI 1,214,208 1,214,208 100% 0 14 0 14 LU 90,445,068 84,048,497 93% 6,396,571 7% 13 1,057 12 982 1 75 MT 11,574,699 0 0% 11,574,699 100% 2 135 0 0 2 135 NL 2,414,614,785 1,982,356,783 82% 429,127,265 18% 3,130,737 0% 342 28,225 281 23,172 61 5,016 0 37 PL 127,570,437 0 0% 101,758,965 80% 25,811,472 20% 18 1,491 0 0 14 1,189 4 302 PT 384,519,349 0 0% 379,631,230 99% 4,888,119 1% 54 4,495 0 0 54 4,438 1 57 RO 8,457,913 6,070,269 72% 2,387,644 28% 1 99 1 71 0 28 SK 6,466,296 6,466,296 100% 1 76 1 76 SI 34,577,817 29,802,221 86% 4,775,596 14% 5 404 4 348 1 56 ES 3,594,895,539 2,552,047,564 71% 1,013,470,726 28% 29,377,249 1% 509 42,022 362 29,832 144 11,847 4 343 SE 1,626,385,155 1,450,905,203 89% 161,136,263 10% 14,343,689 1% 230 19,011 206 16,960 23 1,884 2 168 UK 7,551,021,992 7,249,000,076 96% 269,516,755 4% 32,505,161 0% 1,070 88,266 1,027 84,736 38 3,150 5 380 EU 35,471,482,388 26,288,760,922 8,062,414,363 1,120,307,103 15% 5,026 414,636 3,725 307,297 1,142 94,244 159 13,096 *Source and notes: - ECB Statistical Data Warehouse: Consolidated banking data. - Assets are expressed in monetary values, in thousands of Euros.
RTS ON THE CONTENT OF RESOLUTION PLANS AND THE ASSESSMENT OF RESOLVABILITY Benefits Resolution plans are expected to reduce moral hazard. They signal to the market that authorities will take action to avoid rescuing large firms, and that no firm is necessarily considered as too big or too complex or too interconnected to fail. This can already have a positive effect on market discipline. The RTS will help competent authorities promptly identify potential issues that may impede the resolvability of their institutions. Specifying a general requirement to assess resolvability with respect to broad categories of requirement increases the chances that the assessment process will identify any potential issues. This analysis will determine which actions may need to be taken by the institutions to ensure feasible and credible resolution. It will also ensure that the analysis of resolvability is conducted under the same standards across the EU and facilitate the cooperation of national authorities supervising the same cross-border institution. Resolution strategies in EU MS will become more credible if a common framework is followed, as it could act as an effective anchor. It will also provide institutions with criteria to define their strategies that ensure their resolvability at their lowest cost. It is expected that the benefits of rapid and more effective supervisory actions and minimising moral hazard would substantially exceed the costs generated by the regulation.
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY
4.2 Views of the Banking Stakeholder Group (BSG)
The BSG supported the EBA’s view that resolution authorities need to identify a resolution strategy to carry out effective resolution planning and resolvability assessment. The BSG considered that this strategy should not be overly detailed, and in particular supported a phased approach to resolution planning to avoid disproportionate information requirements. The BSG also considered that there should not be an overly wide range of variant strategies considered. As respondents to the consultation in general, the BSG did not support further distinctions between more or less essential critical functions. On the issue of whether further specification is needed of how loss absorption in banking groups is implemented, the BSG held the view that no further specification would be needed, as each group has its own characteristics.
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY
4.3 Feedback on the public consultation
The EBA publicly consulted on the draft proposal contained in this paper. The consultation period started on 9 July 2014 and ended on 9 October 2014. 10 responses were received, of which 8 were published on the EBA website. This paper presents a summary of the key points and other comments arising from the consultation, the analysis and discussion triggered by these comments and the actions taken to address them if deemed necessary. In many cases several industry bodies made similar comments or the same body repeated its comments in the response to different questions. In such cases, the comments, and EBA analysis are included in the section of this paper where EBA considers them most appropriate. Changes to the draft Guidelines have been incorporated as a result of the responses received during the public consultation. Summary of key issues and the EBA’s response The main points raised by the respondents with regard to these draft RTS are as follows:
SPE/MPE distinction
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY It may be necessary to plan variant strategies to be used in the event that the preferred resolution strategy is unlikely to be effective in its stated objectives or cannot feasibly be implemented. For this to be achieved, the guidelines on removing impediments to resolvability therefore explicitly clarify in paragraph (6) that measures required to remove impediments to alternative variants should only be implemented if they do not impair the feasible and credible implementation of the preferred option. This prevents resolution authorities from implementing inconsistent and contradictory measures. Loss absorbing capacity Several respondents were concerned that the term ‘loss absorbing capacity’ may not have precisely the same meaning in the RTS as in the recent FSB policy proposal, and that this could lead to confusion. EBA response:
The draft RTS text has been amended to take account of further policy development work on both the FSB’s proposals on loss absorbing capacity and on the criteria for setting MREL under the BRRD. The term ‘loss absorbing capacity’ is no longer used. Impediments to business reorganisation Some respondents felt that the RTS should not require resolution authorities to identify impediments to the longer-term reorganisation of a resolved bank. EBA response:
Reorganisation to address the causes of failure is necessary to achieve the objectives of resolution, and is explicitly required by the BRRD in cases where the bail-in tool is used. This requirement has therefore been retained. The RTS makes clear that the requirement to remove impediments to business reorganisation is further specified to address only foreseeable impediments. As emphasised in the EBA guidelines on measures to remove impediments to resolvability, any such measures must also be proportionate and necessary.
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY Summary of responses to the consultation and the EBA’s analysis (NB article numbers refer to the consultation paper version of the RTS unless otherwise specified). proposals General comments
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY proposals the articles of the RTS as they are beyond the scope of the BRRD level one text.
3. Recognition of 3rd country led
resolution of bank in the EU
One respondent considered it important for the RTS to preserve flexibility so that the resolution plan for a bank within Europe could be to recognise and give effect to a t third country home authority led resolution of the global banking group and therefore, would not necessitate an SPE or MPE strategy within Europe. Another respondent suggested that within the SSM it is likely to make sense to apply an SPE approach, while for groups headquartered outside the EU, it will make sense to apply an MPE approach. The RTS does not preclude a global resolution strategy for a global group operating both in the EU and a third country jurisdiction. Equally, the RTS does not imply that a MPE approach is more appropriate for parts of a banking group operating outside the EU. No amendments
4. Removing impediments to both
stabilisation and business reorganisation
Respondents agreed that impediments to resolution need to be removed to ensure a failing firm can be stabilised. However, since causes of failure are uncertain, some did not agree that removing impediments to business reorganisation is appropriate or proportionate. One respondent considered that the RTS should reflect that the ultimate goal of a resolution business reorganisation should be for the bank to exit the market On timing, one respondent said it is important to emphasise that resolvability assessment is an ongoing process that evolves overtime as firm’s work to remove barriers The BRRD requires resolution authorities to ensure resolution plans are feasible and credible. This may necessitate the use of BRRD Article 17 measure to remove impediments to resolvability, which includes both stabilisation and a business reorganisation to address the cause of failure. The RTS makes clear that the requirement to remove impediments to business reorganisation is further specified to address only foreseeable impediments. The BRRD creates no requirement for the authorities to ensure a resolved Amendment to Article 7(2) to make clear that BRRD Article 17 measures can be used to remove impediment to stabilisation and foreseeable impediments to business reorganisation.
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY proposals institution exits the market As emphasised in the EBA Guidelines on measures to remove impediments to resolvability, any such measures must also be proportionate and necessary
5. Definition of loss absorbing
capacity
Several respondents noted the importance of aligning the definition of loss absorbing capacity in the this RTS with the RTS on MREL The EBA agrees that it is important for this RTS to align with the RTS on Criteria for determining MREL. We agree that we should avoid introducing a new definition of loss absorbing capacity in these RTS and should instead draw on the terminology likely to be used in the RTS on Criteria for determining MREL. Removal of the definition of loss absorbing capacity. This deletion should be reflected in the body of the RTS, replacing the definition of loss absorbing capacity with “liabilities expected to contribute to loss absorption and recapitalisation” Amendment to the start of Article 7(5)(b) so that it reads “Resolution authorities need to identify any liabilities which are not likely to contribute to loss absorption or recapitalisation under the preferred resolution strategy, considering at a
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY proposals minimum the following factors” Amendment to Article 6(3)(b) to replace ’quality’ with ’risk of liabilities not contributing to loss absorption or recapitalisation’ and replace ’other loss absorbing capacity’ with ’liabilities expected to contribute to loss absorption and recapitalisation’
6. Preferred versus variant
resolution strategies
Most respondents expressed a concern regarding requirements to prepare, and remove impediments to, variants resolution strategies. Many preferred to characterise the variant resolution strategies as a sub-set of the preferred resolution strategies, rather than an entirely different resolution strategy. One respondent questioned whether the selection of a preferred resolution strategy as a basis for conducting the resolvability assessment is consistent with the BRRD requirement to prepare different resolution strategies for different scenarios. Resolution authorities may also identify variant strategies to be applied in circumstances where the preferred resolution strategy is likely to fail in its stated objectives or where it is unlikely to be possibleto implement it successfully. This particularly applies to cross-border groups. If authorities consider variant strategies necessary, impediments to the implementation of any variants could be taken into account and removed where authorities judge necessary. However, these measures should be compatible with and should not impair feasible and credible See revised recitals 4 and 5 In Article 6(4), reiterate that measures required to remove impediments to variants should only be implemented if they do not impair the feasible and credible implementation of the preferred option.
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY proposals implementation of the preferred resolution strategy.
7. Assessment of credibility Some respondents disagreed with the assessment of
credibility occurring after the identification of impediments to resolvability; instead they considered the credibility assessment a component of theassessment of liquidation under Article 5. The process established in Article 4 (1) for the assessment of resolvability is an iterative process. Article 4(5) makes clear that a resolution authority shall revise the preferred resolution strategy or consider alternative strategies based on a completed assessment of resolvability under the resolution strategy selected as per Article 4(1)(b). In recital 4, emphasise that the steps set out in
Article 4(1) represents
an iterative resolvability assessment framework Provide clarification in
Article 4( 5) to
emphasise the iterative nature of the resolvability assessment.
8. Definitions Include a description of third country in Art2 list of
definitions
The term ’third country’ is well understood terminology in EU legislation and EBA regulatory products. No amendment
9. Content of resolution plans One respondent disagreed with the emphasis in Article
3(b)(v) on resolution plans including detail on variant resolution strategies Respondents made a number of minor suggestions, as follows:
I. Include ’where relevant’ in first sentence of
Article 3(c)
II. Include share/bond holders and depositors as
parties covered by Article 3(f)iii on
Resolution authorities may identify variant strategies to be applied in circumstances where the preferred resolution strategy is likely to fail in its stated objectives or where it is unlikely to be possible to implement it successfully. The EBA agrees with points (II) and (III). Amendment to the reference to communications to include shareholders, bondholders and depositors explicitly inclusion of a requirement to summarise the conclusions of the
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY proposals communications
III. Include a summary of the assessment of
insolvency option as an Article 3 requirement liquidation assessment required under Article 4(1)a Responses to questions in Consultation Paper EBA/CP/2014/16 Question 1. Do you agree that this step should be distinguished from the assessment of resolution strategies and carried out first? The majority of respondents were supportive of assessing liquidation before deciding whether a resolution plan is required Some respondents noted once it has been decided that a resolution plan and resolvability assessment is required, assessing liquidation should not be an excessively detailed process particularly for large systemic firms, and should not be an ongoing requirement. A few respondents proposed that the Article 5 assessment of systemic impact of liquidation be conducted before assessing the operational feasibility of firm’s systems to support DGS work in liquidation, and to clarify that if the former is sufficient to require a resolution plan, the latter assessment is not required to decide a resolution plan is required.
Article 5 requires resolution
authorities to conduct an assessment of feasibility and credibility of liquidation for all firms, regardless of size, a summary of which should be include in the resolution plan as specified in Art3(g)ii. On Article 5 ordering of the aspect of the liquidation assessment, the EBA agrees that if it is judged that a firm cannot be liquidated due to concerns related to systemic impact, then that is sufficient basis for considering that a resolution plan is required and that a resolvability assessment should be conducted. However, even for firms that could beliquidated without systemic impact, the inability of the firm’s systems to support the DGS efforts to protect depositors may mean liquidation is not feasible and therefore, may also be used as a sufficient basis for considering a resolution plan is required and conducting a Amendment to Article 5 to reverse the ordering of paragraph 2 on assessment of systemic impact of liquidation and paragraph 3 on whether a firm’s systems are able to support the DGS. Amendment to paragraph 4 to make clear that judgement that liquidation is not credible is sufficient basis for conducting a resolvability assessment
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY proposals resolvability assessment. Therefore, an assessment of firm’s systems to provide information required by DGS in liquidation is required by Article 5 unless it can be demonstrated liquidation of the firm would have a systemic impact – the former can be a basis on its own for the requirement to develop a resolution strategy. Question 2. Do you agree that this initial stage (preliminary identification of resolution strategies) should be separately identified? The majority of respondents agreed that the use of a resolution strategy is useful to set out the perimeter of a resolvability assessment and some considered that a choice for the resolution plan between SPE and MPE has to be made to assess firm resolvability in a meaningful way as they are radically opposed options. One respondent felt that within the SSM area, the SPE would be the preferred approach for intra-EU groups, while for groups from outside the EU, MPE would be the preferred resolution plan for the activities in the EU. A number of respondents felt it was appropriate to require authorities to inform firms of the authorities decision with respect to the preferred resolution strategy for the purposes of Articles 6, 7, and 8 assessment The RTS requirements do not create a presumption with respect to whether SPE or MPE is more or less appropriate when involving a third country jurisdiction or a third country headquartered bank operating in the EU. The selection of a preferred resolution strategy and agreement of the resolvability assessment with third country authorities is a matter for resolution colleges or, where appropriate, FSB Crisis Management Groups for G-SIBs to discuss. These RTS cannot create new resolution strategy disclosure requirements for resolution authorities not specified in the BRRD Level 1 text. No amendment Question 3. Do you have comments Respondents agreed with the general approach proposed On Article 6(3)(a) requirements, the Amend Article 6(3)a to
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY proposals on the criteria proposed in Article 5 of the RTS, or their application to single- and multiple- point of entry strategies? in Articles 5 and 6. Respondents made a number of more detailed comments on the contents of Article 6, as follows:
I. In addition to a description of the tools that are
available, Article 6(3)a should include a description of the resolution tool which will be used
II. Clarify that Article 6(3)c requirement is mostly
relevant for SPE, as in an MPE you want to prevent losses being transferred between legal entities which are to be resolved separately or by different resolution authorities
III. One respondent considered Article 6(3)c should
also require a similar assessment be made of arrangements for moving capital and liquidity around the group. EBA agrees that a description of both the tools envisaged under the preferred resolution strategy is needed and it needs to be considered whether those tools are available. On Article 6(3)(c) , the EBA does not agree that arrangements in place for losses to be transferred between legal entities in a group are only relevant in an SPE context. For example, MPE sub-groups may need to consider mechanisms for the transfer of losses between the MPE sub-group entities. The EBA agrees that the assessment of arrangements for moving capital and liquidity around the group are relevant for assessment of feasibility of MPE include explicit reference to tools that would be used under the preferred strategy Amend Article 6(3)d.ii to further elaborate on the definition of independence to include financial arrangements between MPE subgroups, as well as legal and operational interdependencies. Question 4. Do you have comments on how those criteria should be applied to variant strategies? All respondents noted the importance of clearly defining the role of variant resolution strategies and many expressed concern about being expected to remove barriers to multiple resolution strategies Some respondents suggested replacing ’variant strategies’ with ’alternative options within the preferred strategy’ or to more clearly define ‘variant strategies’ as a subset or simple variation of the preferred strategy. Resolution authorities may also identify variant strategies to be applied in circumstances where the preferred resolution strategy is likely to fail in its stated objectives or it is unlikely to be possible to implement it successfully. However, the process for assessing resolvability is designed to ensure that feasible and credible resolution options consistent with the BRRD requirements are available in the In Article 6(4), reiterate that measures required to remove impediments to variants should only be implemented if they do not impair the feasible and credible implementation of the preferred resolution strategy.
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY proposals event of firm failure. Selecting a preferred strategy is part of achieving this outcome. This is consistent also with FSB key attributes and other international standards. Variants strategies may be attractive to some resolution authorities. However, according to these RTS that they must be compatible with the preferred strategy. Question 5. Do you agree that these categories are appropriate and comprehensive? One respondent proposed changing the title of this article to ’Assessment of feasibility of the selected resolution strategy’ to clarify that the priority of the assessment is the preferred resolution strategy as opposed to variant strategies initially. As noted in recital 3, the assessment of resolvability is only possible by selecting a preferred resolution strategy to structure the assessment of a firm’s resolvability. That considered, it is clear from the process established in Article that this assessment is an iterative process and resolution authorities may ,having assessed resolvability under one strategy, conclude that an alternative strategy should be assessed or is more appropriate. Amendment to the title of Articles 6 and 8 to refer to “a” resolution strategy which is consistent with title of Articles 7 Question 6. Do you have comments on the matters identified under each category? Respondents generally agreed with the matters identified under each category. A few responses noted some specific points, as follows:
I. Article 7(6)c regarding information, more detail
on what information will be required for valuation purposes was requested as well as The RTS on valuation for the purposes of resolution will provide further elaboration on what information is require for valuation proposes. A draft RTS on valuation for the purposes of resolution has been published by the EBA for public consultation. (ii) The
GUIDELINES ON MEASURES TO REDUCE OF REMOVE IMPEDIMENTS TO RESOLVABILITY proposals clarity that this information would be provide to authorities for them to conduct the valuation, not the firm
II. Article 7(7)c should be limited to material
contracts which contain rights to terminate in resolution which cannot be overridden by resolution powers or the recognition of resolution powers by another jurisdiction.
III. Article 7(5)d on funding in resolution should
include more detail on how funding needs would be quantified on a standardised basis across jurisdictions. EBA agrees with proposed change (iii) Article 3(e) provides further details on the type of information required to specify funding requirements in the content of resolution plans . Future FSB standards on funding in resolution will provide more detail on how funding need would be quantified in 2015.
Note from RegAlert. AI assistants can read this document in full, and search 70,000+ more, through the RegAlert MCP connector (https://mcp.regalert.today/mcp). Free with an account. How to connect ChatGPT, Claude or Cursor.
RegAlert holds no document that amends or replaces this one. This is not a check that it is in force: confirm with the regulator.
“Directive 2014/59/EU (the Bank Recovery and Resolution Directive, or BRRD) mandates the EBA (in Articles 10 and 12) to develop draft Regulatory Technical Standards”
“Directive 2013/36/EU of the European Parliament and Council of 26 June 2013 on access to the activity of credit institutions and the prudential supervision of credit institutions”
“assess whether it would be feasible for deposit guarantee schemes to fulfill their obligations under Directive 2014/49/EU to ensure the timely repayment of covered deposits.”
“Regulation (EU) No 1093/2010 of the European Parliament and of the Council establishing a European Supervisory Authority (European Banking Authority)”
More like this from EBA
EBA published 1 document in the last 30 days. We email you each new one the day it's published.
Source: European Banking Authority — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works
In RegAlert: added