Guidance · PACRA · 31 Oct 2025
PACRA has established a standardized assessment framework and rating scale for REIT Managers, defining quality tiers from RM1 (Very high) to RM5 (Weak). The framework outlines specific rating actions including Outlook, Rating Watch, Suspension, Withdrawn, and Harmonization to reflect intermediate trends and material events. Ongoing surveillance is mandated through comprehensive reviews at least every six months, with interim assessments triggered by significant operational or financial developments.
REIT Manager Rating
Scale
| REIT Manager Rating Scale | |
|---|---|
| An independent opinion on a REIT Manager’s Quality of investment and operations management. |
| Scale | Long-Term Rating |
|---|---|
| RM1 | Very high quality of investment and operations management. |
| RM2++; RM2+; RM2 | High quality of investment and operations management. |
| RM3++; RM3+; RM3 | Good quality of investment and operations management. |
| RM4++; RM4+; RM4 | Adequate quality of investment and operations management. |
| RM5 | Weak quality of investment and operations management. |
| Rating Modifiers | Rating Actions | |||
|---|---|---|---|---|
| Outlook (Stable, Positive, Negative, Developing); Indicates the potential and direction of a rating over the intermediate term in response to trends in economic and/or fundamental business / financial conditions. It is not necessarily a precursor to a rating change. ‘Stable’ outlook means a rating is not likely to change. ‘Positive’ means it may be raised. ‘Negative’ means it may be lowered. Where the trends have conflicting elements, the outlook may be described as ‘Developing’. | Rating Watch; Alerts to the possibility of a rating change subsequent to, or, in anticipation of some material identifiable event with indeterminable rating implications. But it does not mean that a rating change is inevitable. A watch should be resolved within foreseeable future, but may continue if underlying circumstances are not settled. Rating watch may accompany rating outlook of the respective opinion. | Suspension; It is not possible to update an opinion due to lack of requisite information. Opinion should be resumed in foreseeable future. However, if this does not happen within six (6) months, the rating should be considered withdrawn. | Withdrawn; A rating is withdrawn on a) termination of rating mandate, b) the debt instrument is redeemed, c) the rating remains suspended for six months, d) the entity/issuer defaults., or/and e) PACRA finds it impractical to surveil the opinion due to lack of requisite information. | Harmonization; A change in rating due to revision in applicable methodology or underlying scale. |
Surveillance. Surveillance on a publicly disseminated rating opinion is carried out on an ongoing basis till it is formally suspended or withdrawn. A comprehensive surveillance of rating opinion is carried out at least once every six months. However, a rating opinion may be reviewed in the intervening period if it is necessitated by any material happening. Rating actions may include "maintain", "upgrade", or "downgrade".
Disclaimer: PACRA has used due care in preparation of this document. Our information has been obtained from sources we consider to be reliable but its accuracy or completeness is not guaranteed. PACRA shall owe no liability whatsoever to any loss or damage caused by or resulting from any error in such information. Contents of PACRA documents may be used, with due care and in the right context, with credit to PACRA. Our reports and ratings constitute opinions, not recommendations to buy or to sell.
Note from RegAlert. AI assistants can read this document in full, and search 70,000+ more, through the RegAlert MCP connector (https://mcp.regalert.today/mcp). Free with an account. How to connect ChatGPT, Claude or Cursor.
More like this from PACRA
We email you every new PACRA publication the day it's published.
Source: The Pakistan Credit Rating Agency — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works
In RegAlert: added · updated