Rule · BCB · 15 Sep 2009 · Circular 3467

Circular No. 3467 — Establishes criteria for the preparation of reports assessing the quality and adequacy of the internal control system and of non-compliance with legal and regulatory provisions and provides other measures

Banks, other Central Bank of Brazil-authorized institutions with audit committees, consortium administrators and credit cooperatives must prepare internal-control and non-compliance reports covering control environment, risk assessment, controls, information, monitoring and deficiencies, issued within 45 days of publishing audited financial statements. They must register auditor data in Unicad within 10 days of contracting or replacement, keep replacement documentation five years, and register the responsible director within 10 days of appointment. Circular No. 2,676 is revoked.

BrazilBanco Central do Brasil
Annotations and obligations
52 obligations · 1 permission · 11 definitions
  • Obligation 52
  • Permission 1
  • Definition / condition 11
  • background, boilerplate

Lineage: Superseded

A newer document in RegAlert replaces this one.

Lei n.º 4.595, de 31 de dezembrode 1964 — dispõe sobre a política…1964 · BR-LAWLei n.º 4.595, de 31 de dezembro de 1964 — dispõe sobre a política e as instituições monetárias, bancárias e creditícias (establishes the National Financial System and the Banco Central do Brasil) (1964-12-31)CMN Resolution No. 2682 — Criteriafor Classifying Credit Operations…1999 · BCBCMN Resolution No. 2682 — Criteria for Classifying Credit Operations and Rules for Establishing Provisions for Doubtful Collection Credits (1999-12-21)Resolution CMN No. 3442 —Provisions on the Constitution an…2007 · BCBResolution CMN No. 3442 — Provisions on the Constitution and Operation of Credit Cooperatives (2007-02-28)Law No. 11.795 dated 2008-10-08Not in RegAlertLaw No. 11.795 dated 2008-10-08 — Not in RegAlertCircular No. 2676 — Establishescomplementary rules on independen…1996 · BCBCircular No. 2676 — Establishes complementary rules on independent auditing in financial institutions, other entities authorized to operate by the Central Bank of Brazil, investment funds and consortium administrators (1996-04-10)Mentions (2)documents this one mentionsopen the list below the graph ▾Mentions (2): documents this one mentions without changing it — open the list below the graphCircular No. 3467 —Establishes criteria for the …2009-09-15 · this documentCircular No. 3467 — Establishes criteria for the preparation of reports assessing the quality and adequacy of the internal control system and of non-compliance with legal and regulatory provisions and provides other measures (2009-09-15)Circular No. 3.482 — AmendsCircular No. 3.467 of 14 Septembe…2010 · BCBCircular No. 3.482 — Amends Circular No. 3.467 of 14 September 2009, which establishes criteria for preparing the report assessing the quality and adequacy of the internal control system and non-compliance with legal and regulatory provisions (2010-01-21)Resolution BCB No. 130 —Independent Audit Services for In…2021 · BCBResolution BCB No. 130 — Independent Audit Services for Institutions Regulated by the Central Bank of Brazil (2021-08-20)Mentions (1)a document that mentions itopen the list below the graph ▾Mentions (1): a document that mentions it without changing it — open the list below the graph
amendssupersedesissued underrefers todashed card: not in RegAlert (or proposed)arrows run from the older text to the one that changes it
The links and the sentences they come from (7)
Superseded by
Supersedes
Amended by
Issued under
Mentions (3): 2 documents this one mentions and 1 document that mentions it, without changing it

What changed in the obligations

Against Circular No. 2676 — Establishes complementary rules on independent auditing in financial institutions, other entities authorized to operate by the Central Bank of Brazil, investment funds and consortium administrators (1996-04-10)

33 new obligations · 1 changed obligation · 1 deadline changed · 1 change of who is bound · 3 not carried over

7 obligations are the same in both texts.

Changed (3)
  • Deadline
    Before
    Art. 2 The reports of the independent auditors on the work performed at the institutions and entities referred to in the previous article, as well as at the consortium administrators, must be issued within 30 (thirty) days from the date of effective delivery of the financial statements subject to the auditing services to the Regional Office of the Central Bank of Brazil to which the respective in…
    Now
    Art. 9 The reports mentioned in arts. 1 and 7 must be issued within 45 (forty-five) days after the date of publication of the financial statements subject to independent audit, except for the situations provided for in art. 26 of Resolution No. 3,442, of February 28, 2007.
  • What must be done
    Before
    Art. 5 The name of the administrator responsible for the monitoring, supervision and compliance with accounting and auditing rules and procedures (Director Responsible for the Accounting/Auditing Area), designated in the form of art. 7 of Resolution No. 2.267, of 29.03.96, must be communicated to the Regional Office of the Central Bank of Brazil to which the institution, entity or administrator i…
    Now
    Art. 11. The data related to the director responsible for the monitoring, supervision and compliance with accounting and auditing norms and procedures, designated in the form of arts. 5 of the Regulation annexed to Resolution No. 3,198, of 2004, and 5 of the Regulation annexed to Circular No. 3,192, of 2003, must be registered within 10 (ten) days counted from the date of appointment and kept upd…
  • Who is bound
    Before
    Paragraph 2 The responsible administrator, when summoned by the Central Bank of Brazil, must appear accompanied by the independent auditor.
    Now
    Art. 12. The director responsible for the monitoring, supervision and compliance with accounting and auditing norms and procedures, when summoned by the Central Bank of Brazil, must appear accompanied by the independent auditor or by the technical manager responsible for the cooperative audit entity referred to in § 1 of art. 23 of Resolution No. 3,442, of 2007.
New in this text (33)
  • Art. 1 The report assessing the quality and adequacy of the internal control system, including electronic data processing and risk management systems, prepared as a result of the independent audit work, as provided for in art. 21, item II, of the Regulation annexed to Resolution No. 3.198, of 27 Ma… I - control environment;
  • Art. 1 The report assessing the quality and adequacy of the internal control system, including electronic data processing and risk management systems, prepared as a result of the independent audit work, as provided for in art. 21, item II, of the Regulation annexed to Resolution No. 3.198, of 27 Ma… II - risk identification and assessment;
  • Art. 1 The report assessing the quality and adequacy of the internal control system, including electronic data processing and risk management systems, prepared as a result of the independent audit work, as provided for in art. 21, item II, of the Regulation annexed to Resolution No. 3.198, of 27 Ma… III - controls;
  • Art. 1 The report assessing the quality and adequacy of the internal control system, including electronic data processing and risk management systems, prepared as a result of the independent audit work, as provided for in art. 21, item II, of the Regulation annexed to Resolution No. 3.198, of 27 Ma… IV - information and communication;
  • Art. 1 The report assessing the quality and adequacy of the internal control system, including electronic data processing and risk management systems, prepared as a result of the independent audit work, as provided for in art. 21, item II, of the Regulation annexed to Resolution No. 3.198, of 27 Ma… V - monitoring and improvement; and
  • Art. 1 The report assessing the quality and adequacy of the internal control system, including electronic data processing and risk management systems, prepared as a result of the independent audit work, as provided for in art. 21, item II, of the Regulation annexed to Resolution No. 3.198, of 27 Ma… VI - identified deficiencies.
  • Art. 1 The report assessing the quality and adequacy of the internal control system, including electronic data processing and risk management systems, prepared as a result of the independent audit work, as provided for in art. 21, item II, of the Regulation annexed to Resolution No. 3.198, of 27 Ma… § 2 For consortium administrators, credit cooperatives and other financial institutions not covere…
  • Art. 2 The description of the aspects relating to the control environment provided for in art. 1, item I, must address the institution's control culture, including, at least, the following elements: I - commitment to ethics and integrity: existence of evidence of the institution's management commitment to ethics and integrity, including, but not limited to, the establishment of a code of ethics a…
  • Art. 2 The description of the aspects relating to the control environment provided for in art. 1, item I, must address the institution's control culture, including, at least, the following elements: II - technical competence: existence of evidence presented by the institution's management regarding the criteria adopted for the selection and evaluation of the professionals in its staff;
  • Art. 2 The description of the aspects relating to the control environment provided for in art. 1, item I, must address the institution's control culture, including, at least, the following elements: III - institutional policies: existence of evidence of such policies, as well as of processes that ensure their dissemination within the organization;
  • Art. 2 The description of the aspects relating to the control environment provided for in art. 1, item I, must address the institution's control culture, including, at least, the following elements: IV - risk management, internal controls and internal audit structure: existence of an organizational structure aimed at managing these aspects and other related ones, eventually present in the institu…
  • Art. 2 The description of the aspects relating to the control environment provided for in art. 1, item I, must address the institution's control culture, including, at least, the following elements: V - involvement of senior management with internal control and risk management issues: existence of evidence regarding management's involvement in such issues; and
  • Art. 2 The description of the aspects relating to the control environment provided for in art. 1, item I, must address the institution's control culture, including, at least, the following elements: VI - training and awareness policy for the staff regarding risks and internal controls: existence of a formal training policy and its scope.
  • Art. 3 The description of the aspects relating to risk identification and assessment referred to in art. 1, item II, must address the processes for identifying and assessing internal and external factors that may impair the achievement of the organization's objectives, including, at least, the foll… I - processes for identifying and measuring market, credit and operational risks; and
  • Art. 3 The description of the aspects relating to risk identification and assessment referred to in art. 1, item II, must address the processes for identifying and assessing internal and external factors that may impair the achievement of the organization's objectives, including, at least, the foll… II - processes for validating pricing models and stress tests.
  • Art. 4 The description of the aspects relating to controls referred to in art. 1, item III, must address the activities of systematic monitoring, in order to allow the assessment of compliance with the institution's objectives, the established limits and the applicable laws and regulations, as well… I - policies and procedures regarding the segregation of activities, in order to avoid conflicts o…
  • Art. 4 The description of the aspects relating to controls referred to in art. 1, item III, must address the activities of systematic monitoring, in order to allow the assessment of compliance with the institution's objectives, the established limits and the applicable laws and regulations, as well… II - policies of specific and general authorizations;
  • Art. 4 The description of the aspects relating to controls referred to in art. 1, item III, must address the activities of systematic monitoring, in order to allow the assessment of compliance with the institution's objectives, the established limits and the applicable laws and regulations, as well… III - rules for the preparation of accounting and administrative reports;
  • Art. 4 The description of the aspects relating to controls referred to in art. 1, item III, must address the activities of systematic monitoring, in order to allow the assessment of compliance with the institution's objectives, the established limits and the applicable laws and regulations, as well… IV - accounting review and reconciliation processes, as well as periodic physical inspection proce…
  • Art. 4 The description of the aspects relating to controls referred to in art. 1, item III, must address the activities of systematic monitoring, in order to allow the assessment of compliance with the institution's objectives, the established limits and the applicable laws and regulations, as well… V - control procedures relating to risk management, including identification and quantification, r…
  • Art. 4 The description of the aspects relating to controls referred to in art. 1, item III, must address the activities of systematic monitoring, in order to allow the assessment of compliance with the institution's objectives, the established limits and the applicable laws and regulations, as well… VI - physical security; and
  • Art. 4 The description of the aspects relating to controls referred to in art. 1, item III, must address the activities of systematic monitoring, in order to allow the assessment of compliance with the institution's objectives, the established limits and the applicable laws and regulations, as well… VII - contingency or continuity plans.
  • The description mentioned in the caput must include controls aimed at preventing the institution's involvement in improper or illicit activities, in particular the procedures and controls to recognize, deter and report money laundering and terrorist financing activities.
  • Art. 5 The description of the aspects relating to information and communication referred to in art. 1, item IV, must cover the channels that ensure employees, according to their corresponding level of activity, access to reliable, timely and understandable information considered relevant to their t… I - security of the accounting systems and integration of the computerized systems with the instit…
  • Art. 5 The description of the aspects relating to information and communication referred to in art. 1, item IV, must cover the channels that ensure employees, according to their corresponding level of activity, access to reliable, timely and understandable information considered relevant to their t… II - process of disseminating, at all levels of the organization, the policies of internal control…
  • Art. 6 The description of the aspects related to monitoring and improvement referred to in art. 1, item V, must address the processes of review and updating of internal controls, in order to ensure the incorporation of measures related to new risks or to existing but unconsidered risks, including, … I - updating of assumptions, methodologies and risk management models;
  • Art. 6 The description of the aspects related to monitoring and improvement referred to in art. 1, item V, must address the processes of review and updating of internal controls, in order to ensure the incorporation of measures related to new risks or to existing but unconsidered risks, including, … II - attributions of internal audit related to internal controls, risk management and the frequenc…
  • Art. 6 The description of the aspects related to monitoring and improvement referred to in art. 1, item V, must address the processes of review and updating of internal controls, in order to ensure the incorporation of measures related to new risks or to existing but unconsidered risks, including, … III - continuous monitoring activities carried out during the development of operations; and
  • Art. 6 The description of the aspects related to monitoring and improvement referred to in art. 1, item V, must address the processes of review and updating of internal controls, in order to ensure the incorporation of measures related to new risks or to existing but unconsidered risks, including, … IV - periodic security tests of information systems, especially those maintained in electronic med…
  • Art. 7 The report of non-compliance with legal and regulatory provisions, provided for in art. 21, item III, of the Regulation annexed to Resolution No. 3,198, of 2004, and in art. 13, item III, of the Regulation annexed to Circular No. 3,192, of 2003, may be presented as part of the report on the assessment of the quality and adequacy of the internal controls system, including electronic data pr…
  • Art. 8 In preparing the reports mentioned in arts. 1 and 7, the norms and procedures determined by the Securities and Exchange Commission (CVM), the Federal Accounting Council (CFC) and the Institute of Independent Auditors of Brazil (Ibracon) must be observed, in aspects not conflicting with the regulations established by the National Monetary Council and the Central Bank of Brazil.
  • Art. 10. The institutions referred to in art. 1, when contracting or replacing independent audit services dealt with in arts. 1 of the Regulation annexed to Resolution No. 3,198, of 2004, and 1 of the Regulation annexed to Circular No. 3,192, of 2003, must register in the Information System on Enti… § 1 The data related to the contracted auditor must be kept updated in Unicad, observing the perio…
  • Art. 10. The institutions referred to in art. 1, when contracting or replacing independent audit services dealt with in arts. 1 of the Regulation annexed to Resolution No. 3,198, of 2004, and 1 of the Regulation annexed to Circular No. 3,192, of 2003, must register in the Information System on Enti… § 3 The documentation referred to in § 2 must be kept at the institution at the disposal of the Ce…
Not carried over (3)
  • Paragraph 2 The auditing services may be performed by an independent auditor - natural person or legal entity.
  • Paragraph 3 When there is a replacement of the person of the administrator referred to in this article, on the initiative of the administrator or of the institution, entity or administrator of which they are part, this decision must be communicated to the Regional Office of the Central Bank of Brazil to which they are subject, within 20 (twenty) days.
  • Art. 6 The information referred to in art. 6 of Resolution No. 2.267, of 29.03.96, must be communicated to the Regional Office of the Central Bank of Brazil to which the audited institution, entity or administrator is subject.

“Not carried over” means the sentence has no counterpart in this text; the rule can still be in force in another text.

Similar documents from other regulators

More like this from BCB

BCB published 15 documents in the last 30 days. We email you each new one the day it's published.

Source: Banco Central do Brasil — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works

In RegAlert: added