The European Securities and Markets Authority (ESMA) issued an opinion approving position limits set by the German Federal Financial Supervisory Authority (BaFin) for Gaspool natural gas futures traded on the European Energy Exchange. ESMA validated the spot month limit of 15% of deliverable supply and the other months limit of 35% of open interest as compliant with MiFID II and RTS 21 methodologies. The regulator emphasized the need for continued monitoring of trading patterns and timely reviews to ensure market integrity and prevent abuse.
ESMA • 201-203 rue de Bercy • CS 80910 • 75589 Paris Cedex 12 • France • Tel. +33 (0) 1 58 36 43 21 • www.esma.europa.eu OPINION on position limits on EEX GPL natural gas contracts I.Introduction and legal basis
III.Market description by the competent authority
3. Natural gas is a hydrocarbon gas mixture consisting largely of methane and other
hydrocarbons, occurring naturally underground (often in association with petroleum). It is used as a source of energy for heating, cooking, electricity generation, fuel for vehicles and chemical feedstock in the manufacture of plastics and other organic chemicals.
4. The German wholesale market for natural gas is split into two different but overlapping
transmission systems - GPL and NCG. GPL is the transmission system and virtual marketplace operated by Gaspool Balancing Services GmbH (GPL). Due to regulatory requirements GPL and NCG are going to be merged in October 2021 to form a single transmission system called Trading Hub Europe.
5. The German gas market is one of the biggest in Europe and relies mainly on pipeline imports
from Russia, Norway and the Netherlands. A variety of different privately-owned market participants are active in the German gas market ranging from transmission system operators and traders to storage operators.
6. Market participants active in GPL contracts can be classified as:
IV.Proposed limit and rationale
Spot month position limit
Deliverable supply calculation methodology
8. Deliverable supply amounts to 245,616,788 MWh.
9. The calculation of the deliverable supply is based on actual daily entry capacities of each of
the source type described below to the GPL market area. While the capacities of the system are relatively stable during the year, the flows of gas depend on the consumption, which depends on the weather conditions. This calculation takes into account the following sources:
1) Entry pipeline capacity = 4,004 GWh/d in 20185
2) LNG import capacity = 0 GWh/d6
3) Storage withdrawal capacity = 4,044 GWh/d in 20187
4) Average indigenous production in 2018 = 153 GWh/d in 20188
10. The total deliverable supply sums up to 8,201 GWh/d. This equates to 245,616,788 MWh
per month.
Spot month limit
11. Spot month limit amounts to 36,842,518 MWh, which corresponds to 15% of the
deliverable supply.
Spot month position limit rationale
12. The GPL contract is a derivatives contract referring to the future physical delivery of gas
into the GPL transmission system.
13. Since the GPL contract is not a food contract, its baseline figure for the spot month, was
calculated as 25% of the estimated deliverable supply, i.e. 25% * 245,616,788 MWh = 61,404,197 MWh.
14. There are less than three market makers. Thus, the limit is to be set within a range of 5%
Other months’ position limit rationale
22. The baseline figure for the other months limit amounts to 25% of open interest, i.e.
4,018,410 MWh.
23. The following factors were considered relevant for adjusting the baseline upwards:
Spot month position limit
31. The estimation of deliverable supply for natural gas is calculated by aggregating German
gas local production, the imports and transmission capacity from neighbouring countries and the average withdrawal rate from storage facilities.
32. ESMA considers that the deliverable supply calculation’s methodology is consistent with
Article 10(2) of RTS 21 that sets out that “Competent authorities shall determine the
deliverable supply (…) by reference to the average monthly amount of the underlying commodity available for delivery over the one year period immediately preceding the determination”.
33. Taking into account that the deliverable supply is significantly higher than the open
interest and the fact that the deliverable supply is also used for other contracts with the same underlying, ESMA considers it appropriate to adjust the spot month limit downwards, accordingly to Articles 17 and 18(3) of the RTS 21. Other months’ position limit
34. The open interest was calculated as the daily average over the period from August to
October 2019 of the number of open contracts that have not been closed out or expired. ESMA considers such an approach suitable as an average for a period of time gives a more stable measure of open interest and considers such approach consistent with Article 12 of RTS 21.
35. Compared to the baseline figure of 25% of overall open interest, the other months’
position limit has been adjusted upward to take into consideration the fact that the open
interest is significantly lower than the deliverable supply. This is consistent with Article 18(3) of RTS 21. Additionally, the other months’ limit has been adjusted upwards considering the large number of separate expiries as per Article 16(2) of RTS 21. Overall, the other months’ limit of 35% of the overall open interest seems adequate.
36. Consequently, these position limits have been set following the methodology established
by RTS 21.
Compatibility with the objectives of Article 57(1) of MiFID II
37. Under Article 57(1) of MiFID II, the objectives of the position limits are to prevent market
abuse and support orderly pricing and settlement. Based on the information provided by the competent authority ESMA notes that the spot month limit far exceeds the overall open interest in the GPL natural gas contracts.
38. ESMA understands the need to avoid the risk of unduly constraining in this contract.
However, there is a risk that the objectives set out in Article 57(1) of MiFID II may not be achieved where the spot month limit is well above the positions held by market participants.
39. In light of the assessment above, ESMA considers that the position limits set for the spot
month and for the other months achieve a reasonable balance between the need to prevent market abuse and to ensure an orderly market and orderly settlement while ensuring that the development of commercial activities in the underlying natural gas market and the liquidity of GPL contracts are not hampered.
40. However, to help ensure that the objectives set out in Article 57(1) of MiFID II are met,
ESMA considers that trading patterns in GPL contracts should be carefully monitored by the competent authority, in particular during the spot month, and that the limits should be reviewed on a timely basis. VI.Conclusion
41. Based on all the considerations and analysis presented above, it is ESMA’s opinion that
this spot month position limit does comply with the methodology established in RTS 21 and is consistent with the objectives of Article 57 of MiFID II. This other months’ position limit does comply with the methodology established in RTS 21 and is consistent with the objectives of
Article 57 of MiFID II.
Done at Paris,
Steven Maijoor
Chair
For the Board of Supervisors
Note from RegAlert. AI assistants can read this document in full, and search 70,000+ more, through the RegAlert MCP connector (https://mcp.regalert.today/mcp). Free with an account. How to connect ChatGPT, Claude or Cursor.
RegAlert holds no document that amends or replaces this one. This is not a check that it is in force: confirm with the regulator.
“ESMA received a notification from Federal Financial Supervisory Authority (BaFin) under Article 57(5) of Directive 2014/65/EU on markets in financial instruments”
“In accordance with Article 44(1) of Regulation (EU) 1095/2010 of the European Parliament and of the Council”
More like this from ESMA
ESMA published 9 documents in the last 30 days. We email you each new one the day it's published.
Source: European Securities and Markets Authority — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works
In RegAlert: added · updated