Guidance · HKMA · 3 Oct 2006
AIs are encouraged to consider the relevant high-level principles when reviewing and enhancing their existing business continuity plans. Financial industry participants and financial authorities should have effective and comprehensive business continuity management, with board and senior management collectively responsible; business continuity management should be proportionate to business risk and tailored to the scale and scope of operations, and should be an integral part of the overall risk management programme, implemented enterprise-wide or at a minimum embedded in critical operations. Participants should develop recovery objectives proportionate to the risk they pose to the financial system, incorporate comprehensive emergency communication protocols, address cross-border communications, and test plans and update management as appropriate.
Circulars
03 Oct 2006
Basel Committee on Banking Supervision's Paper on "High-level principles for business continuity" Our Ref: B1/15C 3 October 2006 The Chief Executive All Authorized Institutions Dear Sir / Madam, Basel Committee on Banking Supervision's Paper on "High-level principles for business continuity" The Basel Committee on Banking Supervision has recently issued a paper on certain highlevel principles for business continuity management which was developed by the Joint Forum Business Continuity Working Group1 . The purpose of the paper is to provide financial industry participants and financial authorities with guidance on how to improve the resilience of the financial system to major operational disruptions. A number of case studies and the related lessons learned are also set out in the annexes of the paper. The paper is a good reference for authorized institutions (AIs) and I enclose herewith a copy of the paper2 for your reference. AIs are encouraged to take into account the relevant high-level principles mentioned in the paper when reviewing and enhancing their existing business continuity plan. Yours faithfully, Arthur Yuen Executive Director (Banking Supervision) The Joint Forum Business Continuity Working Group was established in early 2005 to develop the high-level principles for business continuity following a request from the Financial Stability Forum in September 2004. The paper is also available on the BIS website (http://www.bis.org/publ/joint17.htm)
Encl. The Joint Forum (PDF file, 226KB)
Last revision date : 01 August 2011
Basel Committee on Banking Supervision
The Joint Forum
High-level principles for business continuity
August 2006
Requests for copies of publications, or for additions/changes to the mailing list, should be sent to:
Bank for International Settlements
Press & Communications
CH-4002 Basel, Switzerland
E-mail: publications@bis.org
Fax: +41 61 280 9100 and +41 61 280 8100
© Bank for International Settlements 2006. All rights reserved. Brief excerpts may be reproduced or translated provided the source is stated. ISBN print: 92-9131-722-5 ISBN web: 92-9197-722-5
THE JOINT FORUM
BASEL COMMITTEE ON BANKING SUPERVISION
INTERNATIONAL ORGANIZATION OF SECURITIES COMMISSIONS INTERNATIONAL ASSOCIATION OF INSURANCE SUPERVISORS C/O BANK FOR INTERNATIONAL SETTLEMENTS CH-4002 BASEL, SWITZERLAND High-level principles for business continuity August 2006
Table of contents
Glossary....................................................................................................................................1
Background and context...........................................................................................................5
Effective business continuity management...............................................................................7
The benefits of high-level principles .........................................................................................8
Target audiences......................................................................................................................9
Financial industry participants .........................................................................................9
Financial authorities ......................................................................................................10
High-level principles for business continuity ...........................................................................11
Principle 1: Board and senior management responsibility ..........................................12
Principle 2: Major operational disruptions ...................................................................13
Principle 3: Recovery objectives .................................................................................14
Principle 4: Communications.......................................................................................15
Principle 5: Cross-border communications..................................................................16
Principle 6: Testing......................................................................................................17
Principle 7: Business continuity management reviews by financial authorities ...........18
Annex I: Case Study: US-Canadian electrical power grid outages in August 2003 ...........19
Annex II: Case study: The impact of the 2003 SARS outbreak on
Hong Kong SAR’s securities markets ..................................................................23
Annex III: Case Study: The impact of the 2003 SARS outbreak on
the Canadian securities industry ..........................................................................27
Annex IV: Case study: Niigata Chuetsu earthquake.............................................................30
Annex V: Case Study: The London terrorist attacks on 7 July 2005 ...................................33
Annex VI: Bibliography .........................................................................................................36
Annex VII: Members of the Joint Forum Business Continuity Working Group ......................38
Glossary
Alternate site A site held in readiness for use during a business continuity event to maintain an organisation’s business continuity. The term applies equally to work space or technology requirements. Organisations may have more than one alternate site. In some cases, an alternate site may involve facilities that are used for normal day-to-day operations but which are able to accommodate additional business functions when a primary location becomes inoperable. Examples of alternate sites include relocation and disaster recovery sites, whether managed directly or maintained by a third party for an organisation’s exclusive use or for use by multiple organisations. Business continuity A state of continued, uninterrupted operation of a business. Business continuity management A whole-of-business approach that includes policies, standards, and procedures for ensuring that specified operations can be maintained or recovered in a timely fashion in the event of a disruption. Its purpose is to minimise the operational, financial, legal, reputational and other material consequences arising from a disruption. Business continuity plan A component of business continuity management. A business continuity plan is a comprehensive written plan of action that sets out the procedures and systems necessary to continue or restore the operation of an organisation in the event of a disruption. Business impact analysis A component of business continuity management. Business impact analysis is the process of identifying and measuring (quantitatively and qualitatively) the business impact or loss of business processes in the event of a disruption. It is used to identify recovery priorities, recovery resource requirements, and essential staff and to help shape a business continuity plan. Communication protocols Established procedures for communicating that are agreed in advance between two or more parties internal or external to an organisation. Such procedures typically include the methodology for transmitting, writing, and reading of data (eg e-mails and intranet for employees, teleconferences or meetings with identified internal or external parties, and press releases, website postings, or news conferences for the public or other external stakeholders). Such procedures also typically include the nature of information that should be shared with various internal and external parties and how certain types of information should be treated (eg public or non-public), High-level principles for business continuity 1
Critical market participants Participants in financial markets that perform critical operations or provide critical services. Their inability to perform such operations or provide such services for their own or others’ benefit could pose a significant risk of major disruption to the continued operation of individual participants or the financial system. Critical operation or service Any activity, function, process, or service, the loss of which would be material to the continued operation of the financial industry participant, financial authority, and/or financial system concerned. Whether a particular operation or service is “critical” depends on the nature of the relevant organisation or financial system. Data centre operations are an example of critical operations to most financial industry participants. Examples of critical services to financial systems include, but are not limited to, large value payment processing, clearing and settlement of transactions, and supporting systems such as funding and reconciliation services. Emergency response organisation An organisation responsible for responding to hazards to the general population (eg fire department, police services). Financial authorities A financial sector regulatory or supervisory organisation having some level of responsibility for safeguarding, and maintaining public confidence in, the financial system. Examples include prudential supervisors of securities firms, insurance companies, and banks and other deposit-taking institutions, as well as financial services consumer protection agencies and authorities with responsibility for stock and commodities exchanges. Non-supervisory central banks are included in their capacity as overseers of payment and settlement systems. Financial industry participants Financial institutions and other organisations that participate in the banking, securities and/or insurance sectors and that are subject to some level of regulation or supervision by one or more financial authorities. Examples include banks, securities firms, insurance companies, stock exchanges, operators of payment and settlement systems (including central banks that provide such services), messaging service providers (such as SWIFT), and self-regulatory organisations. International standard setting organisations Organisations whose responsibilities include defining prudential and other standards applicable to a specific group of financial industry participants operating in a particular financial services sector and in a geographic region encompassing more than one country. Examples include the Basel Committee on Banking Supervision (www.bis.org/bcbs), the International Organisation of Securities Commissions (www.iosco.org), the International Association of Insurance Supervisors (www.iaisweb.org), the standard setters for the banking, securities and insurance sectors respectively, and the Committee on Payment and Settlement Systems (www.bis.org/cpss), a forum for coordinating the
oversight functions of central banks with respect to payment systems. 2 High-level principles for business continuity
Major operational disruption A high-impact disruption of normal business operations affecting a large metropolitan or geographic area and the adjacent communities that are economically integrated with it. In addition to impeding the normal operation of financial industry participants and other commercial organisations, major operational disruptions typically affect the physical infrastructure. Major operational disruptions can result from a wide range of events, such as earthquakes, hurricanes and other weather-related events, terrorist attacks and other intentional or accidental acts that cause widespread damage to the physical infrastructure. Other events, such as technology viruses, pandemics and other biological incidents, may not cause widespread damage to the physical infrastructure but can nonetheless lead to major operational disruptions by affecting the normal operation of the physical infrastructure in other ways. Events whose impact is most significant are referred to as “extreme events”. They involve one or more of the following: the destruction of, or severe damage to, physical infrastructure and facilities; the loss or inaccessibility of personnel; and, restricted access to the affected area. Operational risk The risk of loss resulting from inadequate or failed internal processes, people and systems or from external events. Payment and settlement system A system consisting of a group of member firms and a set of instruments and procedures for the transmission and settlement of payments or financial instruments between members. Payment and settlement system operator An organisation that provides the processing services for transactions sent by participants in the payment and settlement system. The services provided could include the generation or processing of operational data, effecting of controls and security measures, and the clearing and settlement of payments or other obligations. Physical infrastructure Those assets, facilities and services provided by non-financial industry participants and widely depended on by business, governments and individuals for day-to-day activities. Examples include water, public health, emergency services, telecommunication and information services, energy, and transportation. Recovery The rebuilding of specific business operations following a disruption to a level sufficient to meet outstanding business obligations. Recovery level An element of a recovery objective. Recovery level is the target level of service that will be provided in respect of a specific business operation after a disruption. High-level principles for business continuity 3
Recovery objective A pre-defined goal for recovering specified business operations and supporting systems to a specified level of service (recovery level) within a defined period following a disruption (recovery time). Recovery time An element of a recovery objective. Recovery time is the target duration of time to recover a specific business operation. A recovery time has two components: the duration of time from the disruption to the activation of a business continuity plan; and, the duration of time from the activation of the business continuity plan to the recovery of the specific business operation. Resilience The ability of a financial industry participant, financial authority or financial system to absorb the impact of a major operational disruption and continue to maintain critical operations or services. 4 High-level principles for business continuity
High-level principles for business continuity
Background and context
industry participants have no direct control over their decisions when major operational disruptions occur.
4. Financial authorities in some of the key financial centres have been working closely
with financial industry participants to establish a consensus as to what constitutes acceptable standards for business continuity. This effort has been supported by recent private sector initiatives. For example, a number of groups have been established for the purpose of coordinating financial industry participants’ work in the area of business continuity management.2,3 In addition, some financial sector trade associations have taken a leading role in promoting sound business continuity management among their memberships through, for example, the publication of guidance on sound practices.4 Much of this work to date has been focussed at the national level. As a result, while the work has shared the same broad objective (ie enhancing the resilience of the financial system), it has generated a variety of outcomes, including the development of requirements and guidance by financial authorities in some jurisdictions.
5. Consistent with their focus on preserving the functionality of a financial system as a
whole, financial authorities undertaking these initiatives have tended to give priority to critical market participants. The lessons learned from past experience, however, are applicable to a broader audience.
6. At the international level, while there have been several regulatory initiatives on the
business continuity front, they have been concentrated mainly on coordinating cross-border communications in a crisis. For example, EU members signed an updated Memorandum of Understanding in May 2005 on information exchange during a financial crisis; all of the signatories are EU regulators, central banks and finance ministries. Examples of international business continuity initiatives with a broader focus include meetings of the Committee on Payment and Settlement Systems where central bank participants share their experiences in reviewing and enhancing business continuity plans. The Joint Task Force on Crisis Management, created by the Committee of European Banking Supervisors and the Banking Supervision Committee of the European Central Bank to formulate guidance and identify best practices for crisis management, is an example of similar initiatives at a regional level. To date, however, there has not been a concerted effort to draw together the lessons learned from major events and translate them into a set of business continuity principles that is relevant across national boundaries and financial sectors (ie banking, securities, and insurance).
7. In the summer of 2004, the Financial Stability Forum and the Bank of England cohosted a symposium on business continuity issues. Based on the findings of the symposium,
the Financial Stability Forum asked the sectoral standard setting bodies (the Basel Committee on Banking Supervision (BCBS), the International Organisation of Securities Commissions (IOSCO) and the International Association of Insurance Supervisors (IAIS)) or the Joint Forum to review approaches to business continuity across countries and financial
Conceptually, business continuity management is distinct from financial crisis management in that a financial crisis does not typically entail business continuity concerns. An event that gives rise to business continuity concerns, however, could develop into a financial crisis. Examples of private sector groups include the Securities Industry Business Continuity Management Group, an informal industry forum of the Securities Industry Association (www.sia.com), and ChicagoFIRST, a non-profit association dedicated to addressing emergency management issues affecting financial institutions and requiring a coordinated response (www.chicagofirst.org), in the United States. One example is “A Guide to Business Continuity Management” published in January 2003 by the British Bankers’ Association (www.bba.org.uk). 6 High-level principles for business continuity
sectors and consider whether it might be appropriate to develop high-level principles that could apply across the financial system globally.
8. The Joint Forum’s parent organisations (BCBS, IOSCO and IAIS) confirmed in
November 2004 that the Joint Forum should undertake such a review. Following an initial scoping exercise, the Joint Forum concluded in February 2005 that high-level principles on business continuity would contribute beneficially to the resilience of the global financial system. A formal working group of the Joint Forum (see Annex VII for a list of working group members) developed a set of high-level principles that were published in a consultative paper in December 2005. This paper is a revised version of the December 2005 consultation draft. Effective business continuity management
9. Business continuity management, a significant component of operational risk
management, is a whole-of-business approach that includes policies, standards, and procedures for ensuring that specified operations can be maintained or recovered in a timely fashion in the event of a disruption. Its purpose is to minimise the operational, financial, legal, reputational and other material consequences arising from a disruption. Effective business continuity management concentrates on the impact, as opposed to the source, of the disruption, which affords financial industry participants and financial authorities greater flexibility to address a broad range of disruptions. At the same time, however, organisations cannot ignore the nature of the risks to which they are exposed. For example, organisations located in earthquake-prone regions commonly plan for the impact of earthquake-related major operational disruptions.
10. Effective business continuity management typically incorporates business impact
analyses, recovery strategies and business continuity plans as well as testing programmes, training and awareness programmes, and communication and crisis management programmes. • •
organisation’s business continuity plan. The safety of staff should be the paramount consideration of an organisation’s business continuity plan. The benefits of high-level principles
11. The high-level principles set out in this paper are intended to support international
standard setting organisations and national financial authorities in their efforts to improve the resilience of financial systems to major operational disruptions. They are not sufficiently detailed to substitute for sectoral or national arrangements and are not intended for this purpose. Rather, they provide a broad framework for international standard setting organisations and national financial authorities to use in developing business continuity arrangements that are more detailed and more closely tailored to their unique sectoral and local circumstances. They also provide a consistent context for those arrangements and, in so doing, promote a common base level of resilience across national boundaries. Moreover, given the global nature of the financial industry and the role of financial authorities as the focal point for cross-border information exchange and action in the event of a major operational disruption, the principles encourage enhancements to the cross-border communication channels that would be used during such disruptions.
12. The high-level principles set out in this paper are therefore not intended to be
prescriptive, nor are they directed exclusively at those financial industry participants considered to be critical market participants. Rather, they constitute a broad framework of sound practice relevant to all financial industry participants and financial authorities in all jurisdictions. Broad applicability of the high-level principles, however, does not mean a onesize-fits-all approach to business continuity. An organisation’s business continuity management should be proportionate to its business risk (arising from both internal and external sources) and tailored to the scale and scope of its operations.
13. Operational disruptions of varying kinds and impact are commonplace –
organisations routinely accommodate such risks as computer malfunctions, power failures and transportation disruptions in their business continuity plans. From a corporate perspective, resilience to operational disruptions has a clear commercial rationale – customers of organisations whose systems are prone to regular failure as a result of relatively common events will inevitably choose to do business with more resilient competitors. In a competitive environment, an organisation typically will weigh its direct benefit from measures to improve its resilience to operational disruptions against the cost of those measures.
14. Similar cost-benefit considerations apply to measures for improving a financial
system’s resilience to operational disruptions. The benefits of improved systemic resilience accrue to all participants in that system (albeit to a varying extent), but in most cases such improvements are the result of investments in business continuity by individual financial industry participants. Because financial industry participants typically consider only their direct benefits and costs whereas financial authorities are expected to consider the broader public interest dimension, a natural tension exists between the levels of resilience that financial industry participants might consider reasonable for their own business purposes and the objectives of financial authorities for the resilience of the financial system as a whole. Recognising the shared interest in improving the resilience of the financial system, the highlevel business continuity principles set out in this paper represent an attempt to delineate a measured approach to business continuity that is sufficient in terms of its impact on the overall resilience of a financial system and, at the same time, proportionate to the risks posed by particular financial industry participants. Without diminishing the authority of financial authorities to ultimately determine the appropriate level of systemic resilience, an 8 High-level principles for business continuity
ongoing dialogue between all affected parties, reinforced through appropriate joint exercises and testing, should produce a reasonable and responsible outcome.
15. In formulating the high-level principles, careful account has been taken of the
lessons learned from recent instances of major operational disruption, some of which are summarised in the case studies set out in Annexes I to V. These case studies illustrate the general applicability of the principles. In addition, for each lesson learned a specific reference to the relevant principle is provided. Care was also taken to avoid unnecessary duplication of work that has already been undertaken in the business continuity area. A bibliography of the publications considered in the development of the principles is provided in Annex VI. Target audiences
16. The high-level business continuity principles in this paper have been developed for
two distinct but related audiences – financial industry participants and financial authorities. While these groups have different perspectives, roles and responsibilities in the event of a major operational disruption, both are integral in any meaningful effort to improve the financial system’s resilience to such disruptions. The same effort will not be required of every organisation in these groups to achieve the objectives of every principle in this paper. In fact, many organisations in both groups already have effective and comprehensive approaches to business continuity management. There are organisations in both groups, however, whose careful attention to these principles would not only improve their resilience to major operational disruptions but yield benefits for the resilience of the financial system more broadly. Financial industry participants
17. For the purpose of this paper, the term financial industry participants should be
understood in its broadest sense so that it captures not only financial institutions such as banks, securities firms, and insurance companies, but also those organisations that provide services that are necessary for financial systems to operate, such as stock and commodities exchanges, self-regulatory organisations, and payment and settlement system operators.
Financial sector trade associations are not included in the definition of financial industry participants; therefore, the highlevel principles in this paper do not apply to them. It is recognised nonetheless that these organisations play an important role in promoting effective business continuity management practices among their member firms. Depending on their roles in their respective markets, industry associations can also be helpful in other ways, such as in the planning and conducting of industry-wide tests and the development and maintenance of communication protocols. High-level principles for business continuity 9
major operational disruption generally would not render the markets in which they operate dysfunctional, except where that participant is a critical market participant. Principle 3 provides additional clarity on this distinction within this target audience and its implications for business continuity management. Financial authorities
19. The term financial authorities should be understood, for the purpose of this paper, to
include those organisations with financial sector regulatory or supervisory responsibilities. For example, prudential supervisory authorities with responsibilities for banks and other deposit-taking institutions, insurance companies, and securities firms are included, as are financial services consumer protection agencies and authorities responsible for overseeing financial markets. Non-supervisory central banks are also included in their capacity as overseers of payment and settlement systems. Because the mandates of financial authorities vary, however, the approach to business continuity management that is most appropriate for one financial authority may not be as appropriate for another.
20. As well as having to attend to their own business continuity in the event of a major
operational disruption, financial authorities have broader public responsibilities for safeguarding and maintaining public confidence in the financial system. For example, national governments might seek the advice of financial authorities regarding the deployment of resources and restoration of services. Financial authorities might also need to consider various types of regulatory forbearance to enable financial industry participants to focus on recovering critical operations and providing essential services to their clients. Therefore, the principles that apply to financial authorities explicitly incorporate the need to understand how a major operational disruption might affect the functioning of financial industry participants and the financial system as a whole, and to identify financial industry participants whose inability to recover their operations and resume normal business activities in a reasonable timeframe would have wider implications for the financial system. Because the mandates of financial authorities vary, however (eg some prudential supervisors are responsible for systemic issues while others are not), the extent to which a particular principle applies to a given financial authority might also vary.
In light of their responsibility for broader financial stability in many jurisdictions, central banks are likely to perform various other roles in the event of a major operational disruption. For purposes of this paper, however, central banks’ lender of last resort and monetary policy functions are not intended to be captured in this definition of financial authorities. 10 High-level principles for business continuity
High-level principles for business continuity
21. The high-level principles that follow are applicable to both financial industry
participants and financial authorities except for Principle 7, which is relevant only for financial authorities. Because of the different perspectives, roles and responsibilities of these two groups of organisations in the event of a major operational disruption, however, the way in which a particular principle applies may be different. The key differences in application are highlighted in the discussion that follows each principle.
22. The principles in this paper build upon traditional concepts of effective business
continuity management in the following ways:
•
•
•
•
participants and financial authorities to adopt communication protocols that address situations where cross border communication may be necessary. •
Business continuity management should be an integral part of the overall risk
management programme of financial industry participants and financial authorities. Business continuity management policies, standards and processes should be implemented on an enterprise-wide basis or, at a minimum, embedded in an organisation’s critical operations. Comprehensive business continuity management addresses not only technical considerations but also the human dimension. In so doing, it recognises that employees and possibly their families may be affected by the same event that gives rise to business continuity concerns and that, as a result, not all employees will be available to the organisation during or immediately following the event.
An organisation’s board and senior management are responsible for managing its
business continuity effectively and for developing and endorsing appropriate policies to promote resilience to, and continuity in the event of, operational disruptions. They should recognise that outsourcing a business operation does not transfer the associated business continuity management responsibilities to the service provider. The board and senior management should create and promote an organisational culture that places a high priority on business continuity. This message should be reinforced by providing sufficient financial and human resources to implement and support the organisation’s approach to business continuity management.
A framework should be implemented for reporting to the board and senior
management on matters related to business continuity, including implementation status, incident reports, testing results and related action plans for strengthening an organisation’s resilience or ability to recover specific operations. An organisation’s business continuity management should be subject to review by an independent party, such as internal or external audit, and significant findings should be brought to the attention of the board and senior management on a timely basis.
Confusion can be a major obstacle to an effective response to an operational
disruption. Accordingly, roles, responsibilities and authority to act, as well as succession plans, should be clearly articulated in an organisation’s business continuity management policies. Senior management should recognise that they may need to re-align priorities and resources during a disruption in order to expedite recovery and respond decisively. It is important that a locus of responsibility for managing business continuity during a disruption is established, such as a crisis management team with appropriate senior management membership. In addition, senior management should be involved in communicating the organisation’s response, commensurate with the severity of the disruption. 12 High-level principles for business continuity
In the case of financial authorities, the board and senior management should be
confident in the authority’s ability to fulfil its mandate during an operational disruption that affects its own operations or those of the financial system. Accordingly, they should be satisfied that the authority’s powers provide for sufficient flexibility to respond appropriately and expeditiously to the wide range of issues that might arise under such circumstances. Given the interdependencies within financial systems, it would be useful for financial authorities that share oversight responsibilities for a given financial system to agree on an appropriate framework for coordinating the response to major operational disruptions affecting that system. Principle 2: Major operational disruptions Financial industry participants and financial authorities should incorporate the risk of a major operational disruption into their approaches to business continuity management. Financial authorities’ business continuity management also should address how they will respond to a major operational disruption that affects the operation of the financial industry participants or financial system for which they are responsible.
Major operational disruptions pose a substantial risk to the continued operation of
financial industry participants and financial authorities, as well as to the operation of the financial system. Accordingly, all financial industry participants and financial authorities should incorporate the risk of a major operational disruption in their business continuity plans. The extent to which a financial industry participant prepares to recover from a major operational disruption should be based on its unique characteristics and risk profile. Because access to the resources needed for the full recovery of its operations may be limited during a major operational disruption, a financial industry participant should identify through a business impact analysis those business functions and operations that are to be recovered on a priority basis and establish appropriate recovery objectives for those operations.
During a major operational disruption, the operation of the financial system will be of
keen importance nationally and, possibly, globally. A financial authority will be expected to play a major role in monitoring the status of the financial markets and financial industry participants for which it is responsible. Depending on its mandate, a financial authority might also be expected to coordinate efforts to recover critical services to the financial system.
Major operational disruptions vary in intensity, scope and duration. In many cases,
organisations may be able to remain at their primary business locations if they have sufficient backup for power and other essential services. Recent experience, however, has demonstrated that some major operational disruptions constitute extreme events whose impact can be very broad in scope, duration or both. In evaluating whether their own business continuity management is sufficient to accommodate such major operational disruptions, financial industry participants and financial authorities should review the adequacy of their recovery arrangements in the following three important areas. •
that its primary offices are severely damaged or access to the affected area is restricted.
impact a disruption of their operations would have on the financial system or on the expectations of other financial industry participants. In assessing the reasonableness of an organisation’s recovery objectives, financial authorities are strongly encouraged to consider the increased risk of failed transactions, liquidity dislocations, solvency problems, and loss of confidence that accompany prolonged disruptions in the financial system.
33. Recovery objectives should identify expected recovery levels and recovery times for
specific activities. Although they may not be achievable in every circumstance, recovery objectives provide financial industry participants with benchmarks for testing the effectiveness of their business continuity management. They also provide some assurance that financial industry participants representing similar external risks will attain a consistent level of resilience. When identifying recovery objectives, it would also be appropriate to identify appropriate timeframes for implementing those objectives. Principle 4: Communications Financial industry participants and financial authorities should include in their business continuity plans procedures for communicating within their organisations and with relevant external parties in the event of a major operational disruption.
34. The ability to communicate effectively with relevant internal and external parties in
the event of a major operational disruption is essential for financial industry participants and financial authorities alike. Particularly in the early stages of a disruption, effective communication is necessary to gauge the impact of the disruption – on an organisation’s staff and operations, and on the broader financial system – and make appropriate decisions about whether to invoke a business continuity plan. As time progresses, the ability to communicate the best available information to the appropriate parties in a timely fashion is critical to the recovery of an organisation’s operations and to the return of the broader financial system to normal operation. Maintaining public confidence, whether in an individual financial industry participant or in the financial system as a whole, requires clear, regular communication throughout the duration of a major operational disruption.
35. Accordingly, and also because of the added pressure that is often associated with
decision-making during a major operational disruption, the business continuity plans of financial industry participants and financial authorities should incorporate comprehensive emergency communication protocols and procedures. For example, a financial industry participant would need to consider the external parties with whom it should communicate, such as the relevant financial authorities, other financial industry participants, the public and other stakeholders, as well as how best to communicate with them and within its own organisation. It may also be necessary for a participant to obtain information from financial authorities and other financial industry participants regarding the status of the financial system, as well as from organisations that provide physical infrastructure services regarding the status of any services required for the implementation of the participant’s business continuity plan. A financial authority will need to consider similar issues, but its emergency communication procedures should also reflect its broader responsibilities. For example, a financial authority may want to consider issuing public statements during a crisis to assure the markets and the public that appropriate measures are being taken and inform them of those measures. In cases where financial authorities share oversight responsibilities for a group comprising more than one financial industry participant, it may be beneficial for those High-level principles for business continuity 15
authorities to designate one from their midst as the "coordinator" for purposes of facilitating communication during a major operational disruption affecting the group.11
36. The communication procedures of financial industry participants and financial
authorities generally should:
•
•
•
•
Because of the deepening interdependencies among financial industry participants
across jurisdictions, it is increasingly likely that the impact of a major operational disruption will extend across national borders. Addressing disruptions that cross national borders introduces additional complexity. Although domestic communication procedures may be reasonably well-defined in the business continuity plans of many financial industry participants and financial authorities, special attention is warranted in preparing for disruptions with international scope. 11 For a more in-depth discussion of the “coordinator” concept, see Coordinator Paper, Joint Forum, February 1999 (http://www.bis.org/publ/joint02.pdf#page=105). 16 High-level principles for business continuity
Financial industry participants should consider the possibility that a disruption of
their business operations in one jurisdiction would affect significant subsidiary or branch operations or otherwise affect the financial system in other jurisdictions. Where this outcome is possible, a financial industry participant’s communication protocols should address the circumstances under which it would contact the relevant non-domestic financial authorities. Financial authorities should incorporate communication protocols in their business continuity plans for communicating with financial authorities in other jurisdictions in the event of a major operational disruption that affects (or could affect) the continued operation of the international financial system. Although it was developed to address financial crises and not business continuity events, per se, the Memorandum of Understanding on co-operation between the Banking Supervisors, Central Banks and Finance Ministries of the European Union in Financial Crisis situations (2005)12 provides a useful example of what such communication protocols might entail. It comprises a set of principles and procedures for sharing information, views and assessments among the authorities potentially involved in a crisis situation, as well as arrangements for the development of contingency plans for the management of crisis situations and stress testing and simulation exercises.
These communication protocols should build on existing cross-border relationships
and multi-jurisdictional protocols by identifying the types of officials at financial authorities who might need to be involved in responding to such disruptions and including the relevant contact information. Examples of existing contact lists include the Crisis Management Contact List maintained by the Financial Stability Forum covering central banks, supervisory agencies, finance and treasury departments, and key international financial institutions in some 30 countries and the Bank Supervisors’ Contact List maintained by the BCBS listing supervisory contacts around the world.13 It is likely that communication with financial authorities in other jurisdictions would take place at several levels simultaneously, with senior decision-makers and more technical or specialised staff members in one organisation holding discussions with their respective counterparts at the other.
Financial authorities, in particular, are encouraged to hold periodic discussions with
relevant financial authorities in other jurisdictions to develop a shared understanding of the events that could have significant cross-border effects on the financial system and agree on procedures for communicating with one another under such circumstances and the issues that should be addressed. The issues that might be covered in the event of cross-border disruptions would include, for example, the impacts of the disruption in their respective markets and its contagion effects, if any; issues involving emergency closures or suspensions of major markets; changes in trading hours or clearing and settlement periods; and, the details of any regulatory forbearance that may have been extended. Principle 6: Testing Financial industry participants and financial authorities should test their business continuity plans, evaluate their effectiveness, and update their business continuity management, as appropriate.
Testing the ability to recover critical operations as intended is an essential
component of effective business continuity management. Such testing, which can take many forms, should be conducted periodically, with the nature, scope and frequency determined by
12 The MOU is a confidential document and is not available to the general public. The press release that accompanied the MOU’s publication in May 2005 includes information about its objectives, contents and signatories. 13 These contact lists are prepared for their respective constituencies and are not available to the general public. High-level principles for business continuity 17
the criticality of the applications and business functions, the organisation’s role in broader market operations, and material changes in the organisation’s business or external environment. In addition, such testing should identify the need to modify the business continuity plan and other aspects of an organisation’s business continuity management. In some cases, this need could arise as a result of changes in its business, responsibilities, systems, software, hardware, personnel, or facilities or the external environment. An independent party, such as internal or external audit, should assess the effectiveness of the organisation’s testing programme, review test results and report their findings to senior management and the board. Senior management and the board should ensure that any gaps or shortcomings reported to them are addressed in an appropriate and timely manner.
42. Financial authorities should strongly encourage financial industry participants that
present risk to the financial system to conduct tests from their alternate sites with relevant critical market participants and payment and settlement system operators. Financial authorities and key financial industry participants are also encouraged to participate in market- or industry-wide tests to assess the level of resilience across markets and the compatibility of the recovery strategies of individual participants. In light of the substantial costs involved, the decision to undertake a market- or industry-wide test should be based on a thorough cost-benefit analysis.
43. In addition to ensuring that business continuity plans are evaluated and updated as
necessary, testing is also essential for promoting awareness, familiarity and understanding among key personnel of their roles and responsibilities in the event of a major operational disruption. It is important, therefore, that testing programmes should involve all personnel who are likely to be involved in responding to major operational disruptions. Principle 7: Business continuity management reviews by financial authorities Financial authorities should incorporate business continuity management reviews into their frameworks for the ongoing assessment of the financial industry participants for which they are responsible.
44. Financial authorities should expect financial industry participants to develop and
implement effective business continuity management that is updated on an ongoing basis. Financial authorities should incorporate business continuity management reviews into their frameworks for the assessment of financial industry participants. The nature, scope and frequency of the reviews will be determined by the requirements of their regulatory or supervisory frameworks. Assessments should give due consideration to whether a participant’s business continuity management, including its recovery objectives, is appropriate for the size and scope of its business and the risk the participant presents to the continued operation of the financial system. Financial authorities should also assess whether participants are taking appropriate steps to augment their business continuity management, where necessary. Where financial authorities share responsibility for the same financial industry participant, it would be useful for those authorities to agree on a framework for coordinating those reviews.
45. In the course of reviewing a participant’s business continuity management, a
financial authority should assess whether the testing programme provides adequate assurance that business processes can be recovered as intended. 18 High-level principles for business continuity
Annex I
Case Study: US-Canadian electrical power grid outages in August 2003 Event
On Thursday 14 August 2003, cascading failures of electrical power grids in the
northeast United States and most of eastern Ontario, Canada resulted in power outages that, in some areas, lasted well into the weekend. Impact
Without warning, the grid failures shut down utility electrical power in financial
centres such as New York City and Toronto starting around 16:11 local time on 14 August. Backup electrical power systems at securities exchanges, clearing organisations, and a large number of financial industry participants in the affected areas were activated automatically, enabling those organisations to avoid a sudden disruption in their systems or loss of essential data. Because the outage occurred near the normal end of the business day and perhaps because of initial uncertainties over whether the outage was the result of a terrorist attack, people were sent home by their employers or otherwise chose to evacuate the New York financial district – many left on foot because street traffic was jammed and mass transit was largely inoperable. No panic was evident, however, perhaps as a result of public statements by local and federal officials within an hour of the start of the event that there was no evidence that the power outage was terrorist-related. The financial system and its participants were largely able to complete their end-of-day operations in an orderly fashion.
The electrical outage continued in New York City and Toronto overnight and into the
next day (15 August). Most major US and Canadian equity markets were able to maintain normal trading hours that day, while bond markets held an abbreviated trading session to allow traders more time to head home for the weekend. Wholesale and retail payments and trading and settlements proceeded with only a few delays. The large majority of banks had established backup power at larger branches and retail banking services were adequate to meet consumer needs, although numerous stand-alone ATMs stopped functioning on Thursday night. Individual bank branches that did not have backup power were closed on Friday. In a few cases, all of a US rural bank’s operations were closed for all of Friday due to lack of power.
The sector experienced some telecommunication problems related to the power
outage. Some of these problems affected entire telecommunication networks that had insufficient backup power at some central office switches. In other cases, some firms found that their backup electrical generators did not support their internal telephone systems, rendering their digital telephones inoperable, while their analogue-line telephones (which receive power over their land lines and bypass internal telecommunication switching systems) continued to function. In addition, mobile phones soon became inoperable due to message congestion, insufficient backup power at transmission and relay sites, and the inability of individuals to recharge their mobile phones’ batteries. High-level principles for business continuity 19
There were no discernable effects on consumer confidence in the US or Canadian
financial systems. On the whole, consumers were patient and proved able to cope with the situation, including the temporary loss of access to local branches and ATM machines. There were no unusual currency demands or runs on banks, nor were there any sell-offs in mutual fund markets. Response
A number of financial industry participants, particularly organisations that support
payment and settlement systems, responded to the outage by activating their backup power generators. Many also activated their alternate sites as a precautionary measure.
Many other organisations had provided for abundant backup power at their primary
sites as part of their business continuity plans and did not need to relocate because there was no immediate threat to the safety of their personnel. Given the disruption of mass transit, many of these organisations implemented plans to have key staff remain overnight at or near their primary sites to ensure that critical operations could be maintained.
Some financial industry participants that chose not to activate their alternate sites
were subsequently confronted with unanticipated problems. For example, the American Stock Exchange (Amex) did not activate its remote alternative trading floor because the exchange’s primary trading floor appeared to have sufficient backup electrical power. At around 2:00 on 15 August, however, utility-provided steam power to the air conditioning systems that are essential for maintaining the exchange’s electronic systems began to fail at Amex’s primary trading floor. By the time the problem was discovered, there was insufficient time to activate and staff the alternate site (which was unaffected by the steam power failure in Manhattan). Instead, Amex held an abbreviated trading session on 15 August after a backup generator was located and installed.
US and Canadian financial authorities activated communication protocols with their
respective critical market participants and other domestic financial authorities. Financial authorities conducted a series of calls with their affected institutions in the evening of 14 August and throughout 15 August to determine how they were coping with the outage and whether they required assistance in maintaining critical operations. In addition, financial authorities held a series of inter-agency conference calls throughout the event that provided an opportunity for banking, securities, and futures regulators to share information on how each sector was responding to the emergency.
US financial authorities invited officials from the New York City Office of Emergency
Management (NYCOEM) to participate in conference calls with the exchanges and clearing organisations about how this major financial centre was responding to the infrastructure failure. In these calls, NYCOEM officials were able to provide vital information concerning the status of local power, telecommunication, and transportation services and probable
14 Many large international exchanges have reciprocal communication protocols that are designed to share critical information concerning developments at one exchange that might affect trading in products that are traded on other exchanges. For example, following the events of 11 September 2001, officials at leading US exchanges kept their counterparts at exchanges in Asia, Europe, and North and South America informed about when US trading was likely to resume. This was not an issue during the 2003 power outage, however, because the NYSE and NASDAQ both issued news releases around 18:00 on 14 August indicating that they planned to trade normally the next day, thereby avoiding the need to call officials at other international exchanges. 20 High-level principles for business continuity
restoration schedules. In addition, when NYCOEM officials learned of Amex’s problems with utility-supplied steam power, NYCOEM officials were able to assist the exchange by arranging for the installation of a backup steam generation boiler, which enabled Amex to conduct an abbreviated trading session on 15 August.
11. Announcements made by national security officials and local government officials
shortly after the commencement of the outage may have contributed to consumer confidence. Moreover, consumer confidence appears to have been strengthened by the fact that the financial services sector, including highly visible organisations such as the stock exchanges, remained largely operational. Lessons learned
12. Upon restoration of the power supply, financial authorities in the United States and
Canada analysed how they and their financial industry participants responded to the challenges posed by this major operational disruption. Overall, these “lessons learned” exercises indicated that:
•
•
•
•
and develop and implement “work-around” arrangements to maintain critical operations. (Principle 4) •
Annex II
Case study: The impact of the 2003 SARS outbreak on Hong Kong SAR’s securities markets Event
Hong Kong experienced a serious outbreak of SARS in 2003, the first major
epidemic to affect the region in recent times. The outbreak originated with the arrival in late February 2003 of a carrier from mainland China and ended officially on 23 June 2003 when the World Health Organisation removed Hong Kong from the list of affected countries. Before the spread of the virus was arrested, the outbreak in Hong Kong would trigger similar outbreaks in Canada, Singapore and Vietnam.
The Hong Kong SARS outbreak was preceded by a similar outbreak in the
neighbouring Guangdong Province of China. The local news media in Hong Kong were the first to report on the outbreak and spread of the disease, but little information about SARS was available in the early stages of the outbreak from the Chinese government, local health authorities or other official sources. As a result, rumours were rife in Hong Kong and anxiety was high until the outbreak was brought under control. Impact
The 2003 SARS outbreak resulted in 1,755 cases and 300 deaths in Hong Kong
alone. In addition to the tragic loss of life, the epidemic caused widespread fear and anxiety in the local community and had a significant impact on employment levels and the economy overall.
The Hong Kong securities industry did not experience major disruptions as a direct
result of the outbreak. There was no serious spread of infection in the industry and the few individuals who were quarantined during the outbreak developed no sign of illness. Some of the measures introduced by the local financial authorities, brokerages and other market participants to slow the spread of the disease and the fear that permeated the local business community did affect the normal efficiency of day-to-day operations. Response
At the time of the outbreak, Hong Kong’s securities market encompassed more than
400 securities and 100 futures brokerages as well as hundreds of investment advisers, fund managers and other market participants. Although the global investment banks account for more than half of the turnover in the securities market today as they did then, the majority of brokerages (over 350) are local firms servicing the retail market. In addition to having to be licensed by the SFC, brokerages that trade in the securities, futures or options markets must be trading participants of HKEx, the parent company of the Stock Exchange of Hong Kong and the Hong Kong Futures Exchange. High-level principles for business continuity 23
The Hong Kong Securities and Futures Commission (SFC) is the frontline regulator
for market intermediaries and the HKEx. All securities, futures and stock options transactions are electronically cleared and settled through clearing entities that are wholly owned subsidiaries of HKEx.
All relevant financial authorities and most brokerages and other relevant market
participants, including the operators of securities clearing and settlement systems, implemented preventative measures to slow the spread of SARS, although not all at the same stage of the outbreak. For example, because of the shortage of reliable information in the initial stages of the outbreak about SARS and the extent to which it had spread in Hong Kong, it was not before the SFC learned of the preventative measures put in place by firms in the global investment banking community that SFC management created an internal task force on 26 March 2003 to deal with the internal and market impacts of the outbreak. HKEx created a similar internal task force and the two met daily to formulate policies and procedures, monitor their implementation, and track cases where market participants and SFC or HKEx staff or their families were affected.
The measures introduced by the relevant Hong Kong financial authorities to address
the internal impacts of the outbreak varied from one organisation to another. They included the following:
•
•
•
•
•
business continuity procedures of particular relevance to the outbreak. Relevant information from local health authorities was also circulated to all market participants. • • • • • • •
event of a major operational disruption. SARS made it clear that that assumption is not always valid. The suspicion that one member of staff was infected would have been sufficient to cause an entire division to be quarantined and its operations to be shut down for at least ten days. Those plans nonetheless had to be revised during the outbreak to account for such impacts. (Principle 2) • • •
Annex III
Case Study: The impact of the 2003 SARS outbreak on the Canadian securities industry Event
•
•
•
•
•
•
•
•
virus and how it is spread. The swift response and the nature of the steps taken may well have prevented a more serious outcome. (Principle 1) •
Annex IV
Case study: Niigata Chuetsu earthquake
Event
certificate or passbook is lost and replace dirty, torn or otherwise mutilated money and insurance companies to pay insurance benefits promptly and extend moratoria on premium payments.
7. Because of the heavy volume of calls experienced by telephone carriers in the
aftermath of the earthquake, it took some time before financial authorities were able to communicate with financial institutions in the affected areas. However, the telephone numbers that financial institutions and financial authorities had shared previously for contact outside of normal business hours proved helpful.
8. Japanese authorities implemented an emergency calling tree that included the
relevant domestic authorities, such as the Cabinet Office, Ministry of Finance, Bank of Japan, Financial Services Agency, Disaster Countermeasures Office of Niigata Prefecture, Niigata Prefectural Government and a number of industry organisations. Most authorities used a priority telephone service in the initial stage of the response, while a central wireless system was used for communication between the Cabinet Office and other relevant authorities.
9. Most financial institutions were able to confirm the safety of their employees and
ascertain the nature and extent of damage to their facilities by the day following the quake. Others, however, had difficulty confirming the status for a few days afterward. Financial institutions were asked to report to the Niigata Finance Office and the Bank of Japan (Niigata Branch) on the damage they had incurred and whether they were capable of operating.
10. Before the earthquake, many of the businesses operating in the Chuetsu region of
Niigata prefecture had well-developed policies requiring backup power sources and lines to cope with the frequent lightning strikes in the region. Consequently, more than 90% of the retail premises operated by regional banks in Niigata have their own power generating facilities.
11. Financial institutions used alternate routes to transport cash in the areas where the
transportation infrastructure was severely damaged. Some had cooperative schemes with other financial institutions that enabled prompt cash delivery to their partners. Although financial institutions in Japan are normally closed on weekends, many in the region affected by the earthquake opened on weekends and introduced low-interest loan facilities to meet the special needs of customers in the region.
12. When an earthquake occurs in Japan, insurance companies are required to handle
associated claims (ie claims under policies covering fire and earthquake damage) expeditiously and make the operation of their service centres (regional offices responsible for processing claims) their highest priority. Consequently, they have developed business continuity plans with an emphasis on service centre operation and were able to deal effectively with large-scale loss inquiries and insurance payments and draw upon their high level of liquidity to cover claims in response to the Niigata Chuetsu earthquake. Lessons learned
13. The lessons learned from the Niigata Chuetsu earthquake include the following:
•
•
•
Annex V
Case Study: The London terrorist attacks on 7 July 2005 Event
which they had been affected by the events and, on the basis of that information, to make an overall judgement on whether the financial sector was at risk of substantive disruption. Lessons Learned
8. To more accurately gauge the impact of the events on the financial sector and the
financial sector’s response, the UK financial authorities conducted a survey of major financial institutions immediately afterward. It was clear from their responses that several important lessons had been learned, as summarised below. • • • • •
•
•
•
•
•
Annex VI
Bibliography
Australian Prudential Regulation Authority (2005): Guidance note AGN 232.1 (Authorised Deposit-Taking Institutions) and GGN 222.1 (General Insurers), Risk assessment and business continuity management, April, http://www.apra.gov.au/Policy/loader.cfm?url=/commonspot/security/getfile.cfm&PageID=8529, and http://www.apra.gov.au/General/loader.cfm?url=/commonspot/security/getfile.cfm&PageID=8532.
Annex VII
Members of the Joint Forum Business Continuity Working Group Chairman: John Sloan (UK FSA) Australia: Heidi Richards (APRA) Canada: Judy Cameron (OSFI) Randee B. Pavalow (OSC) France: Alain Dequier (Commission Bancaire) Hong Kong SAR: Angelina Kwan (Securities and Futures Commission) Japan: Ei-ichiro Fukase (Bank of Japan) The Netherlands: Rick Angevaare (DNB) UK: John Milne (FSA) USA: Angela Desmond (FRB) Alton Harvey (SEC) Mike Yuenger (OCC) CPSS liaison: Benjamin Hanssens (CPSS Secretariat) Secretariat: Jeff Miller (Joint Forum Secretariat) 38 High-level principles for business continuity
Note from RegAlert. AI assistants can read this document in full, and search 70,000+ more, through the RegAlert MCP connector (https://mcp.regalert.today/mcp). Free with an account. How to connect ChatGPT, Claude or Cursor.
More like this from HKMA