Individual decision · CFTC · 15 Apr 2002 · CFTC Staff Letter 02-51

CFTC Letter 02-51: Extension of Time to File 2001 Annual Report for Commodity Pool Operator

The Division of Trading and Markets grants X Inc., a commodity pool operator, an extension until May 30, 2002, to file the unaudited 2001 Annual Report for Y Fund LP. Although the operator does not qualify for the standard extension under Rule 4.22(f)(2) because it does not intend to have the report certified, the Division determined that granting this specific extension is not contrary to the purposes of Rule 4.7 or the public interest. The relief applies solely to the 2001 fiscal year, and future filings must comply with the 90-day requirement of Rule 4.7 or meet the specific qualifications for Rule 4.22(f)(2) if an audited report is prepared.

US FederalCommodity Futures Trading Commission

More like this from CFTC

CFTC published 2 documents in the last 30 days. We email you each new one the day it's published.

Source: Commodity Futures Trading Commission — original document · Summary generated with machine assistance and reviewed before publication; the authoritative text is the regulator's original document. How RegAlert works

In RegAlert: added · updated