Guidance · HKMA · 13 Apr 2026

Revised Supervisory Policy Manual Module IC-5 on Stress-testing

Applies to: All regulated firms

The Hong Kong Monetary Authority issued this non-statutory guideline to establish expectations for Authorized Institutions regarding the design and implementation of effective stress-testing programmes. The document mandates that institutions maintain robust governance structures with clear Board and senior management oversight, ensuring stress tests are integrated into strategic decision-making and risk appetite setting. It further outlines requirements for comprehensive policies, methodologies, and independent reviews to assess vulnerabilities under adverse conditions and support capital and liquidity adequacy.

Hong KongHong Kong Monetary Authority

Lineage: No known changes

RegAlert holds no document that amends or replaces this one. This is not a check that it is in force: confirm with the regulator.

IC-5 Guideline No. V.2 dated2012-05-09Not in RegAlertIC-5 Guideline No. V.2 dated 2012-05-09 — Not in RegAlertMentions (10)documents this one mentionsopen the list below the graph ▾Mentions (10): documents this one mentions without changing it — open the list below the graphRevised Supervisory PolicyManual Module IC-5 on Stress-…2026-04-13 · this documentRevised Supervisory Policy Manual Module IC-5 on Stress-testing (2026-04-13)
amendssupersedesissued underrefers todashed card: not in RegAlert (or proposed)arrows run from the older text to the one that changes it
The links and the sentences they come from (1)
Supersedes
  • IC-5 Guideline No. V.2 dated 2012-05-09Not in RegAlert

    “Previous guidelines superseded IC-5 “Stress-testing” (V.2) dated 09.05.12”

Mentions (10): 10 documents this one mentions without changing them
Refers to
  • “More specific guidance on the use of stress tests ... is contained in other SPM modules and Code of Practice, including: CR-G-8 “Large Exposures and Risk Concentrations”;”

  • “More specific guidance on the use of stress tests ... is contained in other SPM modules and Code of Practice, including: CA-G-5 “Supervisory Review Process”;”

  • “More specific guidance on the use of stress tests ... is contained in other SPM modules and Code of Practice, including: CA-G-4 “Validating Risk Rating Systems under the IRB Approaches”;”

  • “More specific guidance on the use of stress tests ... is contained in other SPM modules and Code of Practice, including: LFIR-1 “Resolution Planning – Liquidity and Funding in Resolution”, the Code of Practice chapter issued under the Fina…”

  • “More specific guidance on the use of stress tests ... is contained in other SPM modules and Code of Practice, including: CR-G-13 “Counterparty Credit Risk Management”;”

  • “More specific guidance on the use of stress tests ... is contained in other SPM modules and Code of Practice, including: LM-2 “Sound Systems and Controls for Liquidity Risk Management”;”

+4 more

Similar documents from other regulators

More like this from HKMA

HKMA published 2 documents in the last 30 days. We email you each new one the day it's published.

Source: Hong Kong Monetary Authority — original document · Summary generated with machine assistance and checked by an AI reviewer before publication; the authoritative text is the regulator's original document. How RegAlert works

In RegAlert: added · updated